roofy

11a West 84 Street

Manhattan, NY 10024BBL 1-01198-0024Map

Owner of record: 84 Associates NY LLC

11a West 84 Street is an elevator apartment building built in 1892 in Manhattan, 10024. It has 20 residential units across 5 floors. The owner of record is 84 Associates NY LLC. HPD has recorded 15 housing violations here, most recently on January 1, 2021. City tax records listed 11 rent-stabilized apartments here in 2024.

HPD violations
15
DOB violations
11
ECB violations
16
HPD complaints
196

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Jan 1, 2021

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
11
About 55% of the building's 20 apartments
Up from 10 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 15

  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north located at apt 2a, 2nd story, 1st apartment from south at west

    Jan 1, 2021 · Apt 2A

    Closed — Violation dismissed
  • B

    Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods at building front at north at fire escape

    Jan 1, 2021

    Closed — Violation dismissed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system ... at public hall, 1st story

    Dec 14, 2017

    Closed — Violation dismissed
  • C

    Properly repair with similar material the broken or defective corroded metal intermedate landing at stair leading to cellar building front

    May 18, 2017

    Closed — Violation closed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 4b, 4th story, 2nd apartment from north at east

    Oct 1, 2013 · Apt 4B

    Closed — Violation dismissed
  • C

    Properly repair with similar material the broken or defective loose ornament design at 1st and 4th window from west to east ,on 2nd story building front exterior wall

    Oct 1, 2013

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective concrete facade at building front all stys

    Oct 1, 2013

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) ceiling, 1st door from west at north wall, 1st riser from north at east wall, east wall, 1st window frame from north at east wall in the 1st room from north located at apt 4b, 4th story, 2nd apartment from north at east

    Oct 1, 2013 · Apt 4B

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, west wall in the bathroom located at apt 4b, 4th story, 2nd apartment from north at east

    Oct 1, 2013 · Apt 4B

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, south wall, east wall in the kitchen located at apt 4b, 4th story, 2nd apartment from north at east

    Oct 1, 2013 · Apt 4B

    Closed — Violation closed
Show 5 more ↓
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) 1st door from west at north wall, 1st radiator from north at east wall, west wall, 2nd window frame from east at south wall, 1st window frame from east at south wall in the 4th room from north located at apt 4b, 4th story, 2nd apartment from north at east

    Oct 1, 2013 · Apt 4B

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st closet from north at east wall ceiling, 1st closet from north at east wall door, 1st closet from north at east wall wall, west wall in the private hallway located at apt 4b, 4th story, 2nd apartment from north at east

    Oct 1, 2013 · Apt 4B

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling, west wall in the bathroom located at apt 4b, 4th story, 2nd apartment from north at east

    Oct 1, 2013 · Apt 4B

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling, south wall, east wall in the kitchen located at apt 4b, 4th story, 2nd apartment from north at east

    Oct 1, 2013 · Apt 4B

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling, 1st closet from north at east wall ceiling, 1st closet from north at east wall door, 1st closet from north at east wall wall, west wall in the private hallway located at apt 4b, 4th story, 2nd apartment from north at east

    Oct 1, 2013 · Apt 4B

    Closed — Violation closed

DOB building violations · 11

  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 4, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 22, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 13, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 17, 2012

    Dob violation - resolved
  • Landmark none

    Landmk-landmark none

    Dec 12, 2011

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 26, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 16, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 16, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 1, 2007

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Mar 21, 2003

    Dob violation - dismissed
Show 1 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 1, 1994

    Dob violation - active

ECB violations · 16

  • Class - 2

    Temporary construction equipment on site expired permit. noted:at timeof inspectio pipe scaffold on exp#1 of building with expired permit. permit#140204730 expired on 6/14/16. rem:renew permit.

    Jun 28, 2016 · Penalty $800

    Resolve
  • Class - 1

    Bc3308.4 responsibility & supervision (vertical netting) @ time of inspection noted that the vertical netting attached to the pipe scaffold was severely damaged @ exp1 @ 5th fl level of job it is the responsibi

    Apr 25, 2016 · Penalty $1,600

    Resolve
  • Class - 2

    Sec. 3314.8.2 debris netting not adequate. at time of inspection observed,job site not active. the debris netting attached to the supported pipe scaffold is found loose & not in place at exp#1 & 2. the debris

    Mar 12, 2016

    Resolve
  • Class - 1

    Failure to maintain bldg in code compliant manner. noted: at front of bldg,exp#1,front fire escape drop ladder loading metal landing platform at left side of damaged. remedy: repair &/or replace immediately.

    Sep 18, 2015 · Penalty $1,000

    Resolve
  • Class - 2

    Sec. 3314.4.3.3 failure to provide installation inspection report(supported scaffold). noted: at time of my inspection workers were performing facade work off a supported scaffold. no installation inspection

    Jun 12, 2015 · Penalty $800

    Resolve
  • Class - 2

    Failure to provide sidewalk shed parapet information panel. noted: at time of my inspection no parapet information panel was installed to the sidewalk shed. remedy: comply to code.

    Jun 12, 2015 · Penalty $800

    Resolve
  • Class - 1

    Sec. 3314.8 supported scaffold missing guardrails. all open sides & ends of a scaffold platform shall be provided a guardrail system. noted:at time of my inspection workers were using a supported scaffold that

    Jun 12, 2015 · Penalty $1,600

    Resolve
  • Class - 1

    Sec. 3314.4.5.2 unquilified workers performing work on a supported scaffold. noted: at time of my inspection 3 workers were performing work on a supported scaffold. worker #1(abdur rahim)did not have the requir

    Jun 12, 2015 · Penalty $1,600

    Resolve
  • Class - 1

    Sec. 3314.5.5 supported scaffold w/planks not tied down. noted: at time of inspection not all of the scaffold planks had been tied down completely. when i walked the scaffold deck the opposite side of the plank

    Jun 12, 2015 · Penalty $1,600

    Resolve
  • Class - 2

    Supported scaffold w/expired permit.pswo:issued & posted @main entrance.(stop all scaffold work) noted:@time of my insp a supported scaffoldwas installed and in use @the site.the permit for this scaffold has be

    Jun 12, 2015

    Resolve
Show 6 more ↓
  • Class - 2

    No approved supported scaffold plans on site. noted: at time of my inspection no approved supported scaffold plans could be provided. remedy: comply to code.

    Jun 12, 2015 · Penalty $250

    Resolve
  • Class - 2

    Sec. 28-105.12.2 no approved sidewalk shed plans on site. noted: at time of my inspection no sidewalk shed plans could be provided. remedy: comply to code.

    Jun 12, 2015 · Penalty $250

    Resolve
  • Class - 2

    Failure to safeguard all person and property affected by construction operations.note at time of inspection observed debris netting instal led on pipe scaffold on top of sidewalk shed at exp1 loose,unattached

    May 2, 2015 · Penalty $6,000

    Resolve
  • Class - 2

    Failed to install sign/panel or sws.picture filed.rem:comply with dob code req.

    Jun 17, 2014 · Penalty $800

    Resolve
  • Class - 2

    67x10.68b07.69m07.41t07.16q07.15b11. 67x repair phone system in car 68b provide info in maintenance log 16q seal inoperative drop key hole on all fls 15b relocate cert.of framefor proper access

    Jan 26, 2009 · Penalty $250

    Resolve
  • Non-hazardous

    8v,11q,57o,50h,25b. just floor stops, install incar light guard clean pit, remove noise from machine, adjust door operator for proper closing of car doors.

    May 18, 1999 · Penalty $180

    Resolve

Complaints

  • Heat/hot water

    Apartment only

    Feb 9, 2026 · Apt 4D

    Close
  • Heat/hot water

    Entire building

    Jan 30, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 30, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 30, 2026 · Apt 2B

    Close
  • Heat/hot water

    Entire building

    Jan 29, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 29, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Feb 18, 2025 · Apt 1C

    Close
  • Heat/hot water

    Apartment only

    Nov 13, 2024 · Apt 1C

    Close
  • Heat/hot water

    Entire building

    Oct 9, 2023 · Apt BLDG

    Close
  • Plumbing

    Steam pipe/riser

    Dec 31, 2021 · Apt 2A

    Close
Show 40 more ↓
  • Unsanitary condition

    Mold

    Dec 31, 2021 · Apt 2A

    Close
  • Unsanitary condition

    Pests

    Dec 31, 2021 · Apt 2A

    Close
  • Plumbing

    Steam pipe/riser

    Dec 31, 2021 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Dec 20, 2021 · Apt BLDG

    Close
  • General

    Ventilation system

    Apr 16, 2021 · Apt 5C

    Close
  • Heat/hot water

    Entire building

    Jan 29, 2021 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 24, 2020 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 15, 2020 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 15, 2020 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 15, 2020 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 15, 2020 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 15, 2020 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 25, 2020 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 25, 2020 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 18, 2020 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 18, 2020 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Jun 4, 2020 · Apt 3B

    Close
  • Heat/hot water

    Entire building

    Feb 13, 2020 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 13, 2020 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 13, 2020 · Apt 3C

    Close
  • Heat/hot water

    Entire building

    Dec 19, 2019 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 30, 2019 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 30, 2019 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 28, 2019 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 11, 2019 · Apt 3C

    Close
  • Heat/hot water

    Entire building

    Feb 11, 2019 · Apt BLDG

    Close
  • Electric

    Outlet/switch

    Dec 12, 2018 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Dec 12, 2018 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 12, 2018 · Apt 2B

    Close
  • Heat/hot water

    Entire building

    Nov 16, 2018 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 12, 2017 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 12, 2017 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 12, 2017 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 12, 2017 · Apt 2B

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jul 25, 2017 · Apt 2A

    Close
  • Unsanitary condition

    Pests

    Jul 25, 2017 · Apt 2A

    Close
  • Unsanitary condition

    Pests

    Jul 25, 2017 · Apt 2A

    Close
  • Unsanitary condition

    Pests

    Jul 25, 2017 · Apt 2A

    Close
  • Unsanitary condition

    Pests

    Jul 25, 2017 · Apt 2A

    Close
  • Water leak

    Damp spot

    May 15, 2017 · Apt 2A

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D3)
Year built
1892
Floors
5
Residential units
20
Building area
12,185 ft²
Lot area
3,167 ft²
Zoning
R8B
Community board
107
Council district
6
Block / lot
1198 / 24
Assessed value
$1,055,700
Landmark / historic district
Upper West Side / Central Park West Historic District

HPD registration #115779, last renewed Dec 16, 2025.

Questions about 11a West 84 Street

Who owns 11a West 84 Street?

The owner of record in NYC Department of City Planning PLUTO data is 84 Associates NY LLC.

Does 11a West 84 Street have violations?

Yes. NYC HPD has recorded 15 housing violations at this property.

Is 11a West 84 Street rent stabilized?

NYC Department of Finance tax bills listed 11 rent-stabilized units here in 2024 (about 55% of its 20 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 11a West 84 Street built?

City records list 1892 as the year it was built.

How many apartments are in 11a West 84 Street?

It has 20 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.