roofy

238 Classon Avenue

Brooklyn, NY 11205BBL 3-01923-0001Map

Owner of record: Pratt Institute

238 Classon Avenue is a school building built in 1986 in Brooklyn, 11205. It has 53 residential units across 2 floors. The owner of record is Pratt Institute. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
28
ECB violations
33
HPD complaints
22

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. The newest 10 per agency here; the full lists are a click away.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 28

  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 30, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 30, 2020

    Dob violation - resolved
See all 28 DOB violations (10 shown here)

ECB violations · 33

  • Class - 2

    Found fitzgibbons oil fired boilers active with defects at time of inspection. boiler refactory defective in chamber and chamber doors. correct all violating condition and submit a certificate of correction.

    Aug 14, 2024

    Resolve
  • Class - 3

    Corridor wall next to rm 303 has spalling plaster. remedy: repair wall.

    Apr 18, 2012

    Resolve
  • Class - 1

    Reissue #34919575x grates above area way from boiler room have excessive corrosion,grate supports are corroded through at several points leaving bolts supporting angle bracket detached. remedy: remove & replace

    Apr 18, 2012

    Resolve
  • Class - 2

    Reissue #34919574y. cmu walls in gym have vertical and step cracks at various locations. remedy: repair cracks.

    Apr 18, 2012

    Resolve
  • Class - 2

    Foundation wall in area way under (grates) at boiler room is cracked &spalling w/missing concrete in several areas exposing reinforcing steel. remedy: repair concrete wall.

    Apr 18, 2012

    Resolve
  • Class - 2

    Sec. 27-371(b). plexi vision panels installed on door to rooms 123 and215. remedy: install required glass panels.

    Apr 18, 2012

    Resolve
  • Class - 2

    Defective area grates @ cellar boiler room access to areaway,steel grate supports are rusted through @ several areas along the bldg side.rem:repair if feasible or replace

    Jul 5, 2011

    Resolve
  • Class - 2

    Defective cmu block @ gym,vertical cracks in cmu blockwall @ north,south & west walls.rem:repair masonry cmu block walls.

    Jul 5, 2011

    Resolve
  • Class - 3

    Reissue: 34692535h exterior foundation wall has become porous allowingwater to enter bldg in boiler room adj fdny box at cellar level. remedy: water proof the foundation wall.

    Mar 19, 2009

    Resolve
  • Class - 3

    Reissue 34569494r exterior foundation wall has become porous and allowing rain water to enter the building in the boiler room adjacent to the fdny box at cellar level. remedy: water proof foundation wall.

    Jul 15, 2008

    Resolve
See all 33 ECB violations (10 shown here)

Complaints

  • General

    Cabinet

    Jan 18, 2023 · Apt 528

    Close
  • Flooring/stairs

    Floor

    Jan 18, 2023 · Apt 528

    Close
  • Plumbing

    Toilet

    Jan 18, 2023 · Apt 528

    Close
  • Unsanitary condition

    Pests

    Jan 18, 2023 · Apt 528

    Close
  • General

    Mailbox

    Jun 27, 2017 · Apt 513

    Close
  • Plumbing

    Boiler

    Feb 24, 2016 · Apt 406

    Close
  • Heat/hot water

    Apartment only

    Dec 30, 2015 · Apt 4

    Close
  • Flooring/stairs

    Floor

    Dec 9, 2015 · Apt 215

    Close
  • Door/window

    Door

    Dec 9, 2015 · Apt 215

    Close
  • Electric

    No lighting

    Dec 9, 2015 · Apt 215

    Close
See all 22 HPD complaints (10 shown here)

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
School building (W6)
Year built
1986
Floors
2
Residential units
53
Building area
93,859 ft²
Lot area
162,500 ft²
Zoning
R7-1
Community board
302
Council district
35
Block / lot
1923 / 1
Assessed value
$18,567,000
Landmark / historic district
No

Questions about 238 Classon Avenue

Who owns 238 Classon Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Pratt Institute.

Does 238 Classon Avenue have violations?

NYC HPD has no housing violations on record for this property.

Is 238 Classon Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 238 Classon Avenue built?

City records list 1986 as the year it was built.

How many apartments are in 238 Classon Avenue?

It has 53 residential units and 54 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.