roofy

136 Erasmus Street

Brooklyn, NY 11226BBL 3-05108-0024Map

Owner of record: Erasmus Realty LLC

136 Erasmus Street is an elevator apartment building built in 2015 in Brooklyn, 11226. It has 20 residential units across 5 floors. The owner of record is Erasmus Realty LLC. HPD has recorded 61 housing violations here, most recently on October 14, 2026. 12 of the 50 most recent violations are still open. City tax records listed 21 rent-stabilized apartments here in 2024.

HPD violations
61
DOB violations
4
ECB violations
11
HPD complaints
31

What to know

Concern
5 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Oct 14, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
21
About 100% of the building's 20 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 61

  • C

    Properly repair or replace the broken or defective lock and assembly at building front entrance door , 1st story

    Oct 14, 2026

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 4d, 4th story, 1st apartment from east at south

    Oct 10, 2026 · Apt 4D

    Open — Civ14 mailed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 4d, 4th story, 1st apartment from east at south

    Oct 10, 2026 · Apt 4D

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 4d, 4th story, 1st apartment from east at south

    Oct 10, 2026 · Apt 4D

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4d, 4th story, 1st apartment from east at south

    Oct 10, 2026 · Apt 4D

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system door locked leading to boiler room at public hall at boiler room

    Oct 10, 2026

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures

    Oct 10, 2026

    Open — Nov certified on time
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 4b, 4th story, 2nd apartment from west at north

    Oct 2, 2024 · Apt 4B

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... less than 3 sq ft at north wall in the bathroom located at apt 4b, 4th story, 2nd apartment from west at north

    Oct 2, 2024 · Apt 4B

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... less than 3 sq ft at north wall in the bathroom located at apt 4b, 4th story, 2nd apartment from west at north original violation 17317610 issued 02-oct-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Oct 2, 2024 · Apt 4B

    Open — First no access to re- inspect violation
Show 40 more ↓
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 3c, 3rd story, 3rd apartment from east at south

    Aug 18, 2024 · Apt 3C

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3c, 3rd story, 3rd apartment from east at south

    Aug 18, 2024 · Apt 3C

    Closed — Violation dismissed
  • B

    Replace with new the missing out let cover west wall in the foyer located at apt 3c, 3rd story, 3rd apartment from east at south

    Aug 18, 2024 · Apt 3C

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 3c, 3rd story, 3rd apartment from east at south

    Aug 18, 2024 · Apt 3C

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3c, 3rd story, 3rd apartment from east at south

    Aug 18, 2024 · Apt 3C

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 17, 2024

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 5a, 5th story, 1st apartment from west at north

    Oct 30, 2023 · Apt 5A

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 5a, 5th story, 1st apartment from west at north

    Oct 30, 2023 · Apt 5A

    Closed — Violation dismissed
  • B

    Repair the roof so that it will not leak above ceiling at public hall, 5th story

    Oct 30, 2023

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 5th story

    Oct 30, 2023

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 5th story

    Oct 30, 2023

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Oct 9, 2023

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story

    Oct 9, 2023

    Closed — Violation dismissed
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Oct 9, 2023

    Closed — Violation dismissed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story

    Oct 9, 2023

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Oct 9, 2023

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective door in the entrance located at apt 5a, 5th story, 1st apartment from west at north

    Oct 9, 2023 · Apt 5A

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 5a, 5th story, 1st apartment from west at north

    Oct 9, 2023 · Apt 5A

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system locked boiler room at boiler room

    Oct 9, 2023

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 5a, 5th story, 1st apartment from west at north

    Oct 9, 2023 · Apt 5A

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... at ceiling appox. 5 sq ft at cellar original violation 16295097 issued 08-oct-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Oct 8, 2023

    Open — First no access to re- inspect violation
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system that is missing at public hall, 1st story

    Oct 8, 2023

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Oct 8, 2023

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box that is missing at public hall, 1st story

    Oct 8, 2023

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Oct 8, 2023

    Closed — Violation dismissed
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Oct 8, 2023

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Oct 8, 2023

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at frame missing at public hall, 1st story

    Oct 8, 2023

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Oct 8, 2023

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1b, 1st story, 1st apartment from east at south

    Oct 8, 2023 · Apt 1B

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... at ceiling appox. 5 sq ft at cellar

    Oct 8, 2023

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of refrigerator with doors attached at cellar

    Oct 8, 2023

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 5d, 5th story, 1st apartment from east at south

    Oct 8, 2023 · Apt 5D

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 5d, 5th story, 1st apartment from east at south

    Oct 8, 2023 · Apt 5D

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at penthouse 5d, 5th story, 1st penthouse from east at south

    Oct 8, 2023 · Apt 5D

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at west wall in the kitchen located at apt 3e, 3rd story, 1st apartment from east at south

    Jun 18, 2023 · Apt 3E

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 3e, 3rd story, 1st apartment from east at south

    Jun 18, 2023 · Apt 3E

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective frame at window in the 1st room from north located at apt 3e, 3rd story, 1st apartment from east at south

    Jun 18, 2023 · Apt 3E

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 31, 2023

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 15, 2022

    Closed — Violation dismissed

DOB building violations · 4

  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 27, 2018

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2016 inspection/test

    Sep 15, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 22, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 4, 2016

    Dob violation - dismissed

ECB violations · 11

  • Class - 2

    Failure to provide approved/accepted plans @ job site @ time of insp. note: new bldg being erected w/ permit# 321050170 & @ time of insp observed 5 construction workers on 2nd flr & no approved plans submitted

    Dec 8, 2016

    Resolve
  • Class - 1

    Failure to safeguard all person and property affeted by construction operations.noted:new bldg being erected w.permit #321050170 and @time of inspection observed plywood fence gate open and any person can walk

    Dec 3, 2016

    Resolve
  • Class - 1

    3301.2 unsafe temporary construction measures: unsafe stairs. on the date noted above i performed an inspection of the new building under construction. at the time of the inspection, i observed inside the build

    May 4, 2016 · Penalty $1,600

    Resolve
  • Class - 2

    Failure to erect, maintain & certify construction of fence per section requirements. on the date noted above i performed an inspection of the new building under construction. at the time of my inspection and do

    May 4, 2016

    Resolve
  • Class - 1

    3301.1.2&3313.1 failure to comply with fire code: no permit for on site storage of flamable materials. on the date noted above i performed an inspection of the new building under construction. at the time of my

    May 4, 2016 · Penalty $1,600

    Resolve
  • Class - 1

    Sec. 3307.7 missing fence. at the time of my inspection construction work in progress. new bldg structure upto 2 sty. i observed fence missing at exp#4. creating a hazardous condition to adjacent bldg residence

    Apr 14, 2016 · Penalty $1,600

    Resolve
  • Class - 1

    Sec. 3307.6.2 failure to provide overhead protection for adjacent at exp#2,4. at the time of my inspection new bldg structure upto 2 sty. i observed no overhead protection was provided for adjacent property at

    Apr 14, 2016 · Penalty $1,600

    Resolve
  • Class - 1

    1rcny 48 failure to adequately supervise work @const site, so as to maintain a safe const site & ensure compliance w/approved const docs & chapter 33.following hazardous condition was observed (pswo issued) to

    Feb 11, 2016 · Penalty $1,600

    Resolve
  • Class - 1

    No guardrails/inadequate guardrails.noted:foundation phase.inadequate/missing guardrail erected around the perimeter of pit (about 10-12 ft deep)potential dance of someone to fall in pswo issued pursuant to 28-

    Feb 11, 2016 · Penalty $1,200

    Resolve
  • Class - 2

    Work w/o permit.noticed @ time of inspection 8ft high construction fence installed ground entire site no permit on file in dob system.rem:stop all work & obtain permit

    Apr 13, 2015 · Penalty $4,000

    Resolve
Show 1 more ↓
  • Non-hazardous

    Occupancy contrary to that allowed by the bldg dept records:side and rear yard is being used for off street parking and for storage of unl-icensed motor vehicles.note:10 motor vehicles parked on premises at ti

    Oct 23, 1995 · Penalty $400

    Resolve

Complaints

  • Heat/hot water

    Apartment only

    Oct 13, 2026 · Apt 4D

    Close
  • Heat/hot water

    Apartment only

    Oct 11, 2026 · Apt 4D

    Close
  • Heat/hot water

    Apartment only

    Oct 10, 2026 · Apt 4D

    Close
  • Heat/hot water

    Entire building

    Oct 9, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Oct 8, 2026 · Apt 4D

    Close
  • Heat/hot water

    Entire building

    Apr 27, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 26, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 26, 2026 · Apt BLDG

    Close
  • General

    Ventilation system

    Apr 19, 2026 · Apt 4D

    Close
  • Door/window

    Window frame

    Mar 31, 2026 · Apt 4D

    Close
Show 21 more ↓
  • General

    Ventilation system

    Mar 27, 2026 · Apt 4D

    Close
  • Water leak

    Slow leak

    Feb 24, 2026 · Apt 2E

    Close
  • Water leak

    Damp spot

    Feb 24, 2026 · Apt 2E

    Close
  • Unsanitary condition

    Mold

    Jan 9, 2026 · Apt 4D

    Close
  • Water leak

    Heavy flow

    Jul 1, 2025 · Apt 2C

    Close
  • Unsanitary condition

    Mold

    Jul 1, 2025 · Apt 2C

    Close
  • Door/window

    Door

    May 4, 2025 · Apt 2E

    Close
  • Unsanitary condition

    Pests

    Sep 27, 2024 · Apt 4B

    Close
  • Unsanitary condition

    Mold

    Aug 13, 2024 · Apt 3C

    Close
  • Electric

    Outlet/switch

    Aug 13, 2024 · Apt 3C

    Close
  • Plumbing

    Toilet

    Aug 13, 2024 · Apt 3C

    Close
  • Heat/hot water

    Entire building

    Oct 9, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 8, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 8, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 8, 2023 · Apt BLDG

    Close
  • Unsanitary condition

    Mold

    Jun 12, 2023 · Apt 3E

    Close
  • Door/window

    Window pane

    Jun 12, 2023 · Apt 3E

    Close
  • Heat/hot water

    Apartment only

    Feb 9, 2022 · Apt 3E

    Close
  • Appliance

    Refrigerator

    Jan 17, 2022 · Apt 3C

    Close
  • Water leak

    Slow leak

    Nov 18, 2021 · Apt 5C

    Close
  • Unsanitary condition

    Pests

    Nov 18, 2021 · Apt 5C

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D3)
Year built
2015
Floors
5
Residential units
20
Building area
13,966 ft²
Lot area
6,544 ft²
Zoning
R6
Community board
317
Council district
40
Block / lot
5108 / 24
Assessed value
$1,231,200
Landmark / historic district
No

HPD registration #387122, last renewed Sep 15, 2025.

Questions about 136 Erasmus Street

Who owns 136 Erasmus Street?

The owner of record in NYC Department of City Planning PLUTO data is Erasmus Realty LLC.

Does 136 Erasmus Street have violations?

Yes. NYC HPD has recorded 61 housing violations at this property.

Is 136 Erasmus Street rent stabilized?

NYC Department of Finance tax bills listed 21 rent-stabilized units here in 2024 (about 100% of its 20 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 136 Erasmus Street built?

City records list 2015 as the year it was built.

How many apartments are in 136 Erasmus Street?

It has 20 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.