429 61 Street
Brooklyn, NY 11220BBL 3-05782-0059Map
Owner of record: Troc, Richard
429 61 Street is a walk-up apartment building built in 1922 in Brooklyn, 11220. It has 24 residential units across 4 floors. The owner of record is Troc, Richard. HPD has recorded 5 housing violations here, most recently on October 23, 2018. City tax records listed 24 rent-stabilized apartments here in 2024.
- HPD violations
- 5
- DOB violations
- 2
- ECB violations
- 3
- HPD complaints
- 29
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 5
- BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots and wood on 2 nd story balcony at front of building south stack
Oct 23, 2018
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots on 4 th story balcony and air conditioner in window on 3 rd story balcony at front of building north stack
Oct 23, 2018
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) north wall, east wall in the 1st room from north at west located at apt 2a, 2nd story, 2nd apartment from south at west
Apr 1, 2008 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) baseboard at south wall, baseboard at east wall, baseboard at west wall in the bathroom located at apt 2a, 2nd story, 2nd apartment from south at west
Apr 1, 2008 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door from north at east wall, south wall in the foyer located at apt 2a, 2nd story, 2nd apartment from south at west
Apr 1, 2008 · Apt 2A
Closed — Violation closed
DOB building violations · 2
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jul 25, 1994
Dob violation - dismissed
ECB violations · 3
- Class - 1
Failure to maintain building in code compliant observation made at gasmeter set dressles amd distribution line.(outlet side of rotary gas metar.also in boiler room gasline(2)connected to boiler with no isulatio
Sep 1, 2021 · Penalty $1,250
Resolve - Class - 1
Work w/o permit.observed in cellar illegally converted 3 rms into class a unites .erected drywalls,3pc bathrm,sink,counter being used as kitchen w/microwave and ref,couch and tv.all work done including electric
Jan 22, 2018 · Penalty $400
Resolve - Class - 1
Occupancy contrary to allowed by the cofo or dob records.at time of inspections observed in cellar illegally class a units contrary to cofo#17007/hpd#334465 incellar as 3 rooms and 25 units in 4 floors.observed
Jan 22, 2018 · Penalty $600
Resolve
Complaints
- Heat/hot water
Entire building
Oct 20, 2018 · Apt 4B
Close - Unsanitary condition
Pests
Jul 1, 2018 · Apt 3D
Close - Unsanitary condition
Pests
Jun 27, 2018 · Apt 3D
Close - Door/window
Window pane
May 16, 2018 · Apt 4
Close - Flooring/stairs
Stairs
May 16, 2018 · Apt 4
Close - Door/window
Door
May 16, 2018 · Apt 4
Close - Water leak
Heavy flow
May 16, 2018 · Apt 4
Close - Safety
Fire escape
May 16, 2018 · Apt 4
Close - Plumbing
Boiler
May 16, 2018 · Apt 4
Close - Outside building
Roof door/hatch
May 16, 2018 · Apt 4
Close
Show 19 more ↓
- Paint/plaster
Ceiling
May 16, 2018 · Apt 4
Close - General
Mailbox
May 16, 2018 · Apt 4
Close - Water leak
Heavy flow
May 16, 2018 · Apt 4
Close - General
Ceramic-tile
Dec 4, 2011 · Apt 3A
Close - General
Floor
Dec 4, 2011 · Apt 3A
Close - General
Floor
Dec 4, 2011 · Apt 3A
Close - Plumbing
Bathtub/shower
Mar 27, 2008 · Apt 2A
Close - Plumbing
Radiator
Mar 27, 2008 · Apt 2A
Close - Paint/plaster
Wall
Mar 27, 2008 · Apt 2A
Close - General
Cabinet
Mar 27, 2008 · Apt 2A
Close - General
Floor
Mar 27, 2008 · Apt 2A
Close - General
Mold
Mar 27, 2008 · Apt 2A
Close - Heating
Heat related
Dec 31, 2005 · Apt 2E
Close - Appliance
Electric/gas range
Oct 14, 2005 · Apt 2F
Close - General
Fire-escape
Oct 14, 2005 · Apt 2F
Close - Nonconst
Rubbish
Oct 14, 2005 · Apt 2F
Close - Heating
Heat related
Oct 14, 2005 · Apt 2F
Close - General
Windows
Sep 29, 2005 · Apt 2F
Close - General
Windows
Sep 29, 2005 · Apt 2F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1922
- Floors
- 4
- Residential units
- 24
- Building area
- 16,844 ft²
- Lot area
- 6,000 ft²
- Zoning
- R6A
- Community board
- 307
- Council district
- 38
- Block / lot
- 5782 / 59
- Assessed value
- $537,750
- Landmark / historic district
- No
HPD registration #334465, last renewed Sep 15, 2025.
Questions about 429 61 Street
Who owns 429 61 Street?
The owner of record in NYC Department of City Planning PLUTO data is Troc, Richard.
Does 429 61 Street have violations?
Yes. NYC HPD has recorded 5 housing violations at this property.
Is 429 61 Street rent stabilized?
NYC Department of Finance tax bills listed 24 rent-stabilized units here in 2024 (about 100% of its 24 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 429 61 Street built?
City records list 1922 as the year it was built.
How many apartments are in 429 61 Street?
It has 24 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.