277 Classon Avenue
Brooklyn, NY 11205BBL 3-01924-0011Map
Owner of record: 277 Classon LLC
277 Classon Avenue is a walk-up apartment building built in 1940 in Brooklyn, 11205. It has 8 residential units across 4 floors. The owner of record is 277 Classon LLC. HPD has recorded 10 housing violations here, most recently on February 23, 2022.
- HPD violations
- 10
- DOB violations
- 11
- ECB violations
- 2
- HPD complaints
- 210
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 10
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 23, 2022
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household items at public hall, 1st story
Jan 27, 2021
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the floor at public hall, 1st story
Jan 27, 2021
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the floor at vestibule at public hall, 1st story
Jan 27, 2021
Closed — Violation dismissed - CImmediately hazardous
Properly repair the broken or defective apartment door lock and assembly in the entrance located at apt 1l, 1st story, 1st apartment from west at north
Jul 25, 2009 · Apt 1L
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall, 1st window frame from south at west wall, 2nd window frame from south at west wall in the 6th room from east located at apt 2l, 2nd story, 1st apartment from west at north
Jun 4, 2009 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the 5th room from east located at apt 3r, 3rd story, 1st apartment from east at south
Nov 6, 2008 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the 6th room from east located at apt 2l, 2nd story, 1st apartment from west at north
Oct 6, 2008 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 2l, 2nd story, 1st apartment from west at north
Oct 6, 2008 · Apt 2L
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective intercommunication system, located at apt 3r, 3rd story, 2nd apartment from north at east
Oct 23, 2007 · Apt 3R
Closed — Violation closed
DOB building violations · 11
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Construction other optional
C-construction other optional
Jun 30, 2010
Vw*-violation - work w/o permit dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed
Show 1 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active
ECB violations · 2
- Class - 2
As per class 2 (b265) 28-303.7 failure to file a complete boiler inspection report as per dob records. submit a current b09 report.
Jun 13, 2017
Resolve - Non-hazardous
36.
Nov 19, 1998 · Penalty $400
Resolve
Complaints
- Unsanitary condition
Mold
Jan 12, 2021 · Apt 1F
Close - Unsanitary condition
Pests
Jan 12, 2021 · Apt 1F
Close - Unsanitary condition
Garbage/recycling storage
Jan 12, 2021 · Apt BLDG
Close - Heating
Heat related
Jan 10, 2010 · Apt 1R
Close - Heating
Heat related
Oct 18, 2009 · Apt 1R
Close - Nonconst
Vermin
Sep 29, 2009 · Apt 1R
Close - Paint/plaster
Wall
Sep 29, 2009 · Apt 1R
Close - Plumbing
Water-leaks
Sep 29, 2009 · Apt 1R
Close - Paint/plaster
Ceiling
Sep 29, 2009 · Apt 1R
Close - Paint/plaster
Wall
Sep 29, 2009 · Apt 1R
Close
Show 40 more ↓
- General
Windows
Sep 29, 2009 · Apt 1R
Close - Electric
Lighting
Sep 29, 2009 · Apt 1R
Close - Paint/plaster
Wall
Sep 29, 2009 · Apt 1R
Close - Paint/plaster
Wall
Sep 29, 2009 · Apt 1R
Close - Paint/plaster
Ceiling
Sep 29, 2009 · Apt 1R
Close - Paint/plaster
Ceiling
Jul 17, 2009 · Apt 1L
Close - Paint/plaster
Ceiling
Jul 17, 2009 · Apt 1L
Close - Paint/plaster
Ceiling
Jul 17, 2009 · Apt 1L
Close - Plumbing
Toilet
Jul 17, 2009 · Apt 1L
Close - General
Doors
Jul 17, 2009 · Apt 1L
Close - General
Floor
Jul 17, 2009 · Apt 1L
Close - General
Cabinet
Jul 17, 2009 · Apt 1L
Close - Plumbing
Basin/sink
Jul 17, 2009 · Apt 1L
Close - Paint/plaster
Ceiling
Jul 17, 2009 · Apt 1L
Close - Plumbing
Radiator
Jun 23, 2009 · Apt 2L
Close - General
Floor
Jun 23, 2009 · Apt 2L
Close - Plumbing
Basin/sink
Jun 23, 2009 · Apt 2L
Close - General
Cabinet
Jun 23, 2009 · Apt 2L
Close - General
Cabinet
Jun 23, 2009 · Apt 2L
Close - Nonconst
Vermin
Jun 23, 2009 · Apt 2L
Close - General
Doors
Jun 23, 2009 · Apt 2L
Close - Electric
Lighting
Jun 23, 2009 · Apt 2L
Close - General
Windows
Jun 23, 2009 · Apt 2L
Close - General
Windows
Jun 23, 2009 · Apt 2L
Close - General
Windows
Jun 23, 2009 · Apt 2L
Close - General
Floor
Jun 23, 2009 · Apt 2L
Close - Paint/plaster
Ceiling
Jun 23, 2009 · Apt 2L
Close - Paint/plaster
Wall
Jun 23, 2009 · Apt 2L
Close - Paint/plaster
Wall
Jun 11, 2009 · Apt 2L
Close - Plumbing
Basin/sink
Jun 11, 2009 · Apt 2L
Close - Plumbing
Water-leaks
Jun 11, 2009 · Apt 2L
Close - General
Windows
Jun 11, 2009 · Apt 2L
Close - Paint/plaster
Window/frame
Jun 11, 2009 · Apt 2L
Close - Nonconst
Smoke detector
Jun 11, 2009 · Apt 2L
Close - Paint/plaster
Wall
Jun 11, 2009 · Apt 2L
Close - Plumbing
Water-leaks
Jun 11, 2009 · Apt 2L
Close - Appliance
Electric/gas range
Jun 11, 2009 · Apt 2L
Close - Nonconst
Carbon monoxide
Jun 11, 2009 · Apt 2L
Close - Electric
Lighting
May 31, 2009 · Apt 2L
Close - Electric
Lighting
May 31, 2009 · Apt 2L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1940
- Floors
- 4
- Residential units
- 8
- Building area
- 6,264 ft²
- Lot area
- 2,094 ft²
- Zoning
- R7A
- Community board
- 303
- Council district
- 33
- Block / lot
- 1924 / 11
- Assessed value
- $769,950
- Landmark / historic district
- No
HPD registration #309311, last renewed Jul 29, 2026.
Questions about 277 Classon Avenue
Who owns 277 Classon Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 277 Classon LLC.
Does 277 Classon Avenue have violations?
Yes. NYC HPD has recorded 10 housing violations at this property.
Is 277 Classon Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 277 Classon Avenue built?
City records list 1940 as the year it was built.
How many apartments are in 277 Classon Avenue?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.