25-94 28 Avenue
Queens, NY 11103BBL 4-00685-0001Map
Owner of record: 2594 42nd LLC
25-94 28 Avenue is a walk-up apartment building built in 1924 in Queens, 11103. It has 23 residential units across 4 floors. The owner of record is 2594 42nd LLC. HPD has recorded 116 housing violations here, most recently on July 29, 2026. 38 of the 50 most recent violations are still open. City tax records listed 23 rent-stabilized apartments here in 2024.
- HPD violations
- 116
- DOB violations
- 12
- ECB violations
- 12
- HPD complaints
- 141
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 116
- BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4, 1st story, 2nd apartment from west at north
Jul 29, 2026 · Apt 4
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the 4th room from east located at apt 4, 1st story, 2nd apartment from west at north
Jul 29, 2026 · Apt 4
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st riser from west at north wall in the kitchen located at apt 4, 1st story, 2nd apartment from west at north
Jul 29, 2026 · Apt 4
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door from east at south wall, 1st door frame from east at south wall in the foyer located at apt 4, 1st story, 2nd apartment from west at north
Jul 29, 2026 · Apt 4
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 4, 1st story, 2nd apartment from west at north
Jul 29, 2026 · Apt 4
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 1st room from east located at apt 4, 1st story, 2nd apartment from west at north
Jul 29, 2026 · Apt 4
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from north at east wall in the 4th room from east located at apt 4, 1st story, 2nd apartment from west at north
Jul 29, 2026 · Apt 4
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4, 1st story, 2nd apartment from west at north
Jul 29, 2026 · Apt 4
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective glass pane at lower sash window at north wall in the 1st room from east located at apt 4, 1st story, 2nd apartment from west at north
Jul 29, 2026 · Apt 4
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 4, 1st story, 2nd apartment from west at north
Jul 29, 2026 · Apt 4
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Properly repair or replace the broken or defective glass pane at upper sash window at north wall in the bathroom located at apt 4, 1st story, 2nd apartment from west at north
Jul 29, 2026 · Apt 4
Closed — Violation closed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet . in the bathroom located at apt 4, 1st story, 2nd apartment from west at north
Jul 29, 2026 · Apt 4
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at apartment entrance door in the entrance located at apt 4, 1st story, 2nd apartment from west at north
Jul 29, 2026 · Apt 4
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electric wires at west wall in the kitchen located at apt 4, 1st story, 2nd apartment from west at north
Jul 29, 2026 · Apt 4
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 4, 1st story, 2nd apartment from west at north
Jul 29, 2026 · Apt 4
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective mortise lock at door in the entrance located at apt 4, 1st story, 2nd apartment from west at north
Jul 14, 2026 · Apt 4
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in drain pipe at wash basin in the bathroom located at apt 4, 1st story, 2nd apartment from west at north
Jul 14, 2026 · Apt 4
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective upper sash, inner and outer glass pane at 1st window from west at north wall in the bathroom located at apt 4, 1st story, 2nd apartment from west at north
Jul 14, 2026 · Apt 4
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4, 1st story, 2nd apartment from west at north
Jul 14, 2026 · Apt 4
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4, 1st story, 2nd apartment from west at north
Jul 14, 2026 · Apt 4
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective locking device at vestibule door , 1st story
Jul 14, 2026
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 21, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective closer arm at street entrance door to building
Jun 8, 2025
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of plexiglass installed instead of plain glass at entrance door to building
Jun 8, 2025
Open — Invalid certification - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 12, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 3, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 3, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 14, 2021
Closed — Violation dismissed - CImmediately hazardous
Properly repair the broken or defective locking device at entrance door bldg
Sep 14, 2016
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color window frame in the kitchen located at apt 16, 3rd story
Sep 14, 2016 · Apt 16
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors entrance door located at apt 16, 3rd story, 1st apartment from north at east
Sep 14, 2016 · Apt 16
Open — Nov sent out - BHazardous
Replace with new the missing door at closet in the 1st room from north located at apt 16, 3rd story, 1st apartment from north at east
Sep 14, 2016 · Apt 16
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice located at apt 16, 3rd story, 1st apartment from north at east
Sep 14, 2016 · Apt 16
Open — Nov sent out - BHazardous
Abate the nuisance consisting of roaches located at apt 16, 3rd story, 1st apartment from north at east
Sep 14, 2016 · Apt 16
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 16, 3rd story, 1st apartment from north at east
Sep 14, 2016 · Apt 16
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 16, 3rd story, 1st apartment from north at east
Jul 25, 2016 · Apt 16
Open — Nov sent out - BHazardous
Repair or replace the smoke detector which is defective. in the entire apartment located at apt 16, 3rd story, 1st apartment from north at east
Jul 25, 2016 · Apt 16
Open — Nov sent out - BHazardous
Properly repair the broken or defective lower sash fire escape window. located at apt 16, 3rd story, 1st apartment from north at east
Jul 25, 2016 · Apt 16
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tile wall. in the bathroom located at apt 16, 3rd story, 1st apartment from north at east
Jul 25, 2016 · Apt 16
Open — Nov sent out - ANon-hazardous
Replace with new the missing closet doors. in the 1st bedroom from north located at apt 16, 3rd story, 1st apartment from north at east
Jul 25, 2016 · Apt 16
Open — Nov sent out - BHazardous
Properly repair the broken or defective lower window sash. in the kitchen located at apt 16, 3rd story, 1st apartment from north at east
Jul 25, 2016 · Apt 16
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling. in the bathroom located at apt 16, 3rd story, 1st apartment from north at east
Jul 25, 2016 · Apt 16
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling. in the bathroom located at apt 16, 3rd story, 1st apartment from north at east
Jul 25, 2016 · Apt 16
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... mold and mildew ceiling in the bathroom located at apt 16, 3rd story, 1st apartment from north at east
Jul 25, 2016 · Apt 16
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the foyer located at apt 15, 4th story
Dec 9, 2015 · Apt 15
Open — Nov sent out - ANon-hazardous
Replace with new the missing control knobs at gas range in the kitchen located at apt 15, 4th story
Dec 9, 2015 · Apt 15
Open — Nov sent out - BHazardous
Properly repair the broken or defective bell and buzzer sysytem. in the entire apartment located at apt 15, 4th story
Dec 9, 2015 · Apt 15
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the 1st room from north located at apt 15, 4th story
Dec 9, 2015 · Apt 15
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 14, 2015
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation riser in the bathroom located at apt 23, 4th story, 2nd apartment from north at east
Jun 1, 2015 · Apt 23
Open — Nov sent out
DOB building violations · 12
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 22, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 9, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 16, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 16, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - active - Facade facade optional
Ll1080-local law 10/80 - facade facade optional
Jul 1, 1997
Dob violation - dismissed
Show 2 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - active
ECB violations · 12
- Class - 3
Curb cut created on sidewalk approximately 15 linear feet length at right front side of the building on 42 street. no permit on file with the d o b. ecb summons issued., obtain permit or restore premises to pri
May 17, 2021 · Penalty $500
Active - Class - 2
Failure to comply with the commissioners order contained in summons/violation #35415519z issued on 04/13/19 and to file a certificate of correction pursuant t 28-201.1 and 1rcny 102-01.failure to provide unobst
Jun 15, 2019 · Penalty $1,250
Resolve - Class - 2
Work without permit.at exp #4 created illegal curb cut approx 10'l photo taken.rem:obtain permit
Jun 15, 2019
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35375649n issued on 02-12-19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. illegal curb cut created ework w/o permit. remedy: comply w/com
Jun 15, 2019 · Penalty $1,250
Active - Class - 2
B 254 found weil mc lain oil fired boiler not registered register the boiler and submit a certificate of correction
May 24, 2019 · Penalty $625
Active - Class - 1
B 101 work without permit, found weil mc lain oil fired boiler installed without a permit. , obtain permit; obtain proper permit and submit a certificate of correction
May 24, 2019 · Penalty $2,500
Active - Class - 1
Failure to provide unobstructed exit passageway. noted:at exp 4 fire escape 1 black honda pilot plate#n.y. cvh-8487 parked at emergency exitpassageway obstructing emergency egress/exit. also noted at exp 4 fire
Apr 13, 2019 · Penalty $1,563
Active - Class - 1
Work w/o a permit. noted:illegal curb cut create for illegal park in fire passageway that causes obstruction of egress from building time ofinspection black vehicle is parked in passageway. remedy:obtain permit
Feb 12, 2019 · Penalty $1,250
Active - Class - 2
Failure to maintain building wall(s) or appurtenances. noted:retainingwall at exposure 4 has a slightly bulge along the wall that some of the concrete is delaminating from the retaining wall that can deteriorat
Feb 12, 2019 · Penalty $625
Active - Class - 1
Failure to provide unobstructed exit passageway. noted:fire escape at exposure 4 vehicle is parked in fire passageway. that is obstructing egress from building and emergency use. the vehicle is gated in and pad
Feb 12, 2019 · Penalty $1,250
Active
Show 2 more ↓
- Class - 2
Occupancy contrary to that allowed by the c of o or bldg dept records.records indicate 23 units w/storage,boiler & meters in cellar. at timeof inspection observed sleeping quarters,3pc vacate entire cellar.
Jan 14, 2014 · Penalty $1,200
Active - Class - 2
Work w/o a permit. work noted: at cellar level erected partitions creating sleeping area & bathroom enclosure. installed waste & warter lines for 3pc bathroom (shower,toilet,sink),washer & residential sink.
Jan 14, 2014 · Penalty $800
Active
Complaints
- Door/window
Window pane
Oct 23, 2026 · Apt APT41F
Open - Plumbing
Toilet
Oct 23, 2026 · Apt APT41F
Open - Appliance
Electric/gas range
Oct 23, 2026 · Apt APT41F
Open - Heat/hot water
Apartment only
Oct 23, 2026 · Apt APT41S
Open - Door/window
Window pane
Oct 14, 2026 · Apt 4
Open - Door/window
Window pane
Oct 3, 2026 · Apt 4
Open - Electric
Wiring
Jul 22, 2026 · Apt 4
Close - Door/window
Door
Jul 22, 2026 · Apt 4
Close - Plumbing
Basin/sink
Jul 22, 2026 · Apt 4
Close - Door/window
Window pane
Jul 14, 2026 · Apt 4
Close
Show 40 more ↓
- Plumbing
Basin/sink
Jul 14, 2026 · Apt 4
Close - Door/window
Door
Jul 14, 2026 · Apt 4
Close - Plumbing
Toilet
Jul 14, 2026 · Apt 4
Close - Door/window
Door
Apr 3, 2026 · Apt APT4
Close - Heat/hot water
Apartment only
Jun 6, 2025 · Apt 17
Close - Unsanitary condition
Pests
Jun 13, 2023 · Apt 11
Close - Heat/hot water
Entire building
Dec 12, 2019 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 11, 2019 · Apt 2
Close - Heat/hot water
Apartment only
Dec 11, 2019 · Apt 2
Close - Plumbing
Water supply
Dec 11, 2019 · Apt 2
Close - Heat/hot water
Apartment only
Dec 11, 2019 · Apt 2
Close - Appliance
Refrigerator
Feb 5, 2019 · Apt 19
Close - Heat/hot water
Entire building
Nov 15, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 11, 2018 · Apt 11
Close - Heat/hot water
Apartment only
Jan 4, 2018 · Apt 9
Close - Heat/hot water
Apartment only
Dec 28, 2017 · Apt 9
Close - Water leak
Heavy flow
Nov 6, 2017 · Apt 9
Close - Unsanitary condition
Garbage/recycling storage
Aug 24, 2017 · Apt BLDG
Close - Appliance
Electric/gas range
Apr 27, 2017 · Apt 10
Close - General
Cooking gas
Apr 27, 2017 · Apt 10
Close - General
Cooking gas
Apr 25, 2017 · Apt 10
Close - Door/window
Door
Sep 13, 2016 · Apt 16
Close - Safety
Carbon monoxide detector
Sep 13, 2016 · Apt 16
Close - Electric
Wiring
Sep 13, 2016 · Apt 16
Close - Unsanitary condition
Pests
Sep 13, 2016 · Apt 16
Close - Unsanitary condition
Pests
Sep 13, 2016 · Apt 16
Close - Paint/plaster
Ceiling
Sep 13, 2016 · Apt 16
Close - Unsanitary condition
Mold
Jul 10, 2016 · Apt 16
Close - Water leak
Heavy flow
Jul 10, 2016 · Apt 16
Close - Heat/hot water
Apartment only
Mar 22, 2016 · Apt 15
Close - Door/window
Door
Mar 6, 2016 · Apt BLDG
Close - Unsanitary condition
Mold
Mar 6, 2016 · Apt 16
Close - Water leak
Slow leak
Mar 6, 2016 · Apt 16
Close - Door/window
Window frame
Mar 6, 2016 · Apt 16
Close - Door/window
Window frame
Mar 6, 2016 · Apt 16
Close - Heat/hot water
Entire building
Feb 19, 2016 · Apt 4
Close - Unsanitary condition
Pests
Dec 29, 2015 · Apt 12A
Close - Heat/hot water
Apartment only
Dec 7, 2015 · Apt 15
Close - Appliance
Electric/gas range
Dec 7, 2015 · Apt 15
Close - Paint/plaster
Ceiling
Dec 7, 2015 · Apt 15
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1924
- Floors
- 4
- Residential units
- 23
- Building area
- 17,440 ft²
- Lot area
- 5,000 ft²
- Zoning
- R6A
- Community board
- 401
- Council district
- 22
- Block / lot
- 685 / 1
- Assessed value
- $706,050
- Landmark / historic district
- No
HPD registration #404112, last renewed Jul 28, 2026.
Questions about 25-94 28 Avenue
Who owns 25-94 28 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 2594 42nd LLC.
Does 25-94 28 Avenue have violations?
Yes. NYC HPD has recorded 116 housing violations at this property.
Is 25-94 28 Avenue rent stabilized?
NYC Department of Finance tax bills listed 23 rent-stabilized units here in 2024 (about 100% of its 23 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 25-94 28 Avenue built?
City records list 1924 as the year it was built.
How many apartments are in 25-94 28 Avenue?
It has 23 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.