124 Erasmus Street
Brooklyn, NY 11226BBL 3-05108-0020Map
Owner of record: 124 Erasmus Holdings LLC
124 Erasmus Street is a walk-up apartment building built in 2019 in Brooklyn, 11226. It has 10 residential units across 4.33 floors. The owner of record is 124 Erasmus Holdings LLC. HPD has recorded 48 housing violations here, most recently on June 16, 2025. City tax records listed 5 rent-stabilized apartments here in 2024.
- HPD violations
- 48
- DOB violations
- 3
- ECB violations
- 19
- HPD complaints
- 57
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 48
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 16, 2025
Closed — Violation dismissed - ANon-hazardous
Paint or post a sign indicating floors all stories at public hall
Nov 25, 2020
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Nov 25, 2020
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the building front
Nov 25, 2020
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at at public hall, 1st story
Nov 25, 2020
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Nov 25, 2020
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Nov 25, 2020
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
Nov 25, 2020
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Nov 25, 2020
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Nov 25, 2020
Closed — Violation dismissed
Show 38 more ↓
- CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story
Nov 25, 2020
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling in the gym , 1st story
Nov 25, 2020
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the gym , 1st story
Nov 25, 2020
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the gym , 1st story
Nov 25, 2020
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 25, 2018
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 7, 2017
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 25, 2016
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 19, 2015
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 3, 2015
Closed — Violation closed - BHazardous
Replace with new the broken or defective ceramic floor tiles in the kitchen located at apt 2, 2nd story, apartment at west
Apr 2, 2010 · Apt 2
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 2, 2nd story, apartment at west
Apr 2, 2010 · Apt 2
Closed — Violation closed - BHazardous
Replace with new the broken or defective ceramic floor tiles in the bathroom located at apt 2, 2nd story, apartment at west
Apr 2, 2010 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls/ceiling in the 1st room from north at east located at apt 2, 2nd story, apartment at west
Apr 2, 2010 · Apt 2
Closed — Violation closed - BHazardous
Replace with new the broken or defective ceramic floor tiles in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Mar 27, 2010 · Apt 2
Closed — Violation closed - ANon-hazardous
Replace with new the missing escutcheon plate at riser in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Mar 27, 2010 · Apt 2
Closed — Violation closed - BHazardous
Replace with new the broken or defective ceramic floor tiles in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Mar 27, 2010 · Apt 2
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 2, 2nd story, 1st apartment from east at south
Mar 17, 2010 · Apt 2
Closed — Violation closed - BHazardous
Repair or replace the smoke detector inoperable located at apt 2, 2nd story, 1st apartment from east at south
Mar 17, 2010 · Apt 2
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Mar 17, 2010 · Apt 2
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Mar 17, 2010 · Apt 2
Closed — Violation closed - BHazardous
Replace with new the missing escutcheon plate at rizer in the 1st room from north at east located at apt 2, 2nd story, 1st apartment from east at south
Feb 27, 2010 · Apt 2
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood window frames (1) & (2) at west wall in the 2nd room from north located at apt 2, 2nd story, 1st apartment from east at south
Feb 27, 2010 · Apt 2
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective sheetrock north wall in the 1st room from north at east located at apt 2, 2nd story, 1st apartment from east at south
Feb 27, 2010 · Apt 2
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective located at apt 2, 2nd story, 1st apartment from east at south
Feb 27, 2010 · Apt 2
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective sheetrock south wall in the 4th room from north at east located at apt 2, 2nd story, 1st apartment from east at south
Feb 27, 2010 · Apt 2
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation south radiator in the 4th room from north at east located at apt 2, 2nd story, 1st apartment from east at south
Feb 27, 2010 · Apt 2
Closed — Violation closed - BHazardous
Replace with new the missing escutcheon plate at riser in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Feb 27, 2010 · Apt 2
Closed — Violation closed - BHazardous
Replace with new the broken or defective ceramic floor tiles in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Feb 27, 2010 · Apt 2
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Feb 27, 2010 · Apt 2
Closed — Violation closed - BHazardous
Replace with new the broken or defective ceramic floor tiles in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Feb 27, 2010 · Apt 2
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt 2, 2nd story, 1st apartment from east at south
Feb 27, 2010 · Apt 2
Closed — Violation closed - BHazardous
Properly repair the broken or defective locking devices, lower window sashes, thruout in the entire apartment located at apt 1, 1st story
Apr 25, 2001 · Apt 1
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing ( mr eluevs ) in the entire apartment located at apt 1, 1st story
Apr 25, 2001 · Apt 1
Closed — Violation closed - BHazardous
Properly repair the broken or defective counter balance springs lower window sash west room located at apt 1, 1st story
Apr 25, 2001 · Apt 1
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets sink in the kitchen located at apt 1, 1st story
Apr 25, 2001 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective connection waste line sink in the kitchen located at apt 1, 1st story
Apr 25, 2001 · Apt 1
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of concealed water leak ceiling in the bathroom located at apt 1, 1st story
Apr 25, 2001 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls in the bathroom located at apt 1, 1st story
Apr 25, 2001 · Apt 1
Closed — Violation closed
DOB building violations · 3
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 6, 2019
Dob violation - dismissed - Construction other optional
Stop all work immediately & make site safe
Jan 14, 2019
Dob violation - dismissed - Unsafe buildings none
Ub-unsafe buildings none
Nov 10, 2018
Dob violation - dismissed
ECB violations · 19
- Class - 2
Failure to maintain adequate housekeeping per section requirements.work in progress under valid permit #321735440-q1-nb with exp date 1/15/2020 & approved set of const drawing dated 10/18/2018 work susbstantial
Oct 28, 2019
Resolve - Class - 2
Bc3314.1/failure to provide supp scaffold as per code.at the time of my inspection 4 sty nb active site observed a supp scaffold approx 40ftat expos 1,where planks not tied down,materials left on platform missi
Oct 24, 2019 · Penalty $625
Resolve - Class - 2
Bc3314.4.3.3/installation inspection reports.at the time of my inspection 4 sty nb active site observed approx 40ft high supp scaffold at expos #1 loose planks,missions guard rails toe board,left const.material
Oct 24, 2019 · Penalty $625
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirement.observed at 4 stories building on floors all over the building the garbageand materials on floors in corridors,in electrical wire cut pieces,met
Aug 29, 2019
Resolve - Class - 1
3303.9 failure to maintain safe means of egress.at the time of my inspection of a proposed 4 story bld.at excavation,foundation level with construct. operations in progress,i observed removed excavated soil @ex
May 2, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to provide protection at sides of excavation.at the time of myinspection of a proposed 4 story bld.at excavation/construction level with construct.operations in progress,i observed sheer cut soil approx
May 2, 2019 · Penalty $5,000
Resolve - Class - 2
Failure to institute and maintain safety equipment measures and temp-oorary construction. note: at the time of my inspection of a 3 story building under demolition construction work in progress.i observed
Jan 4, 2019 · Penalty $625
Resolve - Class - 1
Sec. 3303.9 egress-failure to maintain required means of egress & other elements of bldg under construction. at time of inspection of an active 3 sty demo job,i observed entire staircase from floors 1-3 complet
Nov 20, 2018 · Penalty $6,250
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements. attime of inspection observed the following violating conditions: construction debris consistent of wood,plastic,sheetrock,metal studs,discard
Nov 20, 2018 · Penalty $6,250
Resolve - Class - 1
Failure to safeguard all persons & property. at time of inspection observed the following violating conditions as i pulled up to site workerwere throwing construction debris from an active job site from top of
Nov 20, 2018 · Penalty $12,500
Resolve
Show 9 more ↓
- Class - 1
Failure to safeguard all persons & property at time of inspection observed active demolition of a 1 sty bldg in rear yard of 124 eramus street while the was construction fence in place at exp#2&3 construction
Nov 20, 2018 · Penalty $12,500
Resolve - Class - 2
Failure to provide approved construction documents at job site at timeof inspection: at time of inspection after asking the following construciton documents were not on site & not provided. daily construction
Nov 20, 2018
Resolve - Class - 2
Sec. 3303.2.4 failure to provide sanitary facilities during demolition activities at time of inspection of demolition of 3 sty structure,no portable sanitaty facilities on site for workers. remedy: comply w/cod
Nov 20, 2018
Resolve - Class - 1
Construction superintendent failed to perform duties at time of inspection the following violating conditions were observed at jobsite permit#321755098 w/construction super ralph scopo lic#0024829 as designated
Nov 20, 2018 · Penalty $10,000
Resolve - Class - 2
Sec. 3301.13.13 failure to maintain daily log books. at time of inspection of an active 3 store demo site,permit#321755196 under direction of construction superintedent ralph scopo,who was not present at time
Nov 20, 2018
Resolve - Class - 1
Failure to carry at demolition operations as required by section-at time of inspection,observed active demolition taking place at floors 1,2&3 w/removal of local bearing partitions & interior walls,w/o proper
Nov 20, 2018 · Penalty $12,500
Resolve - Class - 1
Sec. 3309.1 failure to protect adjoining properties during construction or demolition at time of inspection,of an active 3 sty demolition job observed sidewalk at shed needs to be a minimum at 5ft beuond proper
Nov 20, 2018 · Penalty $6,250
Resolve - Class - 1
C.s. failed to perform duties as per rule at time of inspection of an active 3 sty demolition job permit#32755196 the following vilating conditions were observed & vilations issued for job under constructions
Nov 20, 2018
Resolve - Class - 2
Sec. 3301.13.13 fai;ure to maintain daily log books. at time of inspection,of an active 3 sty demolition site permit#321755098 under the direction of c.s. ralph scopo dob lic#0024829,who was not present at time
Nov 20, 2018
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Aug 24, 2021 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 23, 2020 · Apt 3A
Close - Unsanitary condition
Pests
Jan 3, 2019 · Apt 1
Close - Unsanitary condition
Pests
Jan 3, 2019 · Apt 1
Close - Unsanitary condition
Pests
Jan 3, 2019 · Apt 1
Close - Unsanitary condition
Garbage/recycling storage
Sep 16, 2018 · Apt BLDG
Close - Heating
Heat related
Mar 7, 2011 · Apt 2
Close - Heating
Heat related
May 18, 2010 · Apt 2
Close - Heating
Heat related
May 11, 2010 · Apt 2
Close - Heating
Heat related
May 10, 2010 · Apt 2
Close
Show 40 more ↓
- Heating
Heat related
May 9, 2010 · Apt 2
Close - Heating
Heat related
Apr 28, 2010 · Apt 2
Close - Heating
Heat related
Apr 27, 2010 · Apt 2
Close - Heating
Heat related
Apr 26, 2010 · Apt 2
Close - Heating
Heat related
Apr 19, 2010 · Apt 2
Close - Heating
Heat related
Apr 18, 2010 · Apt 2
Close - Paint/plaster
Wall
Mar 29, 2010 · Apt 2
Close - General
Windows
Mar 29, 2010 · Apt 2
Close - General
Mold
Mar 29, 2010 · Apt 2
Close - General
Floor
Mar 29, 2010 · Apt 2
Close - General
Floor
Mar 29, 2010 · Apt 2
Close - General
Mold
Mar 29, 2010 · Apt 2
Close - Paint/plaster
Ceiling
Mar 29, 2010 · Apt 2
Close - Nonconst
Vermin
Mar 29, 2010 · Apt 2
Close - Paint/plaster
Ceiling
Mar 29, 2010 · Apt 2
Close - Heating
Heat related
Mar 29, 2010 · Apt 2
Close - Heating
Heat related
Mar 24, 2010 · Apt 2
Close - General
Ceramic-tile
Mar 24, 2010 · Apt 2
Close - General
Floor
Mar 24, 2010 · Apt 2
Close - Paint/plaster
Wall
Mar 24, 2010 · Apt 2
Close - General
Ceramic-tile
Mar 24, 2010 · Apt 2
Close - General
Ceramic-tile
Mar 13, 2010 · Apt 2
Close - General
Ceramic-tile
Mar 13, 2010 · Apt 2
Close - General
Windows
Mar 13, 2010 · Apt 2
Close - General
Windows
Mar 13, 2010 · Apt 2
Close - General
Cabinet
Mar 13, 2010 · Apt 2
Close - Nonconst
Vermin
Mar 13, 2010 · Apt 2
Close - General
Cabinet
Mar 13, 2010 · Apt 2
Close - Heating
Heat related
Mar 13, 2010 · Apt 2
Close - Paint/plaster
Wall
Feb 22, 2010 · Apt 2
Close - General
Windows
Feb 22, 2010 · Apt 2
Close - Nonconst
Vermin
Feb 22, 2010 · Apt 2
Close - Paint/plaster
Ceiling
Feb 22, 2010 · Apt 2
Close - General
Cabinet
Feb 22, 2010 · Apt 2
Close - General
Cabinet
Feb 22, 2010 · Apt 2
Close - General
Ceramic-tile
Feb 22, 2010 · Apt 2
Close - General
Ceramic-tile
Feb 22, 2010 · Apt 2
Close - Paint/plaster
Ceiling
Feb 19, 2010 · Apt 2
Close - Paint/plaster
Ceiling
Feb 19, 2010 · Apt 2
Close - Nonconst
Vermin
Feb 19, 2010 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 2019
- Floors
- 4.33
- Residential units
- 10
- Building area
- 7,714 ft²
- Lot area
- 3,250 ft²
- Zoning
- R6
- Community board
- 317
- Council district
- 40
- Block / lot
- 5108 / 20
- Assessed value
- $695,250
- Landmark / historic district
- No
HPD registration #389361, last renewed Aug 4, 2025.
Questions about 124 Erasmus Street
Who owns 124 Erasmus Street?
The owner of record in NYC Department of City Planning PLUTO data is 124 Erasmus Holdings LLC.
Does 124 Erasmus Street have violations?
Yes. NYC HPD has recorded 48 housing violations at this property.
Is 124 Erasmus Street rent stabilized?
NYC Department of Finance tax bills listed 5 rent-stabilized units here in 2024 (about 50% of its 10 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 124 Erasmus Street built?
City records list 2019 as the year it was built.
How many apartments are in 124 Erasmus Street?
It has 10 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.