33-54 99 Street
Queens, NY 11368BBL 4-01713-0033Map
Owner of record: Kou, Law, Cohen LLC
33-54 99 Street is a walk-up apartment building built in 1927 in Queens, 11368. It has 16 residential units across 4 floors. The owner of record is Kou, Law, Cohen LLC. HPD has recorded 117 housing violations here, most recently on July 22, 2026. City tax records listed 14 rent-stabilized apartments here in 2024.
- HPD violations
- 117
- DOB violations
- 3
- ECB violations
- 18
- HPD complaints
- 151
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 117
- BHazardous
Provide adequate supply of hot water for the fixtures at sink in the kitchen located at apt 3d, 3rd story, 2nd apartment from south at west
Jul 22, 2026 · Apt 3D
Closed — Violation dismissed - BHazardous
Provide adequate supply of cold water for the fixtures at sink in the kitchen located at apt 3d, 3rd story, 2nd apartment from south at west
Jul 22, 2026 · Apt 3D
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 2b, 2nd story, 1st apartment from south at west
May 7, 2026 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and north wall in the kitchen located at apt 2b, 2nd story, 1st apartment from south at west
May 7, 2026 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st closet from north at east wall door in the private hallway located at apt 3a, 1st story, 2nd apartment from south at west
Feb 13, 2026 · Apt 3A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer located at apt 3a, 1st story, 2nd apartment from south at west
Feb 13, 2026 · Apt 3A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at west wall in the 1st room from north located at apt 3a, 1st story, 2nd apartment from south at west
Feb 13, 2026 · Apt 3A
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st riser from west at north wall in the bathroom located at apt 3a, 1st story, 2nd apartment from south at west
Feb 13, 2026 · Apt 3A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the 3rd room from north located at apt 3a, 1st story, 2nd apartment from south at west
Feb 13, 2026 · Apt 3A
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 3a, 1st story, 2nd apartment from south at west
Feb 13, 2026 · Apt 3A
Closed — Violation closed
Show 40 more ↓
- BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3a, 1st story, 2nd apartment from south at west
Feb 13, 2026 · Apt 3A
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective upper sash spring balance at 1st window from south at west wall in the 1st room from north located at apt 3a, 1st story, 2nd apartment from south at west
Feb 13, 2026 · Apt 3A
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective upper and lower sash spring balance at 1st window from south at west wall in the kitchen located at apt 3a, 1st story, 2nd apartment from south at west
Feb 13, 2026 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door, 1st closet from north at east wall door frame, 1st door frame from east at south wall in the 1st room from north located at apt 3a, 1st story, 2nd apartment from south at west
Feb 13, 2026 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door from east at south wall, 1st window frame from west at north wall, 1st window frame from south at west wall in the 1st room from north located at apt 3a, 1st story, 2nd apartment from south at west
Feb 13, 2026 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the bathroom located at apt 3a, 1st story, 2nd apartment from south at west
Feb 13, 2026 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door from north at east wall in the bathroom located at apt 3a, 1st story, 2nd apartment from south at west
Feb 13, 2026 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door frame, 1st door frame from east at south wall in the private hallway located at apt 3a, 1st story, 2nd apartment from south at west
Feb 13, 2026 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st window frame from south at west wall in the 3rd room from north located at apt 3a, 1st story, 2nd apartment from south at west
Feb 13, 2026 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, south wall, west wall, 1st window frame from south at west wall in the kitchen located at apt 3a, 1st story, 2nd apartment from south at west
Feb 13, 2026 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 3a, 1st story, 2nd apartment from south at west
Feb 13, 2026 · Apt 3A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from east at south wall, 1st window frame from west at north wall, 1st window frame from south at west wall in the 1st room from north located at apt 3a, 1st story, 2nd apartment from south at west
Feb 13, 2026 · Apt 3A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from north at east wall in the bathroom located at apt 3a, 1st story, 2nd apartment from south at west
Feb 13, 2026 · Apt 3A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from north at east wall door in the private hallway located at apt 3a, 1st story, 2nd apartment from south at west
Feb 13, 2026 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at apartment entrance door in the entrance located at apt 4d, 4th story, 1st apartment from west at north
Oct 13, 2025 · Apt 4D
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4a, 1st story, 1st apartment from west at north
Jun 19, 2025 · Apt 4A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 3a, 1st story, 2nd apartment from south at west
Jun 14, 2025 · Apt 3A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective electrical outlet at south wall in the 2nd room from north located at apt 3a, 1st story, 2nd apartment from south at west
Jun 14, 2025 · Apt 3A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective electrical outlet at north wall in the 2nd room from north located at apt 3a, 1st story, 2nd apartment from south at west
Jun 14, 2025 · Apt 3A
Closed — Violation dismissed - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3a, 1st story, 2nd apartment from south at west
Jun 14, 2025 · Apt 3A
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3a, 1st story, 2nd apartment from south at west
Jun 14, 2025 · Apt 3A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from north located at apt 3a, 1st story, 2nd apartment from south at west
Jun 14, 2025 · Apt 3A
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east wall in the 1st room from north located at apt 3a, 1st story, 2nd apartment from south at west
Jun 14, 2025 · Apt 3A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective upper window sash spring balance in the kitchen located at apt 3a, 1st story, 2nd apartment from south at west
Jun 14, 2025 · Apt 3A
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3a, 1st story, 2nd apartment from south at west
Jun 14, 2025 · Apt 3A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch set at building entrance
Sep 4, 2024
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west
Sep 4, 2024 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 1b, 2nd story, 1st apartment from east at south
May 1, 2024 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system boiler room locked at basement story at boiler room
Apr 20, 2024
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4c, 3rd story, 1st apartment from west at north
Apr 20, 2024 · Apt 4C
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl tiles at floor in the kitchen located at apt 4c, 3rd story, 1st apartment from west at north
Apr 20, 2024 · Apt 4C
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 1b, 1st story
Mar 24, 2024 · Apt 1B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 1st room from north located at apt 3c, 3rd story, 2nd apartment from south at west
Mar 12, 2024 · Apt 3C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroom located at apt 3c, 3rd story, 2nd apartment from south at west
Mar 12, 2024 · Apt 3C
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the foyer located at apt 1b, 2nd story, 1st apartment from east at south
Mar 5, 2024 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 1b, 2nd story, 1st apartment from east at south
Mar 5, 2024 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1b, 2nd story, 1st apartment from east at south
Mar 5, 2024 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 1b, 2nd story, 1st apartment from east at south
Mar 5, 2024 · Apt 1B
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 1; in the entire apartment located at apt 3c, 3rd story, 2nd apartment from south at west
Jan 16, 2024 · Apt 3C
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall in the 3rd room from north at west located at apt 1b, 2nd story, 1st apartment from east at south
Jan 9, 2024 · Apt 1B
Closed — Violation closed
DOB building violations · 3
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - dismissed
ECB violations · 18
- Class - 2
40,50a-e. (50)hot water heater is not direct into chimney above larger flue. (50a)right side boiler jacket not in place. (50b)hwh safety valve is defective. (50c)discharge pipe not copper. (50d)storage in boile
Mar 5, 2018
Resolve - Class - 2
B254,50,50a,50b,50c,50d,50e,50f. 50-chimney to be sealed; 50a-water heater smoke pipe not fitted properly; 50b-water heater and boiler smoking pipe to be supported; 50c-pop safety discharge on boiler to short;
Feb 6, 2013
Resolve - Non-hazardous
10a35. section leaking left side front. seal opening in front by oil burner
Oct 29, 1999
Resolve - Hazardous
Occupancy contrary to that allowed by the certificate of occupancy or bldg dept records. cellar changed from storage & ordinary use to an apt. partitions erected and bath facilities have been installed.
Aug 7, 1997
Resolve - Hazardous
Occupancy contrary to building dept records multiple dwelling walk up apt now occupied with partitions created in cellar for sleeping & living arrangements with 3 pc bathroom. remedy: discontinue illegal use fo
Jun 9, 1997
Resolve - Non-hazardous
Work without a permit. work noted: partitions creating for sleeping & living accomodations. full 3 piece bathroom. remedy: obtain approvals & permits for above stated work if feasible or restore to prior legal
Jun 9, 1997
Resolve - Non-hazardous
Fefusal of right of entry and inspectioin: superintendant of bldg refused entry to basement. remedy: permit access to premises for in- spection.
Feb 2, 1990
Resolve - Non-hazardous
Work without a permit. closing up of 16 windows in basement: 11 with masonry and 5 with metal. remedy: obtain necessary permits or restorepremises to prior legal condition.
Feb 2, 1990 · Penalty $250
Resolve - Hazardous
Failure to maintain. broken windows in a public stairwell between 1st and 4th fl at all location. remedy: make necessary repairs to thesatisfaction of this dept.
Feb 2, 1990
Resolve - Hazardous
Failure to maintain. no protective screening under a skylight in a public stairwell. remedy: make all necessary repairs to the satis- faction of this dept.
Feb 2, 1990 · Penalty $500
Resolve
Show 8 more ↓
- Hazardous
Failure to maintain. metal flashing missing at front of bldg (north east corner) at top of parapet. remedy: make necessary repairs to thesatisfaction of this dept.
Feb 2, 1990
Resolve - Hazardous
Failure to maintain. looose defective masonry at northeast corner at parapet and column. remedy: make necessary repairs to the satisfac- tion of this dept.
Feb 2, 1990
Resolve - Hazardous
Failure to maintain. excessive erosion and vertical structural crack-ing (separation) of chimney at northwest corner of bldg. remedy: makenecessary repairs to the satisfaction of this dept.
Feb 2, 1990 · Penalty $625
Resolve - Hazardous
Failure to maintain. loose copings at various areas of all parapet. remedy: make necessary repairs to the satisfaction of this dept.
Feb 2, 1990 · Penalty $1,000
Resolve - Hazardous
Failure to maintain. metal flashing missing at southeast corner of roof at hip exposing wood framing. remedy: make necessary repairs to the satisfaction of this dept.
Feb 2, 1990 · Penalty $625
Resolve - Hazardous
Failure to maintain. firerating missing at various locations in hall-way at wall areas in apt number a-4. remedy: make all necessary re- pairs to the satisfaction of this dept.
Feb 2, 1990
Resolve - Hazardous
Failure to maintain. loose and defective masonary at top parapet front of building. remedy: make all necessary repairs to the satisfaction of this dept.
Jan 11, 1990
Resolve - Hazardous
Failure to maintain. fire rating missing in bathroom at ceiling, left side of apartment number a-4 remedy: make necessary repairs to the satisfaction of this dept.
Jan 11, 1990 · Penalty $500
Resolve
Complaints
- Plumbing
Basin/sink
Jul 14, 2026 · Apt 3D
Close - Plumbing
Bathtub/shower
Jun 20, 2026 · Apt 3D
Close - Plumbing
Basin/sink
Jun 20, 2026 · Apt 3D
Close - Water leak
Slow leak
May 9, 2026 · Apt 2B
Close - Paint/plaster
Wall
May 9, 2026 · Apt 2B
Close - Water leak
Damp spot
Apr 24, 2026 · Apt 2B
Close - Paint/plaster
Wall
Apr 24, 2026 · Apt 2B
Close - Paint/plaster
Door/frame
Mar 9, 2026 · Apt 1A
Close - Heat/hot water
Entire building
Feb 2, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 1, 2026 · Apt 4C2B
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Jan 31, 2026 · Apt 4C
Close - Heat/hot water
Apartment only
Jan 31, 2026 · Apt 2B
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 30, 2026 · Apt 4C
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt 2B
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt 4C
Close - Heat/hot water
Apartment only
Jan 30, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt 3A
Close - Safety
Smoke detector
Jan 30, 2026 · Apt 3A
Close - Safety
Carbon monoxide detector
Jan 30, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt BLDG
Close - Door/window
Window frame
Jan 30, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Nov 10, 2025 · Apt 4C
Close - Water leak
Heavy flow
Oct 27, 2025 · Apt APT2B
Close - Heat/hot water
Entire building
Oct 12, 2025 · Apt 4D
Close - Heat/hot water
Apartment only
Jun 18, 2025 · Apt 4A
Close - Heat/hot water
Apartment only
Jun 12, 2025 · Apt 3A
Close - Paint/plaster
Window/frame
Jul 18, 2024 · Apt 2B
Close - Paint/plaster
Ceiling
Jul 18, 2024 · Apt 2B
Close - Heat/hot water
Entire building
Apr 18, 2024 · Apt 4C
Close - Heat/hot water
Entire building
Apr 18, 2024 · Apt 4C
Close - Flooring/stairs
Floor
Dec 20, 2023 · Apt 4C
Close - Line of travel
Line of travel
Nov 20, 2023 · Apt BLDG
Close - Line of travel
Line of travel
Nov 20, 2023 · Apt 3C
Close - Line of travel
Line of travel
Nov 20, 2023 · Apt 1B
Close - Flooring/stairs
Floor
Jul 21, 2023 · Apt 2B
Close - Flooring/stairs
Floor
Jul 7, 2023 · Apt 2B
Close - Unsanitary condition
Pests
Jul 7, 2023 · Apt 2B
Close - Paint/plaster
Wall
Jul 7, 2023 · Apt 2B
Close - Water leak
Slow leak
Jul 7, 2023 · Apt 2B
Close - Unsanitary condition
Pests
Jul 7, 2023 · Apt 2B
Close - Paint/plaster
Ceiling
Jul 7, 2023 · Apt 2B
Close - Heat/hot water
Entire building
Apr 21, 2022 · Apt 4C
Close - Water leak
Slow leak
Jun 10, 2021 · Apt 2B
Close - Water leak
Slow leak
Mar 24, 2021 · Apt 1D
Close - Water leak
Slow leak
Feb 28, 2021 · Apt 1D
Close - Appliance
Electric/gas range
Feb 22, 2021 · Apt APT3B
Close - Appliance
Refrigerator
Feb 22, 2021 · Apt APT3B
Close - Door/window
Door
Dec 23, 2020 · Apt 4C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1927
- Floors
- 4
- Residential units
- 16
- Building area
- 13,140 ft²
- Lot area
- 4,000 ft²
- Zoning
- R5A
- Community board
- 403
- Council district
- 21
- Block / lot
- 1713 / 33
- Assessed value
- $382,050
- Landmark / historic district
- No
HPD registration #401900, last renewed Aug 19, 2025.
Questions about 33-54 99 Street
Who owns 33-54 99 Street?
The owner of record in NYC Department of City Planning PLUTO data is Kou, Law, Cohen LLC.
Does 33-54 99 Street have violations?
Yes. NYC HPD has recorded 117 housing violations at this property.
Is 33-54 99 Street rent stabilized?
NYC Department of Finance tax bills listed 14 rent-stabilized units here in 2024 (about 88% of its 16 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 33-54 99 Street built?
City records list 1927 as the year it was built.
How many apartments are in 33-54 99 Street?
It has 16 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.