80 Arden Street
Manhattan, NY 10040BBL 1-02175-0135Map
Owner of record: Arden St. Realty,
80 Arden Street is an elevator apartment building built in 1930 in Manhattan, 10040. It has 30 residential units across 6 floors. The owner of record is Arden St. Realty,. HPD has recorded 109 housing violations here, most recently on November 2, 2023. 2 of the 50 most recent violations are still open. City tax records listed 27 rent-stabilized apartments here in 2024.
- HPD violations
- 109
- DOB violations
- 15
- ECB violations
- 5
- HPD complaints
- 326
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 109
- CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding maximum temperature of 130 degrees fahrenheit at plumbing fixtures in the entire apartment located at apt 3d, 3rd story, 1st apartment from west at north
Nov 2, 2023 · Apt 3D
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the kitchen located at apt 5d, 5th story, 1st apartment from north at east
Sep 20, 2019 · Apt 5D
Open — First no access to re- inspect violation - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 1st room from east at south, the 1st room from east at north, the private hallway , the foyer , the 3rd room from east located at apt 5d, 5th story, 1st apartment from north at east
Sep 20, 2019 · Apt 5D
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Sep 20, 2019
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Sep 20, 2019
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Sep 20, 2019
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at east wall in the 1st room from east at south located at apt 5d, 5th story, 1st apartment from north at east
Sep 20, 2019 · Apt 5D
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from east at south wall in the kitchen located at apt 5d, 5th story, 1st apartment from north at east
Sep 20, 2019 · Apt 5D
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from north at east wall in the kitchen located at apt 5d, 5th story, 1st apartment from north at east
Sep 20, 2019 · Apt 5D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the kitchen located at apt 5d, 5th story, 1st apartment from north at east
Sep 20, 2019 · Apt 5D
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 5d, 5th story, 1st apartment from north at east
Sep 20, 2019 · Apt 5D
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 5b, 5th story, 2nd apartment from south at west
Sep 16, 2019 · Apt 5B
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 5b, 5th story, 2nd apartment from south at west
Sep 16, 2019 · Apt 5B
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of air conditioner obstructing egress to fire escape window in the 1st room from north at east located at apt 2a, 2nd story, 1st apartment from south at west
Sep 9, 2019 · Apt 2A
Closed — Violation dismissed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate ... in the entire apartment located at apt 1b, 1st story, 2nd apartment from south at west
Sep 9, 2019 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Arrange and make self-closing the doors ... in the entrance located at apt 1b, 1st story, 2nd apartment from south at west
Sep 9, 2019 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape window in the 1st room from north at east located at apt 2a, 2nd story, 1st apartment from south at west
Sep 9, 2019 · Apt 2A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the bathroom located at apt 5e, 5th story, 2nd apartment from north at east
Sep 9, 2019 · Apt 5E
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at north wall in the bathroom located at apt 5e, 5th story, 2nd apartment from north at east
Sep 9, 2019 · Apt 5E
Closed — Violation dismissed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration sheetrock partition wall erected from floor (approx. 6 ft) creating additional room in the 1st room from north at west located at apt 5e, 5th story, 2nd apartment from north at east
Sep 9, 2019 · Apt 5E
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant materials at ceiling at public hall, 6th story
Sep 9, 2019
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 6th story
Sep 9, 2019
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 2nd story balcony, front stack
Sep 9, 2019
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 6th story
Jan 25, 2019
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 6th story
Jan 25, 2019
Closed — Violation dismissed - CImmediately hazardous
Repair the roof so that it will not leak over ceiling at public hall, 6th story
Jan 25, 2019
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective marble saddle at entrance in the bathroom located at apt 6d, 6th story, 1st apartment from west at north
May 23, 2017 · Apt 6D
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and walls in the 1st room from north at west located at apt 6d, 6th story, 1st apartment from west at north
May 23, 2017 · Apt 6D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and walls in the 1st room from north at east located at apt 6d, 6th story, 1st apartment from west at north
May 23, 2017 · Apt 6D
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and walls at closet in the foyer located at apt 6d, 6th story, 1st apartment from west at north
May 23, 2017 · Apt 6D
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at north wall around windows in the 1st room from north at west located at apt 6d, 6th story, 1st apartment from west at north
May 23, 2017 · Apt 6D
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling at closet in the foyer located at apt 6d, 6th story, 1st apartment from west at north
May 23, 2017 · Apt 6D
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at north wall around windows in the 1st room from north at east located at apt 6d, 6th story, 1st apartment from west at north
May 23, 2017 · Apt 6D
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
May 17, 2017
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
May 17, 2017
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
May 17, 2017
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
May 6, 2017
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
May 6, 2017
Closed — Violation dismissed - BHazardous
Arrange and make self-closing the doors .. in the entrance located at apt 1d, 1st story, 1st apartment from west at north
May 6, 2017 · Apt 1D
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wooden floor in the private hallway located at apt 1d, 1st story, 1st apartment from west at north
May 6, 2017 · Apt 1D
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing escutscheon plate at ceiling at riser in the bathroom located at apt 1d, 1st story, 1st apartment from west at north
May 6, 2017 · Apt 1D
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the 1st room from north located at apt 5d, 5th story, 1st apartment from north at east
Jul 12, 2016 · Apt 5D
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt 5d, 5th story, 1st apartment from north at east
Jul 12, 2016 · Apt 5D
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in the drain pipe in the kitchen located at apt 5d, 5th story, 1st apartment from north at east
Jul 12, 2016 · Apt 5D
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective marble saddle in the bathroom located at apt 5d, 5th story, 1st apartment from north at east
Jul 12, 2016 · Apt 5D
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the bathroom located at apt 5d, 5th story, 1st apartment from north at east
Jul 12, 2016 · Apt 5D
Open — Not complied with - ANon-hazardous
Refit closet door in the 3rd room from north located at apt 5d, 5th story, 1st apartment from north at east
Jul 12, 2016 · Apt 5D
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective marble saddle in the entrance located at apt 5d, 5th story, 1st apartment from north at east
Jul 12, 2016 · Apt 5D
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors .. in the entrance located at apt 5d, 5th story, 1st apartment from north at east
Jul 12, 2016 · Apt 5D
Closed — Violation closed - ANon-hazardous
Refit the door in the entrance located at apt 5d, 5th story, 1st apartment from north at east
Jul 12, 2016 · Apt 5D
Closed — Violation closed
DOB building violations · 15
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 10, 2014
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 22, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 10, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 29, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 1, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 10, 2005
Dob violation - resolved
Show 5 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Jun 23, 2004
Dob violation - resolved - Elevator elevatorrequired
1p18802
Dec 3, 1999
Dob violation - resolved - Elevator elevatorrequired
1p18802
Apr 19, 1999
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 9, 1992
Vp*-violation unserved ecb- dismissed - Elevator elevatorrequired
31 x 32/covers-37/chain guard
Dec 20, 1989
Dob violation - resolved
ECB violations · 5
- Class - 2
Federal steam boiler has smoke on start+does not modulate low-high fire+has noise+vibration+oil pump runs continually;correct violation+submit certificate of correction
Mar 26, 2026
Resolve - Non-hazardous
18m07-23d06-03f11-37n09-03o02-20x10-57o02-15p07-10h07. 15-remove lock on outside of base. hoistway door.
Jul 2, 2001 · Penalty $440
Resolve - Non-hazardous
371809/20x10/46f11/47#12/10h07/10m07/18m07/23d06/03f11 - remove by pass from fuses resotre car coming lts. in hall strategic equalize tension replace worn, defective gov. rope, replace damage & missing car burt
Oct 24, 2000
Resolve - Non-hazardous
15r,35p,3d,73o, 15 door-knob
Mar 16, 1994 · Penalty $100
Resolve - Non-hazardous
10d,11q,22d,35l,57o. 33l stop loader to machine.
Dec 9, 1992
Resolve
Complaints
- Unsanitary condition
Pests
Sep 10, 2026 · Apt 4A
Open - Heat/hot water
Apartment only
Aug 12, 2026 · Apt 1A
Close - Plumbing
Water supply
Jul 2, 2026 · Apt BLDG
Close - Plumbing
Water supply
Jul 2, 2026 · Apt 6E
Open - Plumbing
Water supply
Jul 2, 2026 · Apt 4A
Close - Plumbing
Water supply
Jul 2, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 2, 2026 · Apt 2C
Close - Heat/hot water
Apartment only
Feb 17, 2026 · Apt 2C
Close - Heat/hot water
Entire building
Feb 17, 2026 · Apt 2C
Close - Heat/hot water
Entire building
Feb 10, 2026 · Apt 2C
Close
Show 40 more ↓
- Heat/hot water
Entire building
Feb 9, 2026 · Apt 2C
Close - Heat/hot water
Entire building
Jan 18, 2026 · Apt BLDG
Close - Plumbing
Water supply
Jan 11, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 11, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 1, 2026 · Apt 2C
Close - Heat/hot water
Entire building
Dec 30, 2025 · Apt BUILDI
Close - Heat/hot water
Entire building
Apr 7, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 1, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 27, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 17, 2025 · Apt BLDG
Close - Appliance
Electric/gas range
Aug 22, 2024 · Apt 6B
Close - Appliance
Electric/gas range
Aug 21, 2024 · Apt 6B
Close - Heat/hot water
Entire building
Feb 18, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 12, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 15, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 13, 2023 · Apt 2C
Close - Heat/hot water
Entire building
Dec 6, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 6, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 21, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 9, 2023 · Apt 2C
Close - Heat/hot water
Entire building
Nov 3, 2023 · Apt 2C
Close - Heat/hot water
Entire building
Nov 1, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 31, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 23, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 14, 2022 · Apt 2C
Close - Heat/hot water
Entire building
Mar 4, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 24, 2022 · Apt 2C
Close - Heat/hot water
Entire building
Feb 19, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 18, 2022 · Apt 2C
Close - Heat/hot water
Entire building
Feb 7, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 5, 2022 · Apt 2C
Close - Heat/hot water
Entire building
Jan 16, 2022 · Apt 2C
Close - Heat/hot water
Entire building
Jan 8, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 7, 2021 · Apt 2C
Close - Water leak
Heavy flow
Oct 30, 2021 · Apt 6D
Close - Water leak
Heavy flow
Sep 1, 2021 · Apt 6D
Close - Unsanitary condition
Garbage/recycling storage
Jun 25, 2020 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 11, 2020 · Apt 2C
Close - Heat/hot water
Entire building
Mar 28, 2020 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1930
- Floors
- 6
- Residential units
- 30
- Building area
- 28,753 ft²
- Lot area
- 6,000 ft²
- Zoning
- R7-2
- Community board
- 112
- Council district
- 10
- Block / lot
- 2175 / 135
- Assessed value
- $845,100
- Landmark / historic district
- No
HPD registration #127932, last renewed Jul 16, 2025.
Questions about 80 Arden Street
Who owns 80 Arden Street?
The owner of record in NYC Department of City Planning PLUTO data is Arden St. Realty,.
Does 80 Arden Street have violations?
Yes. NYC HPD has recorded 109 housing violations at this property.
Is 80 Arden Street rent stabilized?
NYC Department of Finance tax bills listed 27 rent-stabilized units here in 2024 (about 90% of its 30 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 80 Arden Street built?
City records list 1930 as the year it was built.
How many apartments are in 80 Arden Street?
It has 30 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.