112-09 Queens Boulevard is an office building built in 1983 in Queens, 11375. The owner of record is Cet LLC. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
151
ECB violations
45
HPD complaints
3

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 151

  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2023)

    Jun 23, 2024

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2022

    Apr 22, 2023

    Dob violation - dismissed
  • Failure to correct swarmp conditions (facade) facade required

    Cycle 9b failure to correct swarmp conditions

    Feb 17, 2023

    Dob violation - dismissed
  • Hazardous condition (facade) facade required

    Cycle 9b unsafe report filed

    Feb 17, 2023

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - dismissed
Show 40 more ↓
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 27, 2019

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Sprinkler none

    Failed to file final sprinkler report by july 1, 2019

    Sep 3, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 6, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 6, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 6, 2018

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 14, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 14, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 14, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 14, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 14, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 14, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 14, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 14, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 14, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 14, 2017

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed

ECB violations · 45

  • Class - 2

    At the time of my inspection i observed 2 workers (alberto lucio and ramon rosales galvez)using/working on suspended scaffold uppon request to see certificate of fitness issued by rigger-none were provided/obta

    May 5, 2023

    Resolve
  • Class - 1

    At the time of my inspection i observed workers using/work(access for suspended scaffold/storing material/preparing for work) on roof/setback at exp#2 aprox 15 feet high(parapet wall only aprox1 foot high) with

    May 5, 2023 · Penalty $2,500

    Resolve
  • Class - 2

    At the time of my inspection of active facade restoration job site uppon request to see -ssm/qssp log books,design drawings for chook suspended scaffold , pre/post installation letter for suspended scaffold,mot

    May 5, 2023

    Resolve
  • Class - 1

    At the time of my inspection uppon asking qssp/foreman to see sst supervisor card -saviel davila did not poses a valid nycdob training sst card as required per march 18 2023 , permit holder failed to comply wit

    May 5, 2023 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to complete the installation of a full system of automatic sprinklers and file a final sprinkler report prepared by a registered design professional in an office building 100 feet or more in height in e

    Nov 1, 2021 · Penalty $6,250

    Resolve
  • Class - 2

    1. bell button in side of car is not operative . 2. repair emergency light . 3. adjust door operator

    Jun 28, 2021

    Resolve
  • Class - 2

    Expired cat 1 test tag. perform &file test.

    Jun 28, 2021

    Resolve
  • Class - 2

    27-929.1 a.c.27-929.1,failure to complete the installation of a full system of automatic sprinklers and file a final sprinkler report prepared by a registered design professional in an office building 100' or m

    Mar 30, 2021 · Penalty $6,250

    Resolve
  • Class - 2

    27-929.1 failure to complete the installation of a full system of automatic sprinklers and file a final sprinkler report prepared by a registered design professional by july 1,2019,in an office building 100 fee

    Jul 13, 2020 · Penalty $3,125

    Resolve
  • Class - 2

    02x10: (02-x-10) in car emergency phone inoperative

    Feb 12, 2020 · Penalty $625

    Resolve
Show 35 more ↓
  • Class - 1

    42m07:no door monitoring installed in this controller as mandated by 3.10.12 appendix k of the 2014 nycbc. this is a controller feature which ensures passengers safety. remedy:file application,install dlm and p

    Feb 12, 2020 · Penalty $1,250

    Resolve
  • Class - 1

    42m07:(42-m-07)no door monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controllerfeature which ensure passenger safety. remedy:file application,install

    Feb 12, 2020 · Penalty $1,250

    Resolve
  • Class - 1

    42m07:(42-m-07)no door monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controllerfeature which ensure passenger safety. remedy:file application,install

    Feb 12, 2020 · Penalty $1,250

    Resolve
  • Class - 1

    42m07:(42-m-07)no dlm door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. remedy:file applicat

    Feb 12, 2020 · Penalty $1,250

    Resolve
  • Class - 1

    01l10,42m07:(01-l-10)fix stop button. (42-m-07)no door lock monitoringinstalled in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensure passenger sa

    Feb 12, 2020 · Penalty $1,250

    Resolve
  • Class - 1

    42m07:(42-m-07)no door monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controllerfeature which ensures passenger safety. remedy:file application,instal

    Feb 12, 2020 · Penalty $1,250

    Resolve
  • Class - 1

    42m07:(42-m-07)no door monitoring installed in this controller as mandated by 3.10.12 of appendix k of the 2014 nycbc. this is a controller feature which ensures passenger safety. remedy:file application,instal

    Feb 12, 2020 · Penalty $1,250

    Resolve
  • Class - 2

    Ac279291-failure to complete the installation of a full system of automatic sprinklers and file a final sprinkler report prepared by a registered design professional by july 1,2019,in an office building 100 fee

    Nov 15, 2019 · Penalty $1,250

    Resolve
  • Class - 1

    Cease use. 52-m-7 missing one hoist riope ou the machine.

    Aug 12, 2019 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit acceptable 7th round report of critical examnation documenting condition of exterior walls and appurtenances required by 28-302.4. agg2 history of noncompliance on 36023519m (agg1),36019803h.r

    Aug 11, 2016 · Penalty $2,000

    Resolve
  • Class - 2

    Failure to maintain exterior building facade.note:west,north,east elevation exposure# 2,3&4 crack/chippimg brick loose mortar/missing erodedcaulking.mortar at several location at all around parking garage area.

    May 9, 2016 · Penalty $500

    Resolve
  • Class - 2

    Failure to file an acceptable technical report in compliance w/code provisions: periodic inspection pf exterior walls & appurtenances as required by article 28.302 & the dob's rules & regulations. remedy: file

    Nov 2, 2015 · Penalty $2,030

    Resolve
  • Class - 2

    Failure to provide aproved/accepted plans at jobsite at time of inspection.observed active facade work in progress, 2 men on suspended scaf fold from c hooks.when i asked men for approved plans for work in prog

    May 27, 2015

    Resolve
  • Class - 2

    3301.1.2 failure to comply w/nyc fire code. obstruction of siamese connection. at time of inspection observed apprx 100' of sidewalk shed installed.occupied 17 story bldg undergoing facade restoration.siamese

    Oct 18, 2014 · Penalty $400

    Resolve
  • Class - 2

    Work w/o a permit; expired permit. at time of inspection observed 2 suspended scaffolds on c-hooks. search of dob records show permit #420987846 expired 10-17-14. rmdy: renew permit.

    Oct 18, 2014 · Penalty $400

    Resolve
  • Class - 2

    Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat

    Sep 19, 2014 · Penalty $800

    Resolve
  • Class - 1

    Noted exit passageway chain pad locked at 1fl also cellar lvl car parked in front of exit door rem: remove obstructions

    Feb 2, 2012 · Penalty $1,000

    Resolve
  • Class - 2

    Failure to maintain bldg. noted defective exit lights, also rusted structurual elements cellar level i beam and q deck throughout, causing fire proofing to detach. also noted water entering garage at se corner

    Feb 2, 2012 · Penalty $250

    Resolve
  • Class - 2

    67x10,02x10. 67-x-10 in car emergency phone inoperative.

    Dec 16, 2009 · Penalty $500

    Resolve
  • Class - 3

    Work doesn't conform to approved construction documents & or approved amendments for alt.ii job # 402167025 permit expired 10/23/05 non-conforming work found 1) plans show open space across from elevator lobby

    Dec 29, 2008 · Penalty $100

    Resolve
  • Class - 3

    Work doesn't conform to approved construction documents for alt.ii job # 402167016 permit expired 10/23/05 non-conforming work found 1) plans show newly erected wall dividing customer service area on the

    Dec 29, 2008 · Penalty $100

    Resolve
  • Class - 3

    Work doesn't conform to approved construction documents & or approved amendments for alt.ii job # 402122127 expired 10/01/05 noted:1) plan shows mens ada bathrm to be installed found no ada bathrm installed as

    Dec 29, 2008 · Penalty $200

    Resolve
  • Class - 2

    Provision of law bc. 1704.10 failure to file tr-1 at completion of controlled crork/ special inspection noted: job # 402285433/a2/permit expired 04-01-06. exterior repairs completed and it accepted, require to

    Oct 7, 2008 · Penalty $400

    Resolve
  • Class - 1

    Failure to maintain bldg in code compliant manner. noted: level g4 q deck ceiling is falling, missing and loose rusted section throughout and ramp to level g4 at ceiling drain pipe penetration. remedy: maintain

    Jul 2, 2008 · Penalty $1,000

    Resolve
  • Hazardous

    Failed to maintain.metal q deck @ceiling is faling w.missing & loose rusted through sections @ceiling slab level g4 througout loose concreteover ramp to level c4 at ceiling drain pipe penetration rmd:maintain

    Jan 31, 2008

    Resolve
  • Hazardous

    Failed to maintain:missing fire-proofing and rusting of unprotected q deck&steel ibeams thoughout garage in various areas. rmd:maintain bldg

    Jan 31, 2008

    Resolve
  • Hazardous

    27-464 artc.10public garage:no curb or bumbers wall protection at ext.parapet walls (as per sec27-464)to prevent vehicular contact & damage to bldg walls parapet. rmd:comply with sec.27-464/provide protection

    Jan 31, 2008

    Resolve
  • Hazardous

    Failure to maintain: note:exit light @ exit stairs d, level 2 of park ing garage is not working. remedy: maintain bldg.

    Jan 31, 2008

    Resolve
  • Non-hazardous

    75u05,23u16.

    Dec 21, 1999

    Resolve
  • Non-hazardous

    75u05

    Dec 21, 1999

    Resolve
  • Non-hazardous

    02l50o 02- repair alarm bell 50-clean down main machine.

    Apr 27, 1998

    Resolve
  • Non-hazardous

    03m,01b,(03)phone box cover handles(01)properly secure stop button to car button station.

    Oct 10, 1992

    Resolve
  • Non-hazardous

    2l,11

    Sep 10, 1991

    Resolve
  • Non-hazardous

    46h 12

    Sep 10, 1991

    Resolve
  • Non-hazardous

    4l, 11

    Sep 10, 1991

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Jan 27, 2026 · Apt BLDG

    Close
  • Electric

    Power outage

    Aug 24, 2025 · Apt 1

    Close
  • Heat/hot water

    Entire building

    Nov 20, 2022 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Office building (O6)
Year built
1983
Floors
16
Residential units
—
Building area
518,929 ft²
Lot area
78,500 ft²
Zoning
C4-2
Community board
406
Council district
29
Block / lot
2270 / 41
Assessed value
$31,932,450
Landmark / historic district
No

Questions about 112-09 Queens Boulevard

Who owns 112-09 Queens Boulevard?

The owner of record in NYC Department of City Planning PLUTO data is Cet LLC.

Does 112-09 Queens Boulevard have violations?

NYC HPD has no housing violations on record for this property.

Is 112-09 Queens Boulevard rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 112-09 Queens Boulevard built?

City records list 1983 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.