8517 3 Avenue
Brooklyn, NY 11209BBL 3-06034-0001Map
Owner of record: 309 86th St Realty Corp
8517 3 Avenue is a walk-up apartment building built in 1927 in Brooklyn, 11209. It has 40 residential units across 4 floors. The owner of record is 309 86th St Realty Corp. HPD has recorded 1,161 housing violations here, most recently on August 23, 2026. 48 of the 50 most recent violations are still open. City tax records listed 42 rent-stabilized apartments here in 2024.
- HPD violations
- 1,161
- DOB violations
- 41
- ECB violations
- 14
- HPD complaints
- 1,188
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1,161
- CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 4th room from north located at apt c1, 3rd story, 1st apartment from east at south
Aug 23, 2026 · Apt C1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the kitchen located at apt c1, 3rd story, 1st apartment from east at south
Aug 23, 2026 · Apt C1
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt c1, 3rd story, 1st apartment from east at south
Aug 23, 2026 · Apt C1
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from west at north wall, 1st door from west at north wall in the 4th room from north located at apt c1, 3rd story, 1st apartment from east at south
Aug 23, 2026 · Apt C1
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling ceiling in the bathroom located at apt c1, 3rd story, 1st apartment from east at south
Aug 23, 2026 · Apt C1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from west at north wall in the 4th room from north located at apt c1, 3rd story, 1st apartment from east at south
Aug 23, 2026 · Apt C1
Open — Nov sent out - BHazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods at north stack at center court yard
Aug 7, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective lower sash spring balance at window in the 3rd room from north located at apt c11, 3rd story, 1st apartment from south at west , section at north
Aug 7, 2026 · Apt C11
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt c11, 3rd story, 1st apartment from south at west , section at north
Aug 7, 2026 · Apt C11
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective base cabinet in kitchen in the kitchen located at apt c11, 3rd story, 1st apartment from south at west , section at north
Aug 7, 2026 · Apt C11
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Properly repair or replace the broken or defective spring balance, lower sash at window in the kitchen located at apt c11, 3rd story, 1st apartment from south at west , section at north
Aug 7, 2026 · Apt C11
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective glass pane lower sash in the kitchen located at apt c11, 3rd story, 1st apartment from south at west , section at north
Aug 7, 2026 · Apt C11
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the kitchen located at apt c11, 3rd story, 1st apartment from south at west , section at north
Aug 7, 2026 · Apt C11
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt c11, 3rd story, 1st apartment from south at west , section at north
Aug 7, 2026 · Apt C11
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt c11, 3rd story, 1st apartment from south at west , section at north
Aug 7, 2026 · Apt C11
Open — Notice of issuance sent to tenant - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the kitchen located at apt c1, 3rd story, 1st apartment from north at east , section at south
Jul 24, 2026 · Apt C1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 1st room from east, the foyer located at apt c1, 3rd story, 1st apartment from north at east , section at south
Jul 24, 2026 · Apt C1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt c1, 3rd story, 1st apartment from north at east , section at south
Jul 24, 2026 · Apt C1
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt c1, 3rd story, 1st apartment from north at east , section at south
Jul 24, 2026 · Apt C1
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a notice, written in english and in spanish, on the building entrance door or other conspicuous location in the building common area, stating that: (1) the building is in the alternative enforcement program, (2) that occupants may call 311 or the aep at 212-863-8262 to report housing maintenance complaints, (3) the name, telephone, and address of the owner, and, (4) the identity of any financial institution that holds a mortgage on the property. post
Feb 4, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective bell, buzzer and return intercom system from building front entrance to in the entrance located at apt c12, 3rd story, 1st apartment from south at west
Dec 13, 2025 · Apt C12
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective bell, buzzer and return intercom system from building front entrance to in the entire apartment located at apt c7, 3rd story, 2nd apartment from north at east
Dec 12, 2025 · Apt C7
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt c7, 3rd story, 2nd apartment from north at east
Dec 12, 2025 · Apt C7
Open — Notice of issuance sent to tenant - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east located at apt c7, 3rd story, 2nd apartment from north at east
Dec 12, 2025 · Apt C7
Open — Nov sent out - CImmediately hazardous
Replace the broken or defective watercloset in the bathroom located at apt c7, 3rd story, 2nd apartment from north at east
Dec 12, 2025 · Apt C7
Open — Nov sent out - CImmediately hazardous
Remove all obstructions and repair all defects in wastepipe at wash basin in the bathroom located at apt c7, 3rd story, 2nd apartment from north at east
Dec 12, 2025 · Apt C7
Open — Nov sent out - CImmediately hazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt c7, 3rd story, 2nd apartment from north at east , section ''north ''
Dec 12, 2025 · Apt C7
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of refrigerator with door intact at court yard, 1st story
Dec 3, 2025
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt c7, 3rd story, 2nd apartment from north at east
Nov 6, 2025 · Apt C7
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt b11, 2nd story, 1st apartment from south at west
Nov 6, 2025 · Apt B11
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt d2, 4th story, 2nd apartment from north at east
Nov 6, 2025 · Apt D2
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt c5, 3rd story, 2nd apartment from south at west , section ''8517'', 2nd from west at north
Nov 6, 2025 · Apt C5
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt c2, 3rd story, 2nd apartment from north at east
Nov 6, 2025 · Apt C2
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt b3, 2nd story, 1st apartment from east at south
Nov 6, 2025 · Apt B3
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt a1, 1st story, 3rd apartment from north at east
Nov 6, 2025 · Apt A1
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt d5, 2nd story, 2nd apartment from south at west
Nov 6, 2025 · Apt D5
Open — Nov sent out - BHazardous
Provide adequate supply of cold water for the fixtures at wash basin in the bathroom located at apt d4, 4th story, 1st apartment from south at west
Aug 1, 2025 · Apt D4
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Aug 1, 2025
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt c1, 3rd story, 1st apartment from north at east , section ''south''
Aug 1, 2025 · Apt C1
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft t ceiling in the bathroom located at apt a5, 1st story, 1st apartment from west at north
Jul 30, 2025 · Apt A5
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft t ceiling in the bathroom located at apt a5, 1st story, 1st apartment from west at north original violation 18128599 issued 30-jul-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Jul 30, 2025 · Apt A5
Open — First no access to re- inspect violation - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north located at apt a5, 1st story, 1st apartment from west at north
Jul 30, 2025 · Apt A5
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the 1st room from north located at apt b10, 2nd story, 2nd apartment from west at north
Jul 21, 2025 · Apt B10
Open — First no access to re- inspect violation - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and closet ceiling in the 1st room from north located at apt b10, 2nd story, 2nd apartment from west at north
Jul 21, 2025 · Apt B10
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north located at apt b10, 2nd story, 2nd apartment from west at north
Jul 21, 2025 · Apt B10
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt c6, 3rd story, 1st apartment from south at west , section at south
Jul 7, 2025 · Apt C6
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt c6, 3rd story, 1st apartment from south at west , section at south
Jul 7, 2025 · Apt C6
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar
Jul 7, 2025
Open — Not complied with - CImmediately hazardous
Provide hot water at all hot water fixtures in the kitchen located at apt c1, 3rd story, 1st apartment from north at east
Jul 7, 2025 · Apt C1
Open — Violation will be reinspected
DOB building violations · 41
- Construction other optional
Borough commissioner has ordered all work stopped under permit #b01043799-i1 on 10/22/25. intent to revoke approval and permit. stop all work immediately except to make site safe.
Dec 31, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2024
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 22, 2024
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2023
Dob violation - active
Show 31 more ↓
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2022
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2022
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 1, 2022
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2022
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2021
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 23, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2020
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2020
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2020
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2020
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2019
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2019
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 15, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Construction other optional
Work without a permit. having installed a new store front and entrance on third ave side remedy: obtain approvals & permits
Apr 22, 1999
Vw-violation work without permit - active - Construction other optional
C-construction other optional
Dec 6, 1990
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
Apr 4, 1990
Vp-violation unserved ecb-active
ECB violations · 14
- Class - 2
At time of inspection observed horizontal crack on bricks on 3rd floor exposure#1. also observed cracks on window sills at 2nd and 3rd floor. observed cracks on cornice and around window at 3rd floor, repair an
Aug 15, 2024 · Penalty $3,125
Active - Class - 1
Failure to provide unobstructed exit passageway. noted:at time of inspection,observation was made at exposure(3) and (4) of building 8513 adjacent to store/commercial space 8515 tailors&cleaners;drop down fire
Sep 22, 2020 · Penalty $3,125
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation#35361795y issued on 10/16/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01(d)(2).an acceptible certi
Jul 10, 2019 · Penalty $3,125
Resolve - Class - 2
Work w/o a permit:front facade above 1st fl entrance a business accessory illuminated signs approx 3'*8 reads "andrew gounardes democrat fornew york senate" installed w/o a permit.(no records of dob signs/illum
Oct 16, 2018 · Penalty $1,250
Resolve - Class - 3
Work w/o a permit. at front under awning installed illuminated box 1x2ft accessory sign for "foot and back" rub business, chinese body work.remedy: remove illegal work.
Feb 27, 2013 · Penalty $200
Active - Class - 2
Sidewalk shed does not meet code specifications. approx. 200 ft of shed in place at perimeter of above address (86th st & 3rd ave). no lightbulbs corner of premises and six (6) light bulbs on remaining section
Jul 15, 2009 · Penalty $2,400
Resolve - Class - 1
Inadequate safety measures: operation of hoisting equipment in unsafe manner. noted: upon inspection of site, found 1 one 5/16 cable use fr tie back, supporting s pair of "c" hooks while workers were suspen
Jun 19, 2009 · Penalty $4,800
Resolve - Class - 1
Failure to perform safe/proper inspection of suspended scaffold. noted: daily log indicates that all items on check list are in compliance. 1-tiebacks and life lines are not in compliance. rem:conform to safet
Jun 19, 2009
Resolve - Class - 2
Sidewalk shed does not meet code specifications sidewalk shed erected under permit #320012446 has inoperable not lit light fixtures at underside of shed thru-out exp#1 ground lvl rem: conform to code specificat
Jun 5, 2009 · Penalty $2,400
Resolve - Class - 2
Sidewalk shed does not conform to bldg code specifications. noted: there are missing vandal proof fixtures. no contractor sign along 3 ave. remedy: conform to bldg code specifications.
May 19, 2009 · Penalty $2,400
Resolve
Show 4 more ↓
- Non-hazardous
Exit door: total obstruction noted: exit door at 1st flr lobby(leadingto court yard) is locked and unoperable, which creates health and safety hazard for occupants of bldg, in case of emergency. also noted: all
Mar 1, 2006 · Penalty $480
Resolve - Non-hazardous
Work without a permit. having installed a new store front and entranceon third ave. side. remedy: obtain approvals & permits.
Apr 22, 1999 · Penalty $500
Resolve - Non-hazardous
Work without a permit work noted having installed a new store front and entrance without a permit remedy:obtain a permit if feasible or restore premises to prior legal condition.
Feb 26, 1993 · Penalty $1,000
Resolve - Non-hazardous
Work without a permit. work noted new door relocation, new store front placed under bn/1961/90 application remedy: obtain approvals and permits.
Dec 11, 1990 · Penalty $1,000
Resolve
Complaints
- Heat/hot water
Entire building
Oct 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 19, 2026 · Apt BLDG
Close - Paint/plaster
Ceiling
Aug 15, 2026 · Apt APTC1
Close - Paint/plaster
Ceiling
Aug 15, 2026 · Apt APTC1
Close - Door/window
Door frame
Aug 15, 2026 · Apt APTC1
Close - Water leak
Heavy flow
Aug 15, 2026 · Apt APTC1
Close - Water leak
Heavy flow
Jul 21, 2026 · Apt C1
Close - Unsanitary condition
Pests
Jun 21, 2026 · Apt C11
Close - Unsanitary condition
Pests
Jun 21, 2026 · Apt C11
Close
Show 40 more ↓
- Heat/hot water
Entire building
Apr 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 7, 2026 · Apt A5
Close - Heat/hot water
Apartment only
Apr 5, 2026 · Apt C7
Close - Heat/hot water
Entire building
Apr 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 29, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 29, 2026 · Apt C2
Close - Heat/hot water
Entire building
Mar 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 14, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 14, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 13, 2026 · Apt C7
Close - Heat/hot water
Apartment only
Mar 4, 2026 · Apt C7
Close - Heat/hot water
Entire building
Mar 3, 2026 · Apt C7
Close - Heat/hot water
Entire building
Feb 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 27, 2026 · Apt B4
Close - Heat/hot water
Entire building
Feb 23, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 23, 2026 · Apt C7
Close - Heat/hot water
Entire building
Feb 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 21, 2026 · Apt C7
Close - Heat/hot water
Entire building
Feb 19, 2026 · Apt C7
Close - Heat/hot water
Entire building
Feb 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 3, 2026 · Apt B3
Close - Heat/hot water
Entire building
Jan 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 4, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 3, 2026 · Apt A5
Close - Heat/hot water
Entire building
Jan 2, 2026 · Apt B4
Close - Heat/hot water
Entire building
Dec 27, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 24, 2025 · Apt D4
Close - Heat/hot water
Entire building
Dec 24, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 22, 2025 · Apt C1
Close - Heat/hot water
Entire building
Dec 21, 2025 · Apt B3
Close - Heat/hot water
Entire building
Dec 19, 2025 · Apt C6
Close - Electric
No lighting
Dec 17, 2025 · Apt BLDG
Close - Electric
No lighting
Dec 17, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 15, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 12, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 12, 2025 · Apt BLDG
Close - General
Bell/buzzer/intercom
Dec 10, 2025 · Apt C12
Close - Heat/hot water
Entire building
Dec 6, 2025 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1927
- Floors
- 4
- Residential units
- 40
- Building area
- 36,329 ft²
- Lot area
- 12,500 ft²
- Zoning
- R6B
- Community board
- 310
- Council district
- 47
- Block / lot
- 6034 / 1
- Assessed value
- $744,750
- Landmark / historic district
- No
HPD registration #370163, last renewed May 28, 2025.
Questions about 8517 3 Avenue
Who owns 8517 3 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 309 86th St Realty Corp.
Does 8517 3 Avenue have violations?
Yes. NYC HPD has recorded 1,161 housing violations at this property.
Is 8517 3 Avenue rent stabilized?
NYC Department of Finance tax bills listed 42 rent-stabilized units here in 2024 (about 100% of its 40 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 8517 3 Avenue built?
City records list 1927 as the year it was built.
How many apartments are in 8517 3 Avenue?
It has 40 residential units and 48 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.