2661 Ocean Parkway
Brooklyn, NY 11235BBL 3-07239-0001Map
Owner of record: NYC Health And Hospitals Corporation
2661 Ocean Parkway is a hospital / health built in 1931 in Brooklyn, 11235. The owner of record is NYC Health And Hospitals Corporation. HPD has recorded 8 housing violations here, most recently on September 21, 2010. 8 of the 8 most recent violations are still open.
- HPD violations
- 8
- DOB violations
- 240
- ECB violations
- 107
- HPD complaints
- 5
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. The newest 10 per agency here; the full lists are a click away.
HPD housing violations · 8
- BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at north wall underneth of base cabinets in the kitchen located at apt 1, 1st story
Sep 21, 2010 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective connection at sink waste line in the kitchen located at apt 1, 1st story
Sep 21, 2010 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective reglaze bath/tub in the bathroom located at apt 1, 1st story
Sep 21, 2010 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at east and south wall in the bathroom located at apt 1, 1st story
Sep 21, 2010 · Apt 1
Open — Nov sent out - ANon-hazardous
Properly secure the loose electrical outlet at east wall in the 1st room from north located at apt 1, 1st story
Sep 21, 2010 · Apt 1
Open — Nov sent out - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 1, 1st story
Sep 21, 2010 · Apt 1
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 1, 1st story
Sep 21, 2010 · Apt 1
Open — Nov sent out - CImmediately hazardous
Replace with new the broken or defective entrance door glass pane located at apt 1, 1st story
Sep 21, 2010 · Apt 1
Open — Nov sent out
DOB building violations · 240
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2024 internal hgh pressure inspection
Nov 14, 2025
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2024 internal hgh pressure inspection
Nov 14, 2025
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2024 internal hgh pressure inspection
Nov 14, 2025
Dob violation - dismissed
ECB violations · 107
- Class - 2
Failure to file acceptable amended cycle 7a, 8a, and 9a report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #910295. remedy: file acceptable re
Jan 16, 2024 · Penalty $1,250
Active - Class - 2
Failure to submit acceptable required cycle 9a report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control #910295.remedy:submit acceptable required te
Dec 2, 2022 · Penalty $1,250
Resolve - Class - 1
I observed active construction site with de-watering system at exp.#2 and sanitary sewer system in the process of excavation, which was not reflecting on site safety plan. failure to adjust site safety plan to
Jul 29, 2022 · Penalty $625
Resolve - Class - 2
I observed concrete barrier on street at exp.#3 and 5 feet minimum pedestrian walk way were not maintain. failure to maintain 5 feet pedestrian walk way creates a hazardous condition for pedestrian and vehicle
Jul 29, 2022
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendments-at the time of an inspection of an active jobsite upon reviewing pipe scaffold drawing#b00622503 observed following objections
Jan 14, 2022
Resolve - Class - 2
Failure to comply with dot regulation as per 34rcny-2005 and admin code.provistions 19-107.-108 19-121.at time of inspection of a 10 story new hospital building for coney island hospital.i observed pedestrian w
Jun 3, 2021
Resolve - Class - 2
Failure to provide approved/accepted plans at jobsite at time of inspection. premises under job#321251578 at time of inspection. unable to do inspection. failure to provide approved plans of inspection. remedy:
Sep 22, 2020 · Penalty $625
Resolve - Class - 1
Turner construction failed to provide safegaurds for worker using scissor lift causing crane to hit scissor lift as the crane swung .which caused major damage to the scissorlift, safeguard public and property;
Sep 17, 2020 · Penalty $625
Resolve - Class - 1
Steamfitter eugene clarke while using scissor lift to get on top of cooling tower on the roof failed to retract scissor lift and keep it out of the tower crane swing path causing crane to hit scissor lift ., sa
Sep 17, 2020
Resolve - Class - 1
Crane user stonebridge steel erection user of tower crane cd#3690 cn#1332/18 failed to have safeguards in place to protect workers&equipmentin place. tower crane swung and hit scissorlift causing severe damage
Sep 17, 2020
Resolve
Complaints
- Electric
Wiring
Sep 15, 2010 · Apt 1
Close - Nonconst
Vermin
Sep 15, 2010 · Apt 1
Close - General
Doors
Sep 15, 2010 · Apt 1
Close - General
Floor
Sep 15, 2010 · Apt 1
Close - Paint/plaster
Wall
Sep 15, 2010 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Hospital / health (I1)
- Year built
- 1931
- Floors
- 14
- Residential units
- —
- Building area
- 1,085,103 ft²
- Lot area
- 455,333 ft²
- Zoning
- R4
- Community board
- 313
- Council district
- 48
- Block / lot
- 7239 / 1
- Assessed value
- $127,909,350
- Landmark / historic district
- No
Questions about 2661 Ocean Parkway
Who owns 2661 Ocean Parkway?
The owner of record in NYC Department of City Planning PLUTO data is NYC Health And Hospitals Corporation.
Does 2661 Ocean Parkway have violations?
Yes. NYC HPD has recorded 8 housing violations at this property.
Is 2661 Ocean Parkway rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2661 Ocean Parkway built?
City records list 1931 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.