roofy

Violations at 2661 Ocean Parkway

Brooklyn, NY 11235 · BBL 3-07239-0001 · Back to the property

HPD housing violations

8 HPD violations, newest first.

  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color at north wall underneth of base cabinets in the kitchen located at apt 1, 1st story

    Sep 21, 2010 · Apt 1

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective connection at sink waste line in the kitchen located at apt 1, 1st story

    Sep 21, 2010 · Apt 1

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective reglaze bath/tub in the bathroom located at apt 1, 1st story

    Sep 21, 2010 · Apt 1

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective ceramic tiles at east and south wall in the bathroom located at apt 1, 1st story

    Sep 21, 2010 · Apt 1

    Open — Nov sent out
  • ANon-hazardous

    Properly secure the loose electrical outlet at east wall in the 1st room from north located at apt 1, 1st story

    Sep 21, 2010 · Apt 1

    Open — Nov sent out
  • BHazardous

    Abate the nuisance consisting of roaches in the entire apartment located at apt 1, 1st story

    Sep 21, 2010 · Apt 1

    Open — Nov sent out
  • BHazardous

    Abate the nuisance consisting of mice in the entire apartment located at apt 1, 1st story

    Sep 21, 2010 · Apt 1

    Open — Nov sent out
  • CImmediately hazardous

    Replace with new the broken or defective entrance door glass pane located at apt 1, 1st story

    Sep 21, 2010 · Apt 1

    Open — Nov sent out

DOB building violations

The newest 50 of 240 DOB violations. The city keeps the complete history.

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 internal hgh pressure inspection

    Nov 14, 2025

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 internal hgh pressure inspection

    Nov 14, 2025

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 internal hgh pressure inspection

    Nov 14, 2025

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 internal hgh pressure inspection

    Nov 14, 2025

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 internal hgh pressure inspection

    Nov 14, 2025

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 internal hgh pressure inspection

    Nov 14, 2025

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued-failure to file 2023 internal hgh pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued-failure to file 2023 internal hgh pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued-failure to file 2023 internal hgh pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued-failure to file 2023 external hgh pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued-failure to file 2023 external hgh pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • High pressure boiler boiler required

    Violation issued-failure to file 2023 external hgh pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • Hazardous condition (facade) facade required

    Cycle 9a unsafe report filed

    Dec 6, 2022

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 6, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 6, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 6, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 6, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 6, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 6, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 6, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 6, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 6, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 6, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 6, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 6, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 6, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 6, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 1, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 1, 2020

    Dob violation - resolved

ECB violations

The newest 50 of 107 ECB violations. The city keeps the complete history.

  • Class - 2

    Failure to file acceptable amended cycle 7a, 8a, and 9a report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #910295. remedy: file acceptable re

    Jan 16, 2024 · Penalty $1,250

    Active
  • Class - 2

    Failure to submit acceptable required cycle 9a report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control #910295.remedy:submit acceptable required te

    Dec 2, 2022 · Penalty $1,250

    Resolve
  • Class - 1

    I observed active construction site with de-watering system at exp.#2 and sanitary sewer system in the process of excavation, which was not reflecting on site safety plan. failure to adjust site safety plan to

    Jul 29, 2022 · Penalty $625

    Resolve
  • Class - 2

    I observed concrete barrier on street at exp.#3 and 5 feet minimum pedestrian walk way were not maintain. failure to maintain 5 feet pedestrian walk way creates a hazardous condition for pedestrian and vehicle

    Jul 29, 2022

    Resolve
  • Class - 2

    Work does not conform to approved construction documents and/or approved amendments-at the time of an inspection of an active jobsite upon reviewing pipe scaffold drawing#b00622503 observed following objections

    Jan 14, 2022

    Resolve
  • Class - 2

    Failure to comply with dot regulation as per 34rcny-2005 and admin code.provistions 19-107.-108 19-121.at time of inspection of a 10 story new hospital building for coney island hospital.i observed pedestrian w

    Jun 3, 2021

    Resolve
  • Class - 2

    Failure to provide approved/accepted plans at jobsite at time of inspection. premises under job#321251578 at time of inspection. unable to do inspection. failure to provide approved plans of inspection. remedy:

    Sep 22, 2020 · Penalty $625

    Resolve
  • Class - 1

    Turner construction failed to provide safegaurds for worker using scissor lift causing crane to hit scissor lift as the crane swung .which caused major damage to the scissorlift, safeguard public and property;

    Sep 17, 2020 · Penalty $625

    Resolve
  • Class - 1

    Steamfitter eugene clarke while using scissor lift to get on top of cooling tower on the roof failed to retract scissor lift and keep it out of the tower crane swing path causing crane to hit scissor lift ., sa

    Sep 17, 2020

    Resolve
  • Class - 1

    Crane user stonebridge steel erection user of tower crane cd#3690 cn#1332/18 failed to have safeguards in place to protect workers&equipmentin place. tower crane swung and hit scissorlift causing severe damage

    Sep 17, 2020

    Resolve
  • Class - 1

    Unsafe storage. at the time of inspection of an active jobsite observed,improper materials storage consisting of construction materials & steel pipes within 10 feet of leading edge at level 6,5,4,storage of

    Aug 17, 2020 · Penalty $625

    Resolve
  • Class - 1

    Failure to safeguard all persons & property. at the time of inspectionof an active jobsite observed,at level 2 exp#4 adjacent property windws glass & facade glass.(cladding)are not protected,failure to provide

    Aug 17, 2020 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to safeguard person & property. at the time of inspection of 10 sty new bldg observed,at exp#4 there was parking lot at 4 cars were parking w/o protection,construction work in progress w/o providing pro

    Aug 17, 2020 · Penalty $625

    Resolve
  • Class - 1

    Failure to safeguard all person affected by construction operations. at time of inspection at 10 sty bldg observed,construction work in progress & there were no safety measures in place surround the elevator sh

    Aug 17, 2020

    Resolve
  • Class - 1

    Sec. bc3308.5 violation details: netting. at the time of inspection ofa new bldg under construction observed inadequate netting on guardrails & vertical netting had large opening & gaps throughout the perimeter

    Aug 17, 2020 · Penalty $625

    Resolve
  • Class - 1

    Sec. bc3304.7 required means of egress. at the time of inspection of an active jobsite,observed at roof level there were two staircases blocked/closed by tarp sheet & scaffold creating hazard condition of safe

    Aug 17, 2020 · Penalty $625

    Resolve
  • Class - 1

    Inadequate guardrails(missing)note:at time of inspection of a 10 storynb active job site observed one worker working on mezzanine lvl on topof the roof with missing guard rails and no ppe this create a falling

    Aug 7, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Manufacturer specification.note:at time of inspection of a 10 stry bldg active job site i observed 2 workers on a scissors lift approximately 15-20 ft in height bldg a platform when i asked for certificate of u

    Aug 7, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Sec. bc 3308.5 vertical netting. at the time of inspection of 10 sty nb active site observed ongoing work above 7th fl w/vertical netting missing in several locations from 7th to 10th floors,not attached to zer

    Jul 29, 2020 · Penalty $2,500

    Resolve
  • Class - 2

    Sec. 3301.2 safety measures uncapped rebars. at the time of inspectionof 10 sty nb active site i observed exposed bended rebar on the penthouse level. the rebar was not capped,no cautious tape or barricades wer

    Jul 29, 2020

    Resolve
  • Class - 1

    Sec. 3308.5 vertical netting system. at the time of inspection of a 10sty nb observed that no vertical safety netting system provided on a 5th sty level. concrete has been poured & no vertical safety netting

    Mar 24, 2020 · Penalty $2,500

    Resolve
  • Class - 2

    Pedstrian protection does not meet code specification.at time of inspection on a active jobsite a 10 story currently super structures observed sidewalk shed at exp#2 was no build as per code sidewalk shed missi

    Dec 13, 2019 · Penalty $1,250

    Resolve
  • Class - 2

    Bc28-110.1/minimu content-safety plan-roof protection(inadequate site safety plan-missing detail for vents and skylight protection)note:at time of inspection of a new 10 story building construction in progress

    Dec 13, 2019 · Penalty $625

    Resolve
  • Class - 1

    Bc3309.10/inadequate roof protection.at time of inspection on a active10 story nb,currently 5 fl,observed that exp#4 roof protection for vents and skylights was missing.failure to provide adequate roof protecti

    Dec 13, 2019 · Penalty $625

    Resolve
  • Class - 1

    Bc330315-failure to perform proper concrete washout water procedures.at the time of inspeciton of a 10 story nb currently at 4th story,observed concrete operations in progress at exp#1 and no washout box was on

    Dec 5, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    Bc33087-failure to provide guardrail system.at the time of inspection of a 10 story nb currently at 4th floor level.i observed inadequate and/or no guardrail system installed to protect all unenclosed perimeter

    Dec 5, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    Bc330914-protection of windows.at the time of inspection of 10 story nb currently at 4 story level i observed unprotected windows of adjacent property at exp#4.unprotected windows are within approx. 5 feet dist

    Dec 5, 2019 · Penalty $2,500

    Resolve
  • Class - 2

    Temporary construction equipment on site-expired permit.at the time ofinspetion of a 10 story nb currently at 4 story level,i observed sidewalk shed at exp#2.upon review of department records it was observed th

    Dec 5, 2019 · Penalty $625

    Resolve
  • Class - 1

    Sec. 3309.14 protection of windows. note: at the time of inspection ofa purposed 10 sty nb in progress i observed in grade level there was missing window protection to occupied bldg(coney island hospital). this

    Aug 20, 2019 · Penalty $625

    Resolve
  • Class - 1

    Failure to maintain adequate housekeeping per section requirements. note: at the time of inspection of a purposed(10)sty nb in progress,i observed inadequate housekeeping on site(rebar was blocking means of egr

    Aug 20, 2019 · Penalty $1,250

    Resolve
  • Class - 1

    Sec. 3301.2 failure to institute & maintain safety equipment measures or temporary construction. note: at the time of my inspection of a purposed 10 sty nb in progress,i observed exposed rebar as i was walking

    Aug 20, 2019 · Penalty $625

    Resolve
  • Class - 2

    Sec. 3314.1 at time of a purposed 10 sty nb in progress,upon my inspection i oberved a scaffold system set up on a concrete forming system that was not as per code. 1)plank were not secured 2)missing toeboards

    Aug 20, 2019

    Resolve
  • Class - 1

    Sec. 3301.2 failure to institute/maintain safety equipment measures or temporary consruction-uncovered holes gaps on floor slab. note: at time of inspection of a 10 sty new bldg under construction,active jobsit

    Aug 7, 2019 · Penalty $625

    Resolve
  • Class - 2

    Failure to safeguard all persons & property affected by construction operations-uncapped rebars. note: at time of inspection of a 10 sty new bldg under construction,active job site w/62 workers approx of variou

    Aug 7, 2019 · Penalty $625

    Resolve
  • Class - 1

    Failure to notify the dept prior to commencement of earthwork. at the time of responding to an incident at an active construction site of a 10story new building in the foundation phase i observed the contractor

    May 4, 2019

    Resolve
  • Class - 1

    Failure to designate concrete safety manager. at the time of respond ing to an incident at an active construction site of a 10 story new building i observed the csm on the pwz mark hebert was not on site. i

    May 4, 2019

    Resolve
  • Class - 1

    Concrete safety manager failed to perform duties at the time of responding to an incident on an active construction site of a 10 story new building. observed no concrete safety manager logbook on site. i requ

    May 4, 2019

    Resolve
  • Class - 1

    3301.2 failure to maintain safety measures. at the time of inspectionat a 10story new building in the foundation phase i reported to an incident where it was stated by the ssm and foreman on site that a worker

    May 4, 2019

    Resolve
  • Class - 2

    Failure to file acceptable amended cycle 8a report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control# 810295. rmdy: file acceptable report

    Aug 1, 2018

    Active
  • Class - 1

    Failure to immediately notify the dept of an accident at construction /demolition site. contractor failed to notify the dob of an accident in a timely fashion manner,accident happened saturday morning 3-11-17 @

    Mar 13, 2017 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by construction operations. contractor failure to shore the ductwork during the demolistion operations,workers was hit & he was taked to hospital contractor

    Mar 13, 2017

    Resolve
  • Class - 2

    Failure to file acceptable amended report indicating correction of un safe conditions described in initial local law 11/98 report. rmdy: file acceptable amended report.

    Nov 7, 2016

    Resolve
  • Class - 2

    Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat

    Dec 2, 2014

    Resolve
  • Class - 2

    Failure to comply w/the commissioner's order to file a certificate of correction w/the dept of bldgs. noted: respondent failed to correct the violating conditions & file a certificate of correction pursuant to

    Mar 2, 2011

    Active
  • Class - 2

    Occupancy contrary to that allowed by the cert of occupancy.cert of occupancy 81492 states use as nurses home.current occupancy is business office.change of use.nurses home(use group#3,offices use group#6).disc

    Jan 11, 2011

    Active
  • Class - 2

    Altered/changed bldg occupied w/o a valid cert of occupancy.cert of occupancy for 301352373t004 (called tower)has expired on 9/3/06.rem:obtain valid cert of occupancy &/or discontinue illegal occupancy.

    Jan 11, 2011

    Active
  • Class - 1

    Failure to maintain bldg exterior wall defeat noted at exp#1 2 3 step cracks in brick veener exp3 at parapet walls horizontal vertical cracks throughout brick bulging above 2nd story windows vertical cracks bel

    Jul 24, 2010

    Active
  • Non-hazardous

    Failure to submit a fifth round technical report in compliance w/code provisions:periodic inspection of exterior walls & appurtenances as required by local law 11 of 1998 and the dept of bldg rules & regulation

    Apr 11, 2008

    Resolve
  • Non-hazardous

    Failure to submit a 5th round technical report in compliance w/code provisions: periodic inspection of exterior walls & appurtenances as required by local law 11 of 1998 & the dob's rules & regulations. remedy:

    Jan 25, 2008

    Resolve
  • Non-hazardous

    Failure to submit a 5 round technical rwport in compliance with provisions:periodic insp of exterior walls & appurtenances as required by local law 11/98 & the dob rules & regulations

    Aug 18, 2006

    Resolve