104 Linden Boulevard
Brooklyn, NY 11226BBL 3-05087-0021Map
Owner of record: 104 Linden Blvd LLC
104 Linden Boulevard is a walk-up apartment building built in 1901 in Brooklyn, 11226. It has 15 residential units across 4.25 floors. The owner of record is 104 Linden Blvd LLC. HPD has recorded 21 housing violations here, most recently on February 1, 2025. City tax records listed 15 rent-stabilized apartments here in 2024.
- HPD violations
- 21
- DOB violations
- 0
- ECB violations
- 18
- HPD complaints
- 31
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 21
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4b, 4th story, 2nd apartment from south at west
Feb 1, 2025 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Feb 1, 2025
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system defective at public hall
Feb 1, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at all walls and ceilings in the entire apartment located at apt 4b, 4th story, 2nd apartment from south at west
Sep 12, 2024 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4b, 4th story, 2nd apartment from south at west
Sep 12, 2024 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door at north at public hall, 2nd story
Sep 12, 2024
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of bicycles and household items at public hall, 1st story
Sep 12, 2024
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4b, 4th story, 1st apartment from south at west
May 1, 2024 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
May 1, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at bulkhead door at public hall, 4th story
Feb 27, 2024
Closed — Violation closed
Show 11 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at bulkhead door at public hall, 4th story
Nov 8, 2023
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective mortise lock at door in the entrance located at apt 3d, 3rd story, 1st apartment from south at west
May 23, 2023 · Apt 3D
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3d, 3rd story, 1st apartment from south at west
May 23, 2023 · Apt 3D
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3d, 3rd story, 1st apartment from south at west
May 23, 2023 · Apt 3D
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4b, 4th story, 1st apartment from south at west
Oct 12, 2022 · Apt 4B
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at basement
Oct 12, 2022
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at ceiling in the 2nd room from north located at apt 4b, 4th story, 1st apartment from south at west
Oct 12, 2022 · Apt 4B
Closed — Violation dismissed - ANon-hazardous
Provide a lock and key to the entrance door of dwelling unit and, if a cl a multiple dwelling, also chain guiard in the entrance located at apt 4b, 4th story, 1st apartment from south at west
Oct 12, 2022 · Apt 4B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north located at apt 4b, 4th story, 1st apartment from south at west
Oct 12, 2022 · Apt 4B
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 25, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 9, 2021
Closed — Violation dismissed
DOB building violations · 0
No DOB violations on record
ECB violations · 18
- Class - 2
Failure to comply w/governor's executive order. at the time of inspection,observed ongoing construction activies contrary to governor's executive order#202.6;202.8;202.11;202.13 & guidance published by the empi
Apr 1, 2020
Resolve - Class - 1
Failure to institute safety equipment measures & temporary construction-no guardrails.at time of my inspection observed 4th fl roof conditions where material & installation of framing was actively stored & inst
Mar 4, 2020 · Penalty $2,500
Resolve - Class - 2
Bc3309.10 protection of roofs.at the time of my inspection & review ofsite safety plans,i observed that roof protection had not been installed for the exposure #2 adjacent bldg.additionally noting that current
Mar 4, 2020
Resolve - Class - 1
Failure to maintain record of pre-shift safety meeting for each workerat the time of my inspection of a 4-story alteration,i observed an active project w/approx.(25)workers on site performing plumbing,carpentry
Mar 4, 2020 · Penalty $2,500
Resolve - Class - 1
Failure to maintain a record of orientations performed at worksite.at the time of my inspection of a 4-story alteration,on request to reviewthe record of site orientations performed none could be provided.at th
Mar 4, 2020 · Penalty $2,500
Resolve - Class - 1
Work does not conform to approved construction documents &/or amendments.at time of inspection,i observed the use of c-joist cold formed steel construction on request to confirm regular third-party inspection
Mar 4, 2020 · Penalty $625
Resolve - Class - 2
Bc3314.3.3 failure to provide accepted construction design drawings atthe time of my inspection,i observed a supported scaffold system at exposure#3.on request for the approved/accepted scaffold drawings to rev
Mar 4, 2020
Resolve - Class - 2
Failure to maintain onsite documents required by bc chapter 33.at the time of my inspection of a 4 story alteration upon request to review the following,the general contractor was unable to provide:1.)evidence
Mar 4, 2020
Resolve - Class - 1
Failure to safeguard all persosn and property affected by construction operation observed demolition work in progress under valid pemrit #321385106-01-al and approved set of drawings dated 11-01-2019 all permit
Dec 6, 2019
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#39007310k issued on 08-07-19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to maintain bldg in code compliant manner. remedy: comp
Oct 8, 2019 · Penalty $3,125
Resolve
Show 8 more ↓
- Class - 1
Work without a permit. at time of inspection observed entire roof removed exposing interior to elements. alt1 under #321953953 disapproved on 07/03/2019 no permits. also note: removal of roof has now caused wat
Aug 7, 2019
Resolve - Class - 1
Failure to maintain building in-code compliant manner. at time of inspection observed asphalt roof completely removed exposing entire interior to the elements. also damaging adjoining building 102 linden boulev
Aug 7, 2019 · Penalty $1,250
Resolve - Class - 1
Failure to maintain bldg walls or appurtenances. noted: observed at roof level large holes in the roofs sheather that not covered. remedy: maintain exterior bldg walls.
Apr 11, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to comply w/an order of the commissioner. noted: at the time of my inspection i observed no c/c on file for ecb vio #34454172y w/the nyc dob. remedy: file a c/c.
Mar 27, 2012
Resolve - Class - 3
Violation of parking regulations in a residential district. noted: at the time of my inspection i observed 3 vehicles parked at the front yard contrary to zoning. there is no "osp" space on file w/the dept.
Mar 27, 2012 · Penalty $300
Resolve - Class - 2
Illegal use in residential district r7-1. noted: front yard of property being used as storage of 1 vehicle, observed 1 blue dodge vehicle parked/stored at time of inspection w/no lic plate # and no valid
Feb 11, 2011
Resolve - Non-hazardous
Violation of parking regulations in a residential district. two (2) vehicles stored in front yard parking pad one (1) maroon nissan quest mini van south carolina license plate #139sdt and one (1) light colored
Oct 13, 2004 · Penalty $480
Resolve - Non-hazardous
Work without a permit. having cut curb at front of premises and created parking pad no record on file for curb cut.
May 8, 1998
Resolve
Complaints
- Plumbing
Basin/sink
Apr 16, 2025 · Apt 4B
Close - Plumbing
Basin/sink
Apr 14, 2025 · Apt 4B
Close - Heat/hot water
Apartment only
Jan 30, 2025 · Apt 4B
Close - Heat/hot water
Apartment only
Dec 23, 2024 · Apt 4B
Close - Heat/hot water
Apartment only
Dec 22, 2024 · Apt 4B
Close - Electric
Lighting
Oct 2, 2024 · Apt 4B
Close - Electric
Power outage
Sep 11, 2024 · Apt 4B
Close - Electric
No lighting
Sep 10, 2024 · Apt 4B
Close - Heat/hot water
Apartment only
Sep 10, 2024 · Apt 4B
Close - Electric
Power outage
Sep 10, 2024 · Apt 4B
Close
Show 21 more ↓
- Water leak
Slow leak
Aug 29, 2024 · Apt 4B
Close - Unsanitary condition
Pests
Aug 29, 2024 · Apt 4B
Close - Door/window
Door
May 25, 2024 · Apt 4B
Close - Door/window
Door
May 25, 2024 · Apt 4B
Close - Unsanitary condition
Pests
May 5, 2024 · Apt 4B
Close - Heat/hot water
Apartment only
May 1, 2024 · Apt 4B
Close - Heat/hot water
Apartment only
Feb 26, 2024 · Apt 4B
Close - Unsanitary condition
Pests
Feb 3, 2024 · Apt 3D
Close - Unsanitary condition
Pests
Feb 3, 2024 · Apt 3D
Close - Heat/hot water
Apartment only
Nov 6, 2023 · Apt 4B
Close - Plumbing
Toilet
May 27, 2023 · Apt 4B
Close - Heat/hot water
Apartment only
May 2, 2023 · Apt 4B
Close - Paint/plaster
Ceiling
Feb 13, 2023 · Apt 4B
Close - Door/window
Door
Nov 28, 2022 · Apt 3D
Close - Unsanitary condition
Pests
Oct 30, 2022 · Apt 4B
Close - Water leak
Damp spot
Oct 6, 2022 · Apt 4B
Close - Door/window
Door
Oct 6, 2022 · Apt 4B
Close - Plumbing
Water supply
Oct 6, 2022 · Apt 4B
Close - Heat/hot water
Apartment only
Mar 23, 2022 · Apt 4B
Close - Heat/hot water
Apartment only
Jan 20, 2022 · Apt 3B
Close - Heat/hot water
Apartment only
Nov 5, 2021 · Apt 4B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1901
- Floors
- 4.25
- Residential units
- 15
- Building area
- 7,062 ft²
- Lot area
- 2,600 ft²
- Zoning
- R7-1
- Community board
- 317
- Council district
- 40
- Block / lot
- 5087 / 21
- Assessed value
- $665,550
- Landmark / historic district
- No
HPD registration #389353, last renewed Aug 14, 2025.
Questions about 104 Linden Boulevard
Who owns 104 Linden Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is 104 Linden Blvd LLC.
Does 104 Linden Boulevard have violations?
Yes. NYC HPD has recorded 21 housing violations at this property.
Is 104 Linden Boulevard rent stabilized?
NYC Department of Finance tax bills listed 15 rent-stabilized units here in 2024 (about 100% of its 15 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 104 Linden Boulevard built?
City records list 1901 as the year it was built.
How many apartments are in 104 Linden Boulevard?
It has 15 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.