roofy

33-54 99 Street

Queens, NY 11368BBL 4-01713-0033Map

Owner of record: Kou, Law, Cohen LLC

33-54 99 Street is a walk-up apartment building built in 1927 in Queens, 11368. It has 16 residential units across 4 floors. The owner of record is Kou, Law, Cohen LLC. HPD has recorded 117 housing violations here, most recently on July 22, 2026. City tax records listed 14 rent-stabilized apartments here in 2024.

HPD violations
117
DOB violations
3
ECB violations
18
HPD complaints
151

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Watch
Last violation Jul 22, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
14
About 88% of the building's 16 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 117

  • B

    Provide adequate supply of hot water for the fixtures at sink in the kitchen located at apt 3d, 3rd story, 2nd apartment from south at west

    Jul 22, 2026 · Apt 3D

    Closed — Violation dismissed
  • B

    Provide adequate supply of cold water for the fixtures at sink in the kitchen located at apt 3d, 3rd story, 2nd apartment from south at west

    Jul 22, 2026 · Apt 3D

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 2b, 2nd story, 1st apartment from south at west

    May 7, 2026 · Apt 2B

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling and north wall in the kitchen located at apt 2b, 2nd story, 1st apartment from south at west

    May 7, 2026 · Apt 2B

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st closet from north at east wall door in the private hallway located at apt 3a, 1st story, 2nd apartment from south at west

    Feb 13, 2026 · Apt 3A

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer located at apt 3a, 1st story, 2nd apartment from south at west

    Feb 13, 2026 · Apt 3A

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at west wall in the 1st room from north located at apt 3a, 1st story, 2nd apartment from south at west

    Feb 13, 2026 · Apt 3A

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation at 1st riser from west at north wall in the bathroom located at apt 3a, 1st story, 2nd apartment from south at west

    Feb 13, 2026 · Apt 3A

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling in the 3rd room from north located at apt 3a, 1st story, 2nd apartment from south at west

    Feb 13, 2026 · Apt 3A

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 3a, 1st story, 2nd apartment from south at west

    Feb 13, 2026 · Apt 3A

    Closed — Violation closed
Show 40 more ↓
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3a, 1st story, 2nd apartment from south at west

    Feb 13, 2026 · Apt 3A

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective upper sash spring balance at 1st window from south at west wall in the 1st room from north located at apt 3a, 1st story, 2nd apartment from south at west

    Feb 13, 2026 · Apt 3A

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective upper and lower sash spring balance at 1st window from south at west wall in the kitchen located at apt 3a, 1st story, 2nd apartment from south at west

    Feb 13, 2026 · Apt 3A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door, 1st closet from north at east wall door frame, 1st door frame from east at south wall in the 1st room from north located at apt 3a, 1st story, 2nd apartment from south at west

    Feb 13, 2026 · Apt 3A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door from east at south wall, 1st window frame from west at north wall, 1st window frame from south at west wall in the 1st room from north located at apt 3a, 1st story, 2nd apartment from south at west

    Feb 13, 2026 · Apt 3A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the bathroom located at apt 3a, 1st story, 2nd apartment from south at west

    Feb 13, 2026 · Apt 3A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door from north at east wall in the bathroom located at apt 3a, 1st story, 2nd apartment from south at west

    Feb 13, 2026 · Apt 3A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door frame, 1st door frame from east at south wall in the private hallway located at apt 3a, 1st story, 2nd apartment from south at west

    Feb 13, 2026 · Apt 3A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st window frame from south at west wall in the 3rd room from north located at apt 3a, 1st story, 2nd apartment from south at west

    Feb 13, 2026 · Apt 3A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, south wall, west wall, 1st window frame from south at west wall in the kitchen located at apt 3a, 1st story, 2nd apartment from south at west

    Feb 13, 2026 · Apt 3A

    Closed — Violation closed
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 3a, 1st story, 2nd apartment from south at west

    Feb 13, 2026 · Apt 3A

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door from east at south wall, 1st window frame from west at north wall, 1st window frame from south at west wall in the 1st room from north located at apt 3a, 1st story, 2nd apartment from south at west

    Feb 13, 2026 · Apt 3A

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door from north at east wall in the bathroom located at apt 3a, 1st story, 2nd apartment from south at west

    Feb 13, 2026 · Apt 3A

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st closet from north at east wall door in the private hallway located at apt 3a, 1st story, 2nd apartment from south at west

    Feb 13, 2026 · Apt 3A

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at apartment entrance door in the entrance located at apt 4d, 4th story, 1st apartment from west at north

    Oct 13, 2025 · Apt 4D

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4a, 1st story, 1st apartment from west at north

    Jun 19, 2025 · Apt 4A

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 3a, 1st story, 2nd apartment from south at west

    Jun 14, 2025 · Apt 3A

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective electrical outlet at south wall in the 2nd room from north located at apt 3a, 1st story, 2nd apartment from south at west

    Jun 14, 2025 · Apt 3A

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective electrical outlet at north wall in the 2nd room from north located at apt 3a, 1st story, 2nd apartment from south at west

    Jun 14, 2025 · Apt 3A

    Closed — Violation dismissed
  • B

    Abate the infestation consisting of mice in the entire apartment located at apt 3a, 1st story, 2nd apartment from south at west

    Jun 14, 2025 · Apt 3A

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3a, 1st story, 2nd apartment from south at west

    Jun 14, 2025 · Apt 3A

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from north located at apt 3a, 1st story, 2nd apartment from south at west

    Jun 14, 2025 · Apt 3A

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color east wall in the 1st room from north located at apt 3a, 1st story, 2nd apartment from south at west

    Jun 14, 2025 · Apt 3A

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective upper window sash spring balance in the kitchen located at apt 3a, 1st story, 2nd apartment from south at west

    Jun 14, 2025 · Apt 3A

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 3a, 1st story, 2nd apartment from south at west

    Jun 14, 2025 · Apt 3A

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective latch set at building entrance

    Sep 4, 2024

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west

    Sep 4, 2024 · Apt 2B

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 1b, 2nd story, 1st apartment from east at south

    May 1, 2024 · Apt 1B

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system boiler room locked at basement story at boiler room

    Apr 20, 2024

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 4c, 3rd story, 1st apartment from west at north

    Apr 20, 2024 · Apt 4C

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective vinyl tiles at floor in the kitchen located at apt 4c, 3rd story, 1st apartment from west at north

    Apr 20, 2024 · Apt 4C

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 1b, 1st story

    Mar 24, 2024 · Apt 1B

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 1st room from north located at apt 3c, 3rd story, 2nd apartment from south at west

    Mar 12, 2024 · Apt 3C

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroom located at apt 3c, 3rd story, 2nd apartment from south at west

    Mar 12, 2024 · Apt 3C

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the foyer located at apt 1b, 2nd story, 1st apartment from east at south

    Mar 5, 2024 · Apt 1B

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 1b, 2nd story, 1st apartment from east at south

    Mar 5, 2024 · Apt 1B

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1b, 2nd story, 1st apartment from east at south

    Mar 5, 2024 · Apt 1B

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 1b, 2nd story, 1st apartment from east at south

    Mar 5, 2024 · Apt 1B

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 1; in the entire apartment located at apt 3c, 3rd story, 2nd apartment from south at west

    Jan 16, 2024 · Apt 3C

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall in the 3rd room from north at west located at apt 1b, 2nd story, 1st apartment from east at south

    Jan 9, 2024 · Apt 1B

    Closed — Violation closed

DOB building violations · 3

  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 7, 1994

    Dob violation - dismissed

ECB violations · 18

  • Class - 2

    40,50a-e. (50)hot water heater is not direct into chimney above larger flue. (50a)right side boiler jacket not in place. (50b)hwh safety valve is defective. (50c)discharge pipe not copper. (50d)storage in boile

    Mar 5, 2018

    Resolve
  • Class - 2

    B254,50,50a,50b,50c,50d,50e,50f. 50-chimney to be sealed; 50a-water heater smoke pipe not fitted properly; 50b-water heater and boiler smoking pipe to be supported; 50c-pop safety discharge on boiler to short;

    Feb 6, 2013

    Resolve
  • Non-hazardous

    10a35. section leaking left side front. seal opening in front by oil burner

    Oct 29, 1999

    Resolve
  • Hazardous

    Occupancy contrary to that allowed by the certificate of occupancy or bldg dept records. cellar changed from storage & ordinary use to an apt. partitions erected and bath facilities have been installed.

    Aug 7, 1997

    Resolve
  • Hazardous

    Occupancy contrary to building dept records multiple dwelling walk up apt now occupied with partitions created in cellar for sleeping & living arrangements with 3 pc bathroom. remedy: discontinue illegal use fo

    Jun 9, 1997

    Resolve
  • Non-hazardous

    Work without a permit. work noted: partitions creating for sleeping & living accomodations. full 3 piece bathroom. remedy: obtain approvals & permits for above stated work if feasible or restore to prior legal

    Jun 9, 1997

    Resolve
  • Non-hazardous

    Fefusal of right of entry and inspectioin: superintendant of bldg refused entry to basement. remedy: permit access to premises for in- spection.

    Feb 2, 1990

    Resolve
  • Non-hazardous

    Work without a permit. closing up of 16 windows in basement: 11 with masonry and 5 with metal. remedy: obtain necessary permits or restorepremises to prior legal condition.

    Feb 2, 1990 · Penalty $250

    Resolve
  • Hazardous

    Failure to maintain. broken windows in a public stairwell between 1st and 4th fl at all location. remedy: make necessary repairs to thesatisfaction of this dept.

    Feb 2, 1990

    Resolve
  • Hazardous

    Failure to maintain. no protective screening under a skylight in a public stairwell. remedy: make all necessary repairs to the satis- faction of this dept.

    Feb 2, 1990 · Penalty $500

    Resolve
Show 8 more ↓
  • Hazardous

    Failure to maintain. metal flashing missing at front of bldg (north east corner) at top of parapet. remedy: make necessary repairs to thesatisfaction of this dept.

    Feb 2, 1990

    Resolve
  • Hazardous

    Failure to maintain. looose defective masonry at northeast corner at parapet and column. remedy: make necessary repairs to the satisfac- tion of this dept.

    Feb 2, 1990

    Resolve
  • Hazardous

    Failure to maintain. excessive erosion and vertical structural crack-ing (separation) of chimney at northwest corner of bldg. remedy: makenecessary repairs to the satisfaction of this dept.

    Feb 2, 1990 · Penalty $625

    Resolve
  • Hazardous

    Failure to maintain. loose copings at various areas of all parapet. remedy: make necessary repairs to the satisfaction of this dept.

    Feb 2, 1990 · Penalty $1,000

    Resolve
  • Hazardous

    Failure to maintain. metal flashing missing at southeast corner of roof at hip exposing wood framing. remedy: make necessary repairs to the satisfaction of this dept.

    Feb 2, 1990 · Penalty $625

    Resolve
  • Hazardous

    Failure to maintain. firerating missing at various locations in hall-way at wall areas in apt number a-4. remedy: make all necessary re- pairs to the satisfaction of this dept.

    Feb 2, 1990

    Resolve
  • Hazardous

    Failure to maintain. loose and defective masonary at top parapet front of building. remedy: make all necessary repairs to the satisfaction of this dept.

    Jan 11, 1990

    Resolve
  • Hazardous

    Failure to maintain. fire rating missing in bathroom at ceiling, left side of apartment number a-4 remedy: make necessary repairs to the satisfaction of this dept.

    Jan 11, 1990 · Penalty $500

    Resolve

Complaints

  • Plumbing

    Basin/sink

    Jul 14, 2026 · Apt 3D

    Close
  • Plumbing

    Bathtub/shower

    Jun 20, 2026 · Apt 3D

    Close
  • Plumbing

    Basin/sink

    Jun 20, 2026 · Apt 3D

    Close
  • Water leak

    Slow leak

    May 9, 2026 · Apt 2B

    Close
  • Paint/plaster

    Wall

    May 9, 2026 · Apt 2B

    Close
  • Water leak

    Damp spot

    Apr 24, 2026 · Apt 2B

    Close
  • Paint/plaster

    Wall

    Apr 24, 2026 · Apt 2B

    Close
  • Paint/plaster

    Door/frame

    Mar 9, 2026 · Apt 1A

    Close
  • Heat/hot water

    Entire building

    Feb 2, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Feb 1, 2026 · Apt 4C2B

    Close
Show 40 more ↓
  • Heat/hot water

    Apartment only

    Jan 31, 2026 · Apt 4C

    Close
  • Heat/hot water

    Apartment only

    Jan 31, 2026 · Apt 2B

    Close
  • Heat/hot water

    Entire building

    Jan 31, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 30, 2026 · Apt 4C

    Close
  • Heat/hot water

    Entire building

    Jan 30, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 30, 2026 · Apt 2B

    Close
  • Heat/hot water

    Entire building

    Jan 30, 2026 · Apt 4C

    Close
  • Heat/hot water

    Apartment only

    Jan 30, 2026 · Apt 3A

    Close
  • Heat/hot water

    Entire building

    Jan 30, 2026 · Apt 3A

    Close
  • Safety

    Smoke detector

    Jan 30, 2026 · Apt 3A

    Close
  • Safety

    Carbon monoxide detector

    Jan 30, 2026 · Apt 3A

    Close
  • Heat/hot water

    Entire building

    Jan 30, 2026 · Apt BLDG

    Close
  • Door/window

    Window frame

    Jan 30, 2026 · Apt 3A

    Close
  • Heat/hot water

    Entire building

    Nov 10, 2025 · Apt 4C

    Close
  • Water leak

    Heavy flow

    Oct 27, 2025 · Apt APT2B

    Close
  • Heat/hot water

    Entire building

    Oct 12, 2025 · Apt 4D

    Close
  • Heat/hot water

    Apartment only

    Jun 18, 2025 · Apt 4A

    Close
  • Heat/hot water

    Apartment only

    Jun 12, 2025 · Apt 3A

    Close
  • Paint/plaster

    Window/frame

    Jul 18, 2024 · Apt 2B

    Close
  • Paint/plaster

    Ceiling

    Jul 18, 2024 · Apt 2B

    Close
  • Heat/hot water

    Entire building

    Apr 18, 2024 · Apt 4C

    Close
  • Heat/hot water

    Entire building

    Apr 18, 2024 · Apt 4C

    Close
  • Flooring/stairs

    Floor

    Dec 20, 2023 · Apt 4C

    Close
  • Line of travel

    Line of travel

    Nov 20, 2023 · Apt BLDG

    Close
  • Line of travel

    Line of travel

    Nov 20, 2023 · Apt 3C

    Close
  • Line of travel

    Line of travel

    Nov 20, 2023 · Apt 1B

    Close
  • Flooring/stairs

    Floor

    Jul 21, 2023 · Apt 2B

    Close
  • Flooring/stairs

    Floor

    Jul 7, 2023 · Apt 2B

    Close
  • Unsanitary condition

    Pests

    Jul 7, 2023 · Apt 2B

    Close
  • Paint/plaster

    Wall

    Jul 7, 2023 · Apt 2B

    Close
  • Water leak

    Slow leak

    Jul 7, 2023 · Apt 2B

    Close
  • Unsanitary condition

    Pests

    Jul 7, 2023 · Apt 2B

    Close
  • Paint/plaster

    Ceiling

    Jul 7, 2023 · Apt 2B

    Close
  • Heat/hot water

    Entire building

    Apr 21, 2022 · Apt 4C

    Close
  • Water leak

    Slow leak

    Jun 10, 2021 · Apt 2B

    Close
  • Water leak

    Slow leak

    Mar 24, 2021 · Apt 1D

    Close
  • Water leak

    Slow leak

    Feb 28, 2021 · Apt 1D

    Close
  • Appliance

    Electric/gas range

    Feb 22, 2021 · Apt APT3B

    Close
  • Appliance

    Refrigerator

    Feb 22, 2021 · Apt APT3B

    Close
  • Door/window

    Door

    Dec 23, 2020 · Apt 4C

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1927
Floors
4
Residential units
16
Building area
13,140 ft²
Lot area
4,000 ft²
Zoning
R5A
Community board
403
Council district
21
Block / lot
1713 / 33
Assessed value
$382,050
Landmark / historic district
No

HPD registration #401900, last renewed Aug 19, 2025.

Questions about 33-54 99 Street

Who owns 33-54 99 Street?

The owner of record in NYC Department of City Planning PLUTO data is Kou, Law, Cohen LLC.

Does 33-54 99 Street have violations?

Yes. NYC HPD has recorded 117 housing violations at this property.

Is 33-54 99 Street rent stabilized?

NYC Department of Finance tax bills listed 14 rent-stabilized units here in 2024 (about 88% of its 16 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 33-54 99 Street built?

City records list 1927 as the year it was built.

How many apartments are in 33-54 99 Street?

It has 16 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.