426 60 Street
Brooklyn, NY 11220BBL 3-05782-0015Map
Owner of record: Sik, Mingtsung
426 60 Street is a walk-up apartment building built in 1910 in Brooklyn, 11220. It has 3 residential units across 2 floors. The owner of record is Sik, Mingtsung. HPD has recorded 37 housing violations here, most recently on December 10, 2024. 17 of the 37 most recent violations are still open.
- HPD violations
- 37
- DOB violations
- 2
- ECB violations
- 4
- HPD complaints
- 58
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 37
- CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 2nd story
Dec 10, 2024
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective scuttle cover to roof , 3rd story
Dec 10, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges , 1st story
Dec 10, 2024
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Dec 10, 2024
Closed — Violation dismissed - ANon-hazardous
Paint or post a sign indicating floors missing at all stories at public hall
Dec 10, 2024
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing , 2nd story
Dec 10, 2024
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 2nd story
Dec 10, 2024
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 2nd story
Dec 10, 2024
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Dec 10, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 8, 2024
Closed — Violation dismissed
Show 27 more ↓
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 20, 2023
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective rubber gasket at refrigerator doors in the kitchen located at apt 3rdflr, 3rd story, 1st apartment from west at north
Mar 3, 2023 · Apt 3RDFLR
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in waste line at wash basin in the bathroom located at apt 4throo, 3rd story, 1st apartment from west at north
Mar 3, 2023 · Apt 4THROO
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchen located at apt 4throo, 3rd story, 1st apartment from west at north
Mar 3, 2023 · Apt 4THROO
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt 4throo, 3rd story, 1st apartment from west at north
Mar 3, 2023 · Apt 4THROO
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north
Mar 3, 2023 · Apt 3
Open — Notice of issuance sent to tenant - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north
Mar 3, 2023 · Apt 3
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at cellar
Mar 3, 2023
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Mar 3, 2023
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 3rd story
Mar 3, 2023
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling at public hall, 3rd story
Mar 3, 2023
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4throo, 3rd story, 1st apartment from west at north
Mar 3, 2023 · Apt 4THROO
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 3rd story
Mar 3, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 16, 2022
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3, 2nd story, 1st apartment from west at north
Dec 15, 2022 · Apt 3
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hot water fixtures in the entire apartment located at apt 3, 2nd story, 1st apartment from west at north
Dec 15, 2022 · Apt 3
Open — Nov certified late - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3, 2nd story, 1st apartment from west at north
Dec 15, 2022 · Apt 3
Open — Invalid certification - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3, 2nd story, 1st apartment from west at north
Dec 15, 2022 · Apt 3
Open — Invalid certification - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 3, 2nd story, 1st apartment from west at north
Dec 15, 2022 · Apt 3
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the 1st bathroom located at apt 3rdflo, 3rd story, 1st apartment from west at north
Jul 23, 2021 · Apt 3RDFLO
Open — Nov certified late - BHazardous
Properly repair the broken or defective entrance door in the 4th room from east at south located at apt 3rdflo, 3rd story, 1st apartment from west at north
Jul 23, 2021 · Apt 3RDFLO
Open — Nov certified late - BHazardous
Properly repair the broken or defective electrical outlets at north and south walls in the 4th room from east at south located at apt 3rdflo, 3rd story, 1st apartment from west at north
Jul 23, 2021 · Apt 3RDFLO
Open — Nov certified late - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls in the 1st bedroom 2 from east located at apt 1fl, 1st story, apartment at west
Sep 3, 2004 · Apt 1FL
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment located at apt 1fl, 1st story
Aug 31, 2004 · Apt 1FL
Closed — Violation closed - BHazardous
§ 9, 170, 171, 300, 301, 302 m.d.law-file plans and application and obtain a certificate of occupancy to legalize the conversion from a private dwelling to multiple dwelling use if lawfully feasible or restore to lawful occupancy
May 19, 2004
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures kitchen & bathroom in the entire apartment located at apt 3, 2nd story
Mar 25, 2001 · Apt 3
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock at door in the entrance located at apt 3, 2nd story
Mar 25, 2001 · Apt 3
Closed — Violation closed
DOB building violations · 2
- Construction other optional
Comply w/vbacate order
Jan 29, 2019
Dob violation - dismissed - Construction other optional
Comply w/vacate order
Jan 29, 2019
Dob violation - dismissed
ECB violations · 4
- Class - 2
Failure to comply with the commissioners order contained in summons/violation#35362714h issued on 11/24/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for dwelling converted ma
Mar 26, 2019
Resolve - Class - 1
Dwelling converted,maintained or occupied with 3 or more additional dwelling units than legally authorized by the c of o of official records.ref to c of o #32096147f indicates 3 stories/3 class a units building
Nov 24, 2018
Resolve - Class - 2
Work without a permit. observed illegally converted 1st & 2nd floor from 2 dwellings into 8 sro's . installed full height partitions and extension.(expo 3)in 1st floor created 5 sro's all with key locked
Nov 24, 2018 · Penalty $625
Resolve - Class - 1
Dwelling converted,maintained or occupied w/ 3 or more additional dwelling units than legally authorized by the c of o or official records. ref to c of o#32096147f indicates that building 3 stories/3 dwellings.
Nov 24, 2018 · Penalty $40,000
Resolve
Complaints
- Door/window
Door
Dec 10, 2024 · Apt BLDG
Close - General
Signage missing
Dec 10, 2024 · Apt BLDG
Close - General
Signage missing
Dec 10, 2024 · Apt BLDG
Close - General
Signage missing
Dec 10, 2024 · Apt BLDG
Close - General
Signage missing
Dec 10, 2024 · Apt BLDG
Close - General
Signage missing
Dec 10, 2024 · Apt BLDG
Close - General
Signage missing
Dec 10, 2024 · Apt BLDG
Close - General
Signage missing
Dec 10, 2024 · Apt BLDG
Close - Electric
Wiring
Dec 10, 2024 · Apt BLDG
Close - Outside building
Roof door/hatch
Dec 10, 2024 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Dec 21, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 21, 2023 · Apt A
Close - Appliance
Electric/gas range
Mar 3, 2023 · Apt 3R
Close - Plumbing
Basin/sink
Mar 3, 2023 · Apt 3R
Close - Appliance
Refrigerator
Mar 3, 2023 · Apt 3R
Close - Plumbing
Water supply
Feb 23, 2023 · Apt 3
Close - Electric
Outlet/switch
Feb 23, 2023 · Apt 3
Close - Door/window
Door
Feb 23, 2023 · Apt 3
Close - General
Cabinet
Feb 23, 2023 · Apt 3
Close - Unsanitary condition
Pests
Feb 23, 2023 · Apt 3
Close - Safety
Carbon monoxide detector
Feb 23, 2023 · Apt 3
Close - Plumbing
Toilet
Feb 8, 2023 · Apt 4THROO
Close - Electric
Outlet/switch
Feb 8, 2023 · Apt 4THROO
Close - Unsanitary condition
Pests
Feb 8, 2023 · Apt 4THROO
Close - Door/window
Door
Feb 8, 2023 · Apt 4THROO
Close - Heat/hot water
Entire building
Dec 24, 2022 · Apt 3FL
Close - Heat/hot water
Entire building
Dec 22, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 20, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 18, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 16, 2022 · Apt 3RDFLO
Close - Heat/hot water
Apartment only
Dec 13, 2022 · Apt 3
Close - Water leak
Heavy flow
Dec 8, 2022 · Apt 3RDFLR
Close - Appliance
Electric/gas range
Dec 8, 2022 · Apt 3RDFLR
Close - Heat/hot water
Apartment only
Dec 8, 2022 · Apt 3RDFLR
Close - Heat/hot water
Entire building
Dec 7, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 16, 2022 · Apt 3RDFLR
Close - Appliance
Electric/gas range
Nov 16, 2022 · Apt 3RDFLR
Close - Appliance
Refrigerator
Nov 16, 2022 · Apt 3RDFLR
Close - Door/window
Door
Nov 16, 2022 · Apt 3RDFLR
Close - Appliance
Electric/gas range
Nov 16, 2022 · Apt 3RDFLR
Close - Plumbing
Toilet
Jul 17, 2021 · Apt 3RDFLO
Close - Plumbing
Water supply
Jul 17, 2021 · Apt 3RDFLO
Close - Appliance
Electric/gas range
Jul 17, 2021 · Apt 3RDFLO
Close - Plumbing
Toilet
Jul 17, 2021 · Apt 3RDFLO
Close - Door/window
Door
Jul 17, 2021 · Apt 3RDFLO
Close - Appliance
Refrigerator
Jul 17, 2021 · Apt 3RDFLO
Close - Heating
Heat related
Nov 4, 2013 · Apt NA
Close - Nonconst
Vermin
Aug 27, 2004 · Apt 1FL
Close - Paint/plaster
Wall
Aug 27, 2004 · Apt 1FL
Close - Paint/plaster
Ceiling
Aug 27, 2004 · Apt 1FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1910
- Floors
- 2
- Residential units
- 3
- Building area
- 2,588 ft²
- Lot area
- 2,000 ft²
- Zoning
- R6B
- Community board
- 307
- Council district
- 38
- Block / lot
- 5782 / 15
- Assessed value
- $83,460
- Landmark / historic district
- No
HPD registration #390499, last renewed Jun 12, 2025.
Questions about 426 60 Street
Who owns 426 60 Street?
The owner of record in NYC Department of City Planning PLUTO data is Sik, Mingtsung.
Does 426 60 Street have violations?
Yes. NYC HPD has recorded 37 housing violations at this property.
Is 426 60 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 426 60 Street built?
City records list 1910 as the year it was built.
How many apartments are in 426 60 Street?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.