roofy

426 60 Street

Brooklyn, NY 11220BBL 3-05782-0015Map

Owner of record: Sik, Mingtsung

426 60 Street is a walk-up apartment building built in 1910 in Brooklyn, 11220. It has 3 residential units across 2 floors. The owner of record is Sik, Mingtsung. HPD has recorded 37 housing violations here, most recently on December 10, 2024. 17 of the 37 most recent violations are still open.

HPD violations
37
DOB violations
2
ECB violations
4
HPD complaints
58

What to know

Concern
6 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Dec 10, 2024

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 37

  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 2nd story

    Dec 10, 2024

    Closed — Violation dismissed
  • C

    Properly repair or replace the broken or defective scuttle cover to roof , 3rd story

    Dec 10, 2024

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges , 1st story

    Dec 10, 2024

    Closed — Violation closed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Dec 10, 2024

    Closed — Violation dismissed
  • A

    Paint or post a sign indicating floors missing at all stories at public hall

    Dec 10, 2024

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing , 2nd story

    Dec 10, 2024

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 2nd story

    Dec 10, 2024

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 2nd story

    Dec 10, 2024

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall

    Dec 10, 2024

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 8, 2024

    Closed — Violation dismissed
Show 27 more ↓
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 20, 2023

    Closed — Violation dismissed
  • B

    Replace with new the broken or defective rubber gasket at refrigerator doors in the kitchen located at apt 3rdflr, 3rd story, 1st apartment from west at north

    Mar 3, 2023 · Apt 3RDFLR

    Open — Nov sent out
  • B

    Remove all obstructions and repair all defects in waste line at wash basin in the bathroom located at apt 4throo, 3rd story, 1st apartment from west at north

    Mar 3, 2023 · Apt 4THROO

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchen located at apt 4throo, 3rd story, 1st apartment from west at north

    Mar 3, 2023 · Apt 4THROO

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt 4throo, 3rd story, 1st apartment from west at north

    Mar 3, 2023 · Apt 4THROO

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north

    Mar 3, 2023 · Apt 3

    Open — Notice of issuance sent to tenant
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north

    Mar 3, 2023 · Apt 3

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system boiler room door locked at cellar

    Mar 3, 2023

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story

    Mar 3, 2023

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 3rd story

    Mar 3, 2023

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak at ceiling at public hall, 3rd story

    Mar 3, 2023

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 4throo, 3rd story, 1st apartment from west at north

    Mar 3, 2023 · Apt 4THROO

    Open — Notice of issuance sent to tenant
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 3rd story

    Mar 3, 2023

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Dec 16, 2022

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3, 2nd story, 1st apartment from west at north

    Dec 15, 2022 · Apt 3

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hot water fixtures in the entire apartment located at apt 3, 2nd story, 1st apartment from west at north

    Dec 15, 2022 · Apt 3

    Open — Nov certified late
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3, 2nd story, 1st apartment from west at north

    Dec 15, 2022 · Apt 3

    Open — Invalid certification
  • B

    Abate the infestation consisting of roaches in the entire apartment located at apt 3, 2nd story, 1st apartment from west at north

    Dec 15, 2022 · Apt 3

    Open — Invalid certification
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 3, 2nd story, 1st apartment from west at north

    Dec 15, 2022 · Apt 3

    Open — Nov sent out
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the 1st bathroom located at apt 3rdflo, 3rd story, 1st apartment from west at north

    Jul 23, 2021 · Apt 3RDFLO

    Open — Nov certified late
  • B

    Properly repair the broken or defective entrance door in the 4th room from east at south located at apt 3rdflo, 3rd story, 1st apartment from west at north

    Jul 23, 2021 · Apt 3RDFLO

    Open — Nov certified late
  • B

    Properly repair the broken or defective electrical outlets at north and south walls in the 4th room from east at south located at apt 3rdflo, 3rd story, 1st apartment from west at north

    Jul 23, 2021 · Apt 3RDFLO

    Open — Nov certified late
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color walls in the 1st bedroom 2 from east located at apt 1fl, 1st story, apartment at west

    Sep 3, 2004 · Apt 1FL

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment located at apt 1fl, 1st story

    Aug 31, 2004 · Apt 1FL

    Closed — Violation closed
  • B

    § 9, 170, 171, 300, 301, 302 m.d.law-file plans and application and obtain a certificate of occupancy to legalize the conversion from a private dwelling to multiple dwelling use if lawfully feasible or restore to lawful occupancy

    May 19, 2004

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures kitchen & bathroom in the entire apartment located at apt 3, 2nd story

    Mar 25, 2001 · Apt 3

    Closed — Violation closed
  • C

    Remove the illegal fastening double cylinder key operated lock at door in the entrance located at apt 3, 2nd story

    Mar 25, 2001 · Apt 3

    Closed — Violation closed

DOB building violations · 2

  • Construction other optional

    Comply w/vbacate order

    Jan 29, 2019

    Dob violation - dismissed
  • Construction other optional

    Comply w/vacate order

    Jan 29, 2019

    Dob violation - dismissed

ECB violations · 4

  • Class - 2

    Failure to comply with the commissioners order contained in summons/violation#35362714h issued on 11/24/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for dwelling converted ma

    Mar 26, 2019

    Resolve
  • Class - 1

    Dwelling converted,maintained or occupied with 3 or more additional dwelling units than legally authorized by the c of o of official records.ref to c of o #32096147f indicates 3 stories/3 class a units building

    Nov 24, 2018

    Resolve
  • Class - 2

    Work without a permit. observed illegally converted 1st & 2nd floor from 2 dwellings into 8 sro's . installed full height partitions and extension.(expo 3)in 1st floor created 5 sro's all with key locked

    Nov 24, 2018 · Penalty $625

    Resolve
  • Class - 1

    Dwelling converted,maintained or occupied w/ 3 or more additional dwelling units than legally authorized by the c of o or official records. ref to c of o#32096147f indicates that building 3 stories/3 dwellings.

    Nov 24, 2018 · Penalty $40,000

    Resolve

Complaints

  • Door/window

    Door

    Dec 10, 2024 · Apt BLDG

    Close
  • General

    Signage missing

    Dec 10, 2024 · Apt BLDG

    Close
  • General

    Signage missing

    Dec 10, 2024 · Apt BLDG

    Close
  • General

    Signage missing

    Dec 10, 2024 · Apt BLDG

    Close
  • General

    Signage missing

    Dec 10, 2024 · Apt BLDG

    Close
  • General

    Signage missing

    Dec 10, 2024 · Apt BLDG

    Close
  • General

    Signage missing

    Dec 10, 2024 · Apt BLDG

    Close
  • General

    Signage missing

    Dec 10, 2024 · Apt BLDG

    Close
  • Electric

    Wiring

    Dec 10, 2024 · Apt BLDG

    Close
  • Outside building

    Roof door/hatch

    Dec 10, 2024 · Apt BLDG

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Dec 21, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 21, 2023 · Apt A

    Close
  • Appliance

    Electric/gas range

    Mar 3, 2023 · Apt 3R

    Close
  • Plumbing

    Basin/sink

    Mar 3, 2023 · Apt 3R

    Close
  • Appliance

    Refrigerator

    Mar 3, 2023 · Apt 3R

    Close
  • Plumbing

    Water supply

    Feb 23, 2023 · Apt 3

    Close
  • Electric

    Outlet/switch

    Feb 23, 2023 · Apt 3

    Close
  • Door/window

    Door

    Feb 23, 2023 · Apt 3

    Close
  • General

    Cabinet

    Feb 23, 2023 · Apt 3

    Close
  • Unsanitary condition

    Pests

    Feb 23, 2023 · Apt 3

    Close
  • Safety

    Carbon monoxide detector

    Feb 23, 2023 · Apt 3

    Close
  • Plumbing

    Toilet

    Feb 8, 2023 · Apt 4THROO

    Close
  • Electric

    Outlet/switch

    Feb 8, 2023 · Apt 4THROO

    Close
  • Unsanitary condition

    Pests

    Feb 8, 2023 · Apt 4THROO

    Close
  • Door/window

    Door

    Feb 8, 2023 · Apt 4THROO

    Close
  • Heat/hot water

    Entire building

    Dec 24, 2022 · Apt 3FL

    Close
  • Heat/hot water

    Entire building

    Dec 22, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 20, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 18, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 16, 2022 · Apt 3RDFLO

    Close
  • Heat/hot water

    Apartment only

    Dec 13, 2022 · Apt 3

    Close
  • Water leak

    Heavy flow

    Dec 8, 2022 · Apt 3RDFLR

    Close
  • Appliance

    Electric/gas range

    Dec 8, 2022 · Apt 3RDFLR

    Close
  • Heat/hot water

    Apartment only

    Dec 8, 2022 · Apt 3RDFLR

    Close
  • Heat/hot water

    Entire building

    Dec 7, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Nov 16, 2022 · Apt 3RDFLR

    Close
  • Appliance

    Electric/gas range

    Nov 16, 2022 · Apt 3RDFLR

    Close
  • Appliance

    Refrigerator

    Nov 16, 2022 · Apt 3RDFLR

    Close
  • Door/window

    Door

    Nov 16, 2022 · Apt 3RDFLR

    Close
  • Appliance

    Electric/gas range

    Nov 16, 2022 · Apt 3RDFLR

    Close
  • Plumbing

    Toilet

    Jul 17, 2021 · Apt 3RDFLO

    Close
  • Plumbing

    Water supply

    Jul 17, 2021 · Apt 3RDFLO

    Close
  • Appliance

    Electric/gas range

    Jul 17, 2021 · Apt 3RDFLO

    Close
  • Plumbing

    Toilet

    Jul 17, 2021 · Apt 3RDFLO

    Close
  • Door/window

    Door

    Jul 17, 2021 · Apt 3RDFLO

    Close
  • Appliance

    Refrigerator

    Jul 17, 2021 · Apt 3RDFLO

    Close
  • Heating

    Heat related

    Nov 4, 2013 · Apt NA

    Close
  • Nonconst

    Vermin

    Aug 27, 2004 · Apt 1FL

    Close
  • Paint/plaster

    Wall

    Aug 27, 2004 · Apt 1FL

    Close
  • Paint/plaster

    Ceiling

    Aug 27, 2004 · Apt 1FL

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C0)
Year built
1910
Floors
2
Residential units
3
Building area
2,588 ft²
Lot area
2,000 ft²
Zoning
R6B
Community board
307
Council district
38
Block / lot
5782 / 15
Assessed value
$83,460
Landmark / historic district
No

HPD registration #390499, last renewed Jun 12, 2025.

Questions about 426 60 Street

Who owns 426 60 Street?

The owner of record in NYC Department of City Planning PLUTO data is Sik, Mingtsung.

Does 426 60 Street have violations?

Yes. NYC HPD has recorded 37 housing violations at this property.

Is 426 60 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 426 60 Street built?

City records list 1910 as the year it was built.

How many apartments are in 426 60 Street?

It has 3 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.