46 Sherman Avenue
Manhattan, NY 10040BBL 1-02175-0088Map
Owner of record: Jp 65 Arden LLC
46 Sherman Avenue is a walk-up apartment building built in 1927 in Manhattan, 10040. It has 27 residential units across 5 floors. The owner of record is Jp 65 Arden LLC. HPD has recorded 291 housing violations here, most recently on September 17, 2025. 25 of the 50 most recent violations are still open. City tax records listed 22 rent-stabilized apartments here in 2024.
- HPD violations
- 291
- DOB violations
- 0
- ECB violations
- 3
- HPD complaints
- 210
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 291
- BHazardous
M/d law abate the nuisance consisting of lockable door knob at entrance to fire escape in the 1st room from east located at apt 5b, 5th story, 2nd apartment from east at south
Sep 17, 2025 · Apt 5B
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2b, 2nd story
Sep 17, 2025 · Apt 2B
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2b, 2nd story
Sep 17, 2025 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation metal riser pipe in the bathroom located at apt 4d, 4th story, 1st apartment from west at north
Aug 27, 2025 · Apt 4D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective caulking around at bathtub in the bathroom located at apt 4d, 4th story, 1st apartment from west at north
Aug 27, 2025 · Apt 4D
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 5b, 5th story, 2nd apartment from east at south
Aug 27, 2025 · Apt 5B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective caulking around the bathtub in the bathroom located at apt 2b, 2nd story, 2nd apartment from east at south
Aug 27, 2025 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2a, 2nd story, 1st apartment from east at south
Aug 27, 2025 · Apt 2A
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective base cabinet doors at west wall in the kitchen located at apt 5a, 5th story, 1st apartment from east at south
Aug 14, 2025 · Apt 5A
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 5a, 5th story, 1st apartment from east at south
Aug 14, 2025 · Apt 5A
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 5a, 5th story, 1st apartment from east at south
Aug 14, 2025 · Apt 5A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5a, 5th story, 1st apartment from east at south
Aug 14, 2025 · Apt 5A
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 5a, 5th story, 1st apartment from east at south
Aug 14, 2025 · Apt 5A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 5a, 5th story, 1st apartment from east at south
Aug 14, 2025 · Apt 5A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the 4th room from east located at apt 5a, 5th story, 1st apartment from east at south
Aug 14, 2025 · Apt 5A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 3rd room from east located at apt 5a, 5th story, 1st apartment from east at south
Aug 14, 2025 · Apt 5A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 2nd room from east located at apt 5a, 5th story, 1st apartment from east at south
Aug 14, 2025 · Apt 5A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles at bathtub area at east wall in the bathroom located at apt 5a, 5th story, 1st apartment from east at south
Aug 14, 2025 · Apt 5A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt 4e, 4th story, 2nd apartment from west at north
Jul 6, 2025 · Apt 4E
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 4e, 4th story, 2nd apartment from west at north
Jul 6, 2025 · Apt 4E
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 4e, 4th story, 2nd apartment from west at north
Jul 6, 2025 · Apt 4E
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective window, 1-st from west at north, upper sash counter balances in the 3rd room from east located at apt 4e, 4th story, 2nd apartment from west at north
Jul 6, 2025 · Apt 4E
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective window, 1-st from west at north, upper sash counter balances in the 1st room from east located at apt 4e, 4th story, 2nd apartment from west at north
Jul 6, 2025 · Apt 4E
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0, wg to replace = 0, wg to repair = 2 in the entire apartment located at apt 4e, 4th story, 2nd apartment from west at north
Jul 6, 2025 · Apt 4E
Open — Violation will be reinspected - BHazardous
Properly repair or replace the broken or defective base cabinet at sink in the kitchen located at apt 4e, 4th story, 2nd apartment from west at north
Jul 6, 2025 · Apt 4E
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4e, 4th story, 2nd apartment from west at north
Jul 6, 2025 · Apt 4E
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4e, 4th story, 2nd apartment from west at north
Jul 6, 2025 · Apt 4E
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) west wall in the foyer located at apt 4e, 4th story, 2nd apartment from west at north
Jul 6, 2025 · Apt 4E
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall, 1st door frame from east at south wall in the foyer located at apt 4e, 4th story, 2nd apartment from west at north
Jul 6, 2025 · Apt 4E
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 3rd room from east located at apt 4e, 4th story, 2nd apartment from west at north
Jul 6, 2025 · Apt 4E
Open — Defect letter issued - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from west at north wall wall in the 2nd private hallway from east located at apt 5b, 5th story, 2nd apartment from east at south
Jun 17, 2025 · Apt 5B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from east at south wall, south wall, 2nd window frame from east at south wall, west wall, 1st window frame from south at west wall, north wall in the 3rd room from east at south located at apt 5b, 5th story, 2nd apartment from east at south
Jun 17, 2025 · Apt 5B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall, ceiling in the 1st room from east located at apt 5b, 5th story, 2nd apartment from east at south
Jun 17, 2025 · Apt 5B
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 5b, 5th story, 2nd apartment from east at south
Jun 17, 2025 · Apt 5B
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, south wall, west wall in the kitchen located at apt 5b, 5th story, 2nd apartment from east at south
Jun 17, 2025 · Apt 5B
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 3rd room from east at south located at apt 5b, 5th story, 2nd apartment from east at south
Jun 17, 2025 · Apt 5B
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, north wall, south wall, west wall, 1st window frame from east at south wall, 2nd window frame from east at south wall in the 1st room from east located at apt 5b, 5th story, 2nd apartment from east at south
Jun 17, 2025 · Apt 5B
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door, 1st closet from south at west wall door frame, 1st door frame from west at north wall, 1st door frame from east at south wall in the foyer located at apt 5b, 5th story, 2nd apartment from east at south
Jun 17, 2025 · Apt 5B
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door, 1st closet from west at north wall door frame in the 2nd private hallway from east located at apt 5b, 5th story, 2nd apartment from east at south
Jun 17, 2025 · Apt 5B
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 2nd room from east located at apt 5b, 5th story, 2nd apartment from east at south
Jun 17, 2025 · Apt 5B
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door, 1st closet from north at east wall door frame, 2nd closet from north at east wall door, 2nd closet from north at east wall door frame in the 1st private hallway from east located at apt 5b, 5th story, 2nd apartment from east at south
Jun 17, 2025 · Apt 5B
Open — Defect letter issued - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall, east wall, ceiling, south wall in the foyer located at apt 5b, 5th story, 2nd apartment from east at south
Jun 17, 2025 · Apt 5B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall, 1st window frame from south at west wall, east wall in the kitchen located at apt 5b, 5th story, 2nd apartment from east at south
Jun 17, 2025 · Apt 5B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 2nd window frame from east at south wall, 1st window frame from east at south wall, south wall, east wall, west wall, north wall in the 2nd room from east located at apt 5b, 5th story, 2nd apartment from east at south
Jun 17, 2025 · Apt 5B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from north at east wall wall, 2nd closet from north at east wall wall in the 1st private hallway from east located at apt 5b, 5th story, 2nd apartment from east at south
Jun 17, 2025 · Apt 5B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt 5b, 5th story, 2nd apartment from east at south
Jun 17, 2025 · Apt 5B
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at the ceiling in the 1st room from east located at apt 5b, 5th story, 2nd apartment from east at south
Jun 17, 2025 · Apt 5B
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 4, 2025
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 1st room from east located at apt 5b, 5th story, 2nd apartment from east at south
May 8, 2025 · Apt 5B
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door, 1st closet from south at west wall door frame, 1st door from east at south wall in the foyer located at apt 5b, 5th story, 2nd apartment from east at south
May 8, 2025 · Apt 5B
Open — Defect letter issued
DOB building violations · 0
No DOB violations on record
ECB violations · 3
- Non-hazardous
Plumbing work w/o a permit-hazardous. on inspection day 10/10/07 in the basement gas meter for apartment # 5b was disconnected and pressure gauge was installed for testing new installed gas riser from basement
Oct 10, 2007 · Penalty $800
Active - Hazardous
Plumbing work without a permit.remedy;obtain a permit. if feisible or restore to prior legal condition.location;apt.3f,that bathtub,basin & watercloset have been removed.drain in kitchen have been removed
Aug 8, 2002 · Penalty $800
Resolve - Non-hazardous
Failure to maintaiin exterior building wall defect is cracked & bulding bricks at 5th floor south east corner of bldg remedy repair defect
Apr 23, 1996 · Penalty $350
Resolve
Complaints
- Unsanitary condition
Pests
Jul 17, 2026 · Apt 5A
Open - Unsanitary condition
Pests
Jul 17, 2026 · Apt 5A
Open - General
Signage missing
Feb 3, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Oct 10, 2025 · Apt 4D
Close - Paint/plaster
Ceiling
Aug 12, 2025 · Apt 5A
Close - Paint/plaster
Wall
Aug 12, 2025 · Apt 5A
Close - Paint/plaster
Wall
Aug 12, 2025 · Apt 5A
Close - Unsanitary condition
Mold
Aug 12, 2025 · Apt 5A
Close - Door/window
Door
Jun 25, 2025 · Apt 4E
Close - Unsanitary condition
Pests
Jun 25, 2025 · Apt 4E
Close
Show 40 more ↓
- General
Cabinet
Jun 25, 2025 · Apt 4E
Close - Door/window
Window frame
Jun 25, 2025 · Apt 4E
Close - Flooring/stairs
Floor
Jun 25, 2025 · Apt 4E
Close - Safety
Window guard broken/missing
Jun 25, 2025 · Apt 4E
Close - Electric
Outlet/switch
Jun 25, 2025 · Apt 4E
Close - Paint/plaster
Wall
Jun 12, 2025 · Apt 5B
Close - Flooring/stairs
Floor
Jun 12, 2025 · Apt 5B
Close - Plumbing
Basin/sink
Jun 12, 2025 · Apt 5B
Close - Water leak
Damp spot
Jun 12, 2025 · Apt 5B
Close - Unsanitary condition
Mold
Jun 12, 2025 · Apt 5B
Close - Door/window
Door
Mar 27, 2025 · Apt PA
Close - Water leak
Slow leak
Mar 27, 2025 · Apt PA
Close - Flooring/stairs
Stairs
Mar 27, 2025 · Apt PA
Close - Paint/plaster
Wall
Mar 27, 2025 · Apt PA
Close - Paint/plaster
Wall
Mar 27, 2025 · Apt PA
Close - Outside building
Roof door/hatch
Mar 27, 2025 · Apt PA
Close - Paint/plaster
Ceiling
Mar 27, 2025 · Apt PA
Close - Door/window
Door
Mar 20, 2025 · Apt BLDNG
Close - Plumbing
Steam pipe/riser
Mar 20, 2025 · Apt BLDNG
Close - Flooring/stairs
Stairs
Mar 20, 2025 · Apt BLDNG
Close - Paint/plaster
Wall
Mar 20, 2025 · Apt BLDNG
Close - Outside building
Roof door/hatch
Mar 20, 2025 · Apt BLDNG
Close - Outside building
Skylight
Mar 20, 2025 · Apt BLDNG
Close - Paint/plaster
Ceiling
Mar 20, 2025 · Apt BLDNG
Close - Paint/plaster
Wall
Mar 20, 2025 · Apt BLDNG
Close - Flooring/stairs
Floor
Feb 26, 2025 · Apt 2A
Close - Heat/hot water
Entire building
Oct 25, 2024 · Apt NA
Close - Unsanitary condition
Mold
Oct 25, 2024 · Apt 4A
Close - Unsanitary condition
Pests
Oct 25, 2024 · Apt 4D
Close - Heat/hot water
Entire building
Oct 22, 2023 · Apt 4D
Close - Unsanitary condition
Pests
Oct 16, 2023 · Apt 4D
Close - Unsanitary condition
Pests
Oct 16, 2023 · Apt 4D
Close - Unsanitary condition
Pests
Oct 16, 2023 · Apt 4D
Close - Unsanitary condition
Mold
Oct 16, 2023 · Apt 4D
Close - Flooring/stairs
Floor
Oct 16, 2023 · Apt 4D
Close - Heat/hot water
Apartment only
Oct 14, 2023 · Apt 4D
Close - General
Cabinet
May 25, 2023 · Apt 4D
Close - Flooring/stairs
Floor
May 25, 2023 · Apt 4D
Close - Flooring/stairs
Floor
May 25, 2023 · Apt 4D
Close - Door/window
Window frame
May 25, 2023 · Apt 4D
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Dec 18, 2025 | $4,300,000 | Rentals - walkup apartments | 29 |
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1927
- Floors
- 5
- Residential units
- 27
- Building area
- 24,710 ft²
- Lot area
- 6,000 ft²
- Zoning
- R7-2
- Community board
- 112
- Council district
- 10
- Block / lot
- 2175 / 88
- Assessed value
- $944,100
- Landmark / historic district
- No
HPD registration #117065, last renewed Dec 30, 2025.
Questions about 46 Sherman Avenue
Who owns 46 Sherman Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Jp 65 Arden LLC.
Does 46 Sherman Avenue have violations?
Yes. NYC HPD has recorded 291 housing violations at this property.
Is 46 Sherman Avenue rent stabilized?
NYC Department of Finance tax bills listed 22 rent-stabilized units here in 2024 (about 81% of its 27 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 46 Sherman Avenue built?
City records list 1927 as the year it was built.
How many apartments are in 46 Sherman Avenue?
It has 27 residential units and 29 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.