283 Classon Avenue
Brooklyn, NY 11205BBL 3-01924-0008Map
Owner of record: Block 1924/Classon Holding Corp.
283 Classon Avenue is a walk-up apartment building built in 1915 in Brooklyn, 11205. It has 12 residential units across 4 floors. The owner of record is Block 1924/Classon Holding Corp.. HPD has recorded 74 housing violations here, most recently on July 21, 2026. 39 of the 50 most recent violations are still open.
- HPD violations
- 74
- DOB violations
- 13
- ECB violations
- 1
- HPD complaints
- 93
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 74
- BHazardous
Repair the roof so that it will not leak at ceiling in the 1st room from north located at apt 3b, 3rd story, 1st apartment from north at east
Jul 21, 2026 · Apt 3B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color st ceiling in the 1st room from north located at apt 3b, 3rd story, 1st apartment from north at east
Jul 21, 2026 · Apt 3B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at door from street to vestibule at public hall, 1st story
Jul 21, 2026
Open — Invalid certification - BHazardous
Properly repair or replace the broken or defective latch and its assembily at door from street to vestibule at public hall, 1st story
Jul 21, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door from vestibule to public hall at public hall, 1st story
Jul 21, 2026
Open — Invalid certification - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing frame at public hall, 1st story
Jul 21, 2026
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at outlet at east wall in the 1st room from north located at apt 3b, 3rd story, 1st apartment from north at east
Jul 21, 2026 · Apt 3B
Closed — Violation dismissed - BHazardous
Replace with new the missing electrical outlet cover at public hall, 2nd story
Jul 21, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 4, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 9, 2024
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Properly repair or replace the broken or defective counter balance at upper and lower sash window from east at south in the bathroom located at apt 1b, 1st story, 1st apartment from north at east
Feb 24, 2024 · Apt 1B
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective counter balance at upper and lower sash window from north at east wall in the 1st room from east at north located at apt 1b, 1st story, 1st apartment from north at east
Feb 24, 2024 · Apt 1B
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at entrance in the entrance located at apt 1b, 1st story, 1st apartment from north at east
Feb 1, 2024 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east
Feb 1, 2024 · Apt 1B
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east
Feb 1, 2024 · Apt 1B
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jul 13, 2017
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jul 13, 2017
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .. at public hall, 1st story
Jul 13, 2017
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Jul 13, 2017
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jul 13, 2017
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system ''' at public hall, 1st story
Jul 13, 2017
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jul 13, 2017
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at ... at public hall, 1st story
Jul 13, 2017
Open — Nov sent out - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts incandescent or equivalent.
Jul 13, 2017
Open — Nov sent out - BHazardous
Properly repair the broken or defective door knob at door in the entrance located at apt 1a, 1st story, 1st apartment from west at north
Jul 5, 2016 · Apt 1A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Jul 5, 2016 · Apt 1A
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of metal encasement obstructing drop ladder at bldg front
Jul 5, 2016
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 4c, 4th story, 1st apartment from east at south
Feb 7, 2014 · Apt 4C
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
Feb 7, 2014
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 4c, 4th story, 1st apartment from east at south
Jan 31, 2014 · Apt 4C
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock at entrance door to building , 1st story
Jan 31, 2014
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at ceiling in the 1st room from north at west located at apt 3b, 3rd story, 1st apartment from west at north
Apr 23, 2009 · Apt 3B
Open — Nov sent out - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate ..... in the entire apartment located at apt 3b, 3rd story, 1st apartment from west at north
Apr 23, 2009 · Apt 3B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective at wood floor in the 1st room from north at west located at apt 3b, 3rd story, 1st apartment from west at north
Apr 23, 2009 · Apt 3B
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at west located at apt 3b, 3rd story
Apr 23, 2009 · Apt 3B
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of concealed water leaks at ceiling in the 1st room from north at west located at apt 3b, 3rd story, 1st apartment from west at north
Apr 23, 2009 · Apt 3B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective erroded brick mortar joints at 3rd and 4th story north exterior wall
Apr 23, 2009
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3b, 3rd story, apartment at east
Apr 1, 2009 · Apt 3B
Open — Nov sent out - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate .. in the entire apartment located at apt 3b, 3rd story, apartment at east
Apr 1, 2009 · Apt 3B
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cyilinder key operated lock at entrance to building , 1st story
Mar 10, 2009
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... ceiling and walls in the bathroom located at apt 2b, 2nd story, 1st apartment from north at east
Dec 10, 2008 · Apt 2B
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of exposed electrical wires at ceiling in the foyer located at apt 2b, 2nd story, 1st apartment from north at east
Dec 10, 2008 · Apt 2B
Open — Nov sent out - ANon-hazardous
Properly repair the broken or defective intercommunication system in the entire apartment located at apt 2b, 2nd story, 1st apartment from north at east
Dec 10, 2008 · Apt 2B
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock installed at the front entrance door to building
Dec 10, 2008
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of evidence of concealed water leak at ceiling in the 1st room from east at north located at apt 3b, 3rd story, apartment at east
Aug 14, 2006 · Apt 3B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective brickwork at east facade, directly above window , 3rd story
Aug 14, 2006
Open — Nov sent out - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate , in the 1st room from east at south located at apt 3b, 3rd story, apartment at east
Aug 14, 2006 · Apt 3B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective brick and mortar at east facade, directly above window , 3rd story
Aug 14, 2006
Open — Nov sent out - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing treads, 2nd and 3rd story fire escape at building rear
Aug 14, 2006
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east
Nov 17, 2004 · Apt 1B
Open — First no access to re- inspect violation
DOB building violations · 13
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed
Show 3 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 1
- Class - 2
36)boiler is not registered. register boiler correct all listed violation list. submit certificate of correction.
Oct 11, 2017 · Penalty $500
Active
Complaints
- Water leak
Slow leak
Jul 18, 2026 · Apt 3B
Close - General
Bell/buzzer/intercom
Jul 18, 2026 · Apt 3B
Close - Electric
Outlet/switch
Jul 18, 2026 · Apt 3B
Close - Unsanitary condition
Mold
Sep 30, 2025 · Apt 1B
Close - Plumbing
Bathtub/shower
Nov 25, 2024 · Apt 4C
Close - Door/window
Window frame
Feb 1, 2024 · Apt 1B
Close - Door/window
Window frame
Feb 1, 2024 · Apt 1B
Close - Heat/hot water
Apartment only
Feb 1, 2024 · Apt 1B
Close - Unsanitary condition
Mold
Apr 23, 2023 · Apt 1B
Close - Water leak
Heavy flow
Apr 23, 2023 · Apt 1B
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Nov 5, 2021 · Apt 2A
Close - Unsanitary condition
Garbage/recycling storage
Jul 9, 2017 · Apt 1C
Close - Paint/plaster
Ceiling
Jul 4, 2016 · Apt 1A
Close - Plumbing
Radiator
Apr 1, 2016 · Apt 1A
Close - Heat/hot water
Entire building
Mar 11, 2016 · Apt 1A
Close - Heating
Heat related
Feb 28, 2014 · Apt 3C
Close - Heating
Heat related
Feb 6, 2014 · Apt 4C
Close - Heating
Heat related
Jan 28, 2014 · Apt 4C
Close - Heating
Heat related
Jan 1, 2014 · Apt 2B
Close - Heating
Heat related
Dec 8, 2013 · Apt 3C
Close - Heating
Heat related
Jan 5, 2013 · Apt 4A
Close - Heating
Heat related
Jan 5, 2013 · Apt 2C
Close - Heating
Heat related
Jan 4, 2012 · Apt BLDG
Close - Heating
Heat related
Nov 26, 2010 · Apt 1A
Close - Construction
Roof
May 27, 2010 · Apt 4A
Close - Nonconst
Vermin
May 27, 2010 · Apt 4A
Close - Heating
Heat related
Jan 30, 2010 · Apt BLDG
Close - Heating
Heat related
Jan 11, 2010 · Apt 2B
Close - Heating
Heat related
Jan 10, 2010 · Apt BLDG
Close - Heating
Heat related
Jan 10, 2010 · Apt 2A
Close - Heating
Heat related
Oct 17, 2009 · Apt 2B
Close - General
Floor
Apr 20, 2009 · Apt 3B
Close - Paint/plaster
Ceiling
Apr 20, 2009 · Apt 3B
Close - Plumbing
Water-leaks
Apr 20, 2009 · Apt 3B
Close - General
Windows
Apr 20, 2009 · Apt 3B
Close - Heating
Heat related
Mar 4, 2009 · Apt BLDG
Close - Heating
Heat related
Jan 15, 2009 · Apt 3B
Close - Plumbing
Water-leaks
Jan 15, 2009 · Apt 3B
Close - Paint/plaster
Ceiling
Jan 11, 2009 · Apt 3B
Close - Heating
Heat related
Jan 11, 2009 · Apt 3B
Close - Heating
Heat related
Jan 7, 2009 · Apt 3B
Close - Heating
Heat related
Jan 1, 2009 · Apt 3B
Close - Heating
Heat related
Nov 25, 2008 · Apt 3B
Close - Heating
Heat related
Nov 23, 2008 · Apt 3B
Close - General
Doors
Nov 23, 2008 · Apt 3B
Close - Plumbing
Bathtub/shower
Nov 23, 2008 · Apt 3B
Close - Plumbing
Basin/sink
Nov 23, 2008 · Apt 3B
Close - General
Windows
Nov 23, 2008 · Apt 3B
Close - Plumbing
Water-leaks
Nov 23, 2008 · Apt 3B
Close - Heating
Heat related
Nov 22, 2008 · Apt 3B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C6)
- Year built
- 1915
- Floors
- 4
- Residential units
- 12
- Building area
- 8,417 ft²
- Lot area
- 1,914 ft²
- Zoning
- R7A
- Community board
- 303
- Council district
- 33
- Block / lot
- 1924 / 8
- Assessed value
- $616,950
- Landmark / historic district
- No
HPD registration #327827, last renewed Jun 11, 2026.
Questions about 283 Classon Avenue
Who owns 283 Classon Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Block 1924/Classon Holding Corp..
Does 283 Classon Avenue have violations?
Yes. NYC HPD has recorded 74 housing violations at this property.
Is 283 Classon Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 283 Classon Avenue built?
City records list 1915 as the year it was built.
How many apartments are in 283 Classon Avenue?
It has 12 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.