130 Ocean Parkway
Brooklyn, NY 11218BBL 3-05328-0021Map
Owner of record: Nextstar Realty, LLC
130 Ocean Parkway is an elevator apartment building built in 2014 in Brooklyn, 11218. It has 26 residential units across 8 floors. The owner of record is Nextstar Realty, LLC. HPD has recorded 21 housing violations here, most recently on August 31, 2026. 6 of the 21 most recent violations are still open. City tax records listed 26 rent-stabilized apartments here in 2024.
- HPD violations
- 21
- DOB violations
- 5
- ECB violations
- 8
- HPD complaints
- 28
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 21
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 6a, 6th story, 1st apartment from south at west
Aug 31, 2026 · Apt 6A
Open — Nov sent out - BHazardous
Properly secure the loose faucet at wash basin in the bathroom located at apt 6a, 6th story, 1st apartment from south at west
Aug 31, 2026 · Apt 6A
Open — Civ14 mailed - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 6a, 6th story, 1st apartment from south at west
Jul 22, 2026 · Apt 6A
Open — Nov sent out - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at .. in the entrance located at apt 6a, 6th story, 1st apartment from south at west
Jul 22, 2026 · Apt 6A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 6a, 6th story, 1st apartment from south at west
Jul 22, 2026 · Apt 6A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 6a, 6th story, 1st apartment from south at west
Jul 22, 2026 · Apt 6A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door leading to laundry room at cellar
Jul 22, 2026
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at south ans west wall at bycyle storage room at cellar
Jul 22, 2026
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at south wall and west wall at cellar
Jul 22, 2026
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall and west wall at cellar
Jul 22, 2026
Closed — Violation closed
Show 11 more ↓
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at 1st public hall stairs from north at east, 6th story
Jul 16, 2026
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall
Jul 16, 2026
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and west wall at public hall
Jul 16, 2026
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 6a, 6th story, 1st apartment from south at west
Mar 22, 2026 · Apt 6A
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 6a, 6th story, 1st apartment from south at west
Mar 22, 2026 · Apt 6A
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 6a, 6th story, 1st apartment from south at west
Mar 22, 2026 · Apt 6A
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Mar 22, 2026
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Mar 22, 2026
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
Mar 22, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 5b, 5th story, 2nd apartment from east at south
Jan 23, 2022 · Apt 5B
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at roof at boiler room
Jan 23, 2022
Closed — Violation dismissed
DOB building violations · 5
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 15, 2020
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - dismissed
ECB violations · 8
- Class - 2
Emergency outside comm is inoperative , repair
Feb 15, 2022 · Penalty $310
Resolve - Class - 1
No guardrails/inadequate guardrails.noted:7th fl terrace has inadequate guardrail (approx 20" in height)-as per code guardrail height 42" for top rail.door is not locked leading to terrace there is nothing to p
Feb 18, 2015 · Penalty $1,200
Resolve - Class - 1
Design required by the chapter 33 noted:const site chute erected @exp#3(over 40' in height)from ground to 6th fl.no design drawing available for makeshift chute (constructed out of 1/2 plywood & 2 x 4s.pswo is
Feb 18, 2015 · Penalty $1,600
Resolve - Class - 1
Bc 3301.7 design required by the chapter 33.noted: pipe scaffold erected (over 40'in height) up to 7th floor at exp 1 and 3.no design drawing for scaffold available uon request.permit #320970516-eq-sf. pswo iss
Feb 18, 2015 · Penalty $1,600
Resolve - Class - 1
Failure to safeguard all persons & property affected by const ops.noted:workers on balconies(fls 3,4,5) @exp#1 no guardrails installed or harnesses worn to protect workers from falling.all doors to balconies(fr
Feb 18, 2015 · Penalty $2,400
Resolve - Class - 2
Color of fence.note:@ the time of my insp.i observed contruction fence erected @ exp.one approx.50'in lenght fronting a public thorough farepermit for fence issued on 07/12/13 & renew on 06/17/14.contractor fai
Aug 2, 2014 · Penalty $400
Resolve - Class - 2
Failure to provide project info.panel.note:@ the time of insp,i observed that contractor fail to post project info panel @ exp.one the perimeter that was fronting a public thoroughfare,to indicate rendering of
Aug 2, 2014 · Penalty $400
Resolve - Class - 2
Sec. bc 3303.2.4. failure to provide sanitary facilities at demo site.at the time of my inspection approx 6 workers on site demolishing 2 sty bldg demo down to 1st flr. i observed no sanitary facilities was
Oct 23, 2012
Resolve
Complaints
- Plumbing
Basin/sink
Aug 18, 2026 · Apt 6A
Close - Door/window
Door
Aug 18, 2026 · Apt 6A
Close - Appliance
Refrigerator
Aug 18, 2026 · Apt 6A
Close - Unsanitary condition
Mold
Aug 18, 2026 · Apt 6A
Close - Door/window
Door
Aug 18, 2026 · Apt 6A
Close - Unsanitary condition
Mold
Aug 18, 2026 · Apt 6A
Close - Heat/hot water
Entire building
Jul 15, 2026 · Apt 6A
Close - Unsanitary condition
Mold
Jul 15, 2026 · Apt 6A
Close - Plumbing
Basin/sink
Jul 15, 2026 · Apt 6A
Close - Paint/plaster
Ceiling
Jul 15, 2026 · Apt 6A
Close
Show 18 more ↓
- Unsanitary condition
Mold
Jul 15, 2026 · Apt 6A
Close - Water leak
Slow leak
Jul 15, 2026 · Apt 6A
Close - Electric
Power outage
Jul 14, 2026 · Apt BUILDI
Close - Electric
Power outage
Jul 8, 2026 · Apt BUILDI
Close - Heat/hot water
Apartment only
Jul 4, 2026 · Apt 6A
Close - Heat/hot water
Apartment only
Apr 9, 2026 · Apt 2B
Close - Heat/hot water
Apartment only
Apr 7, 2026 · Apt 6A
Close - Heat/hot water
Apartment only
Apr 4, 2026 · Apt 6A
Close - Heat/hot water
Entire building
Apr 2, 2026 · Apt 6A
Close - Heat/hot water
Apartment only
Mar 24, 2026 · Apt 6A
Close - Heat/hot water
Entire building
Mar 22, 2026 · Apt 6A
Close - General
Cooking gas
Mar 19, 2026 · Apt 6A
Close - Door/window
Door frame
Mar 19, 2026 · Apt 6A
Close - Heat/hot water
Entire building
Mar 19, 2026 · Apt 6A
Close - Heat/hot water
Apartment only
Dec 4, 2025 · Apt 6B
Close - Heat/hot water
Apartment only
Jan 11, 2025 · Apt 3B
Close - Heat/hot water
Apartment only
Feb 16, 2023 · Apt 5C
Close - Heat/hot water
Apartment only
Jan 17, 2022 · Apt 5B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 2014
- Floors
- 8
- Residential units
- 26
- Building area
- 23,307 ft²
- Lot area
- 6,000 ft²
- Zoning
- R7A
- Community board
- 312
- Council district
- 39
- Block / lot
- 5328 / 21
- Assessed value
- $2,055,600
- Landmark / historic district
- No
HPD registration #386028, last renewed Jul 28, 2026.
Questions about 130 Ocean Parkway
Who owns 130 Ocean Parkway?
The owner of record in NYC Department of City Planning PLUTO data is Nextstar Realty, LLC.
Does 130 Ocean Parkway have violations?
Yes. NYC HPD has recorded 21 housing violations at this property.
Is 130 Ocean Parkway rent stabilized?
NYC Department of Finance tax bills listed 26 rent-stabilized units here in 2024 (about 100% of its 26 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 130 Ocean Parkway built?
City records list 2014 as the year it was built.
How many apartments are in 130 Ocean Parkway?
It has 26 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.