100 Linden Boulevard
Brooklyn, NY 11226BBL 3-05087-0017Map
Owner of record: 100 Linden Realty LLC
100 Linden Boulevard is an elevator apartment building built in 1935 in Brooklyn, 11226. It has 41 residential units across 6 floors. The owner of record is 100 Linden Realty LLC. HPD has recorded 1,313 housing violations here, most recently on October 5, 2026. 50 of the 50 most recent violations are still open. City tax records listed 41 rent-stabilized apartments here in 2024.
- HPD violations
- 1,313
- DOB violations
- 16
- ECB violations
- 7
- HPD complaints
- 1,003
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1,313
- CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 2nd private hallway from north located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door from north at east wall, 1st door frame from north at east wall, south wall in the foyer located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st private hallway from north located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st base cabinet from east at south wall, 1st door frame from north at east wall in the bathroom located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from north at east wall in the bathroom located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... atless than 10 sqft observed at south wall in the kitchen located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective rotten wood floor in the kitchen located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective the gasket at refrigerator door in the kitchen located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical outlet at south wall in the kitchen located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from north at east wall in the kitchen located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from north located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 4th room from north located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective corroded iron guardrails above exit stair below grade at, northeast section, building front yard at fire passage way
Oct 5, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective cracked masonry treads with missing section at exit stairs below grade at, northeast section, building front yard at fire passage way
Oct 5, 2026
Open — Nov sent out - BHazardous
Fire egress defective. remove the obstruction in fireproof passageway the storage of an iron board , household items ,and construction materials debris in black plastic bags at exit corridor, northwest section, building front yard at fire passage way
Oct 5, 2026
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, ceiling in the 4th room from north located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from west at north wall, 1st door from north at east wall in the 4th room from north located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall, north wall, ceiling in the foyer located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, west wall in the 2nd private hallway from north located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from west at north wall door in the 2nd private hallway from north located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st closet from west at north wall door frame in the 2nd private hallway from north located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, south wall, west wall, ceiling, north wall, east wall, south wall, west wall, ceiling in the kitchen located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from south at west wall, baseboard at north wall, 1st window frame from south at west wall, baseboard at north wall in the kitchen located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from south at west wall, 1st radiator from south at west wall, 1st radiator from south at west wall in the kitchen located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from west at north wall in the bathroom located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north wall, west wall, ceiling in the bathroom located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 4th room from north located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from south at west wall in the 1st room from north located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door, east wall in the foyer located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective regrout the joints between the bathtub and ceramic tiles at walls above in the bathroom located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from east at south wall door frame in the foyer located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak at north wall in the kitchen located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Civ14 mailed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st door frame from west at north wall, 1st closet from north at east wall door frame, 1st window frame from west at north wall, 1st radiator from west at north wall in the 4th room from north located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Civ14 mailed - CImmediately hazardous
Remove the illegal double cylinder key operated locking device at door at, door in the entrance ,north wall, in the 4th room from north located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Civ14 mailed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Civ14 mailed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Civ14 mailed - CImmediately hazardous
Properly repair or replace the broken or defective spring balances at lower sash window to fire escape , 2nd from south at west wall drop hazard in the 1st room from north located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Civ14 mailed - BHazardous
M/d law abate the nuisance consisting of free standing wood door at south wall in the 1st room from north located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Civ14 mailed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations inoperative in the entire apartment located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules inoperative in the entire apartment located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective locking assembly at entrance door , east wall in the foyer located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Civ14 mailed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak at north wall in the bathroom located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Civ14 mailed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak at south wall in the kitchen located at apt 4g, 4th story, 2nd apartment from south at west
Oct 5, 2026 · Apt 4G
Open — Civ14 mailed
DOB building violations · 16
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 3, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 8, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 30, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 27, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 3, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 4, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 29, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 10, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 5, 2007
Dob violation - resolved
Show 6 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Jul 20, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 15, 2004
Dob violation - resolved - Elevator elevatorrequired
3p2567
Sep 7, 2001
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Elevator elevatorrequired
3p2567
Oct 19, 1999
Dob violation - resolved - Elevator elevatorrequired
51-provide access to motor room
Jan 21, 1989
Dob violation - resolved
ECB violations · 7
- Class - 2
16b11,16j1,14j1,12q3,40#7,70#7. (16b)provide "designated lobby" brake tags. (16j)adjust brake tags to ada code height. (14j)adjust for full view of cab. (40,70#)provide keys & info for immediate 24/7 entry to a
Dec 19, 2017
Resolve - Class - 1
At time of insp multiple defects to masonry brick facade at left & right sides and rear exp2,3&4 defects noted at various locations and lvl at above stated exposures observed creaking thru block & joint missing
Feb 11, 2012 · Penalty $1,000
Resolve - Class - 3
Premises is located in a r7-1 residential district at time of insp observed the illegal parking storage of a gray silver 1988 toyota 4 door wagon w/ nys liscense plate no m823fz on concrete paved front yard the
Feb 11, 2012 · Penalty $150
Resolve - Class - 2
14j01,100m07,05j01,39q03,21j01,32j01,40p16,100p16,72p16,15m07,77m07. 14j- adjust. 100m- braille tags on each side of door buck. 05j- eliminate gap. 39q- plank switch. 21j- car stops when 2nd fl door is pulled
Dec 22, 2009 · Penalty $250
Resolve - Non-hazardous
17i,18q.
Apr 5, 1996 · Penalty $1,000
Resolve - Non-hazardous
13m,14m,37l,57o,74m. 74 toe guard.
Nov 29, 1991
Resolve - Non-hazardous
09h,15l,14m,13m,57o,58o,59o,73#,#73 perform 5 year test and file form elv#3
Jan 18, 1991
Resolve
Complaints
- Unsanitary condition
Pests
Oct 19, 2026 · Apt 3B
Open - Heat/hot water
Apartment only
Oct 19, 2026 · Apt 3B
Open - Paint/plaster
Wall
Sep 28, 2026 · Apt 4G
Close - Plumbing
Bathtub/shower
Aug 8, 2026 · Apt 3B
Close - Door/window
Window pane
Aug 6, 2026 · Apt 1D
Close - Water leak
Slow leak
Aug 6, 2026 · Apt 1D
Close - Water leak
Slow leak
Aug 6, 2026 · Apt 1D
Close - Unsanitary condition
Pests
Aug 6, 2026 · Apt 1D
Close - Paint/plaster
Wall
Aug 6, 2026 · Apt 1D
Close - Unsanitary condition
Pests
Aug 6, 2026 · Apt 1D
Close
Show 40 more ↓
- Water leak
Damp spot
Jul 21, 2026 · Apt 1D
Close - Unsanitary condition
Pests
Jul 21, 2026 · Apt 1D
Close - Unsanitary condition
Pests
Jul 21, 2026 · Apt 1D
Close - Door/window
Window frame
Jul 21, 2026 · Apt 1D
Close - Appliance
Refrigerator
Jul 21, 2026 · Apt 1D
Close - Unsanitary condition
Garbage/recycling storage
Jul 13, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jul 13, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Jul 7, 2026 · Apt 3B
Close - Heat/hot water
Apartment only
Jun 26, 2026 · Apt 3B
Close - Plumbing
Bathtub/shower
Jun 23, 2026 · Apt 3B
Close - Unsanitary condition
Pests
Jun 23, 2026 · Apt 3B
Close - Water leak
Heavy flow
Jun 7, 2026 · Apt 4F
Close - Appliance
Electric/gas range
Jun 7, 2026 · Apt 4F
Close - Unsanitary condition
Pests
Jun 7, 2026 · Apt 4F
Close - Paint/plaster
Ceiling
Jun 7, 2026 · Apt 4F
Close - Unsanitary condition
Mold
Jun 7, 2026 · Apt 4F
Close - Heat/hot water
Apartment only
Apr 22, 2026 · Apt 3B
Close - Heat/hot water
Entire building
Apr 22, 2026 · Apt 3B
Close - Heat/hot water
Entire building
Apr 20, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Apr 20, 2026 · Apt 3B
Close - Heat/hot water
Entire building
Apr 8, 2026 · Apt 3B
Close - Unsanitary condition
Pests
Apr 8, 2026 · Apt 3B
Close - Heat/hot water
Apartment only
Apr 8, 2026 · Apt 3B
Close - Heat/hot water
Apartment only
Mar 23, 2026 · Apt 3B
Close - Heat/hot water
Entire building
Mar 23, 2026 · Apt 3B
Close - Heat/hot water
Apartment only
Mar 18, 2026 · Apt 3B
Close - Heat/hot water
Entire building
Mar 18, 2026 · Apt 3B
Close - Heat/hot water
Entire building
Mar 15, 2026 · Apt 3B
Close - Water leak
Heavy flow
Mar 11, 2026 · Apt 1D
Close - Unsanitary condition
Mold
Mar 11, 2026 · Apt 1D
Close - Appliance
Electric/gas range
Mar 11, 2026 · Apt 1D
Close - Appliance
Refrigerator
Mar 11, 2026 · Apt 1D
Close - Door/window
Door
Mar 10, 2026 · Apt 3B
Close - Paint/plaster
Ceiling
Mar 10, 2026 · Apt 3B
Close - Unsanitary condition
Pests
Mar 10, 2026 · Apt 3B
Close - Water leak
Slow leak
Mar 10, 2026 · Apt 3B
Close - Door/window
Door
Feb 26, 2026 · Apt 3B
Close - Water leak
Slow leak
Feb 26, 2026 · Apt 3B
Close - Unsanitary condition
Pests
Feb 26, 2026 · Apt 3B
Close - Plumbing
Water supply
Feb 26, 2026 · Apt 3B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1935
- Floors
- 6
- Residential units
- 41
- Building area
- 41,610 ft²
- Lot area
- 11,250 ft²
- Zoning
- R7-1
- Community board
- 317
- Council district
- 40
- Block / lot
- 5087 / 17
- Assessed value
- $984,600
- Landmark / historic district
- No
HPD registration #302978, last renewed Aug 18, 2025.
Questions about 100 Linden Boulevard
Who owns 100 Linden Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is 100 Linden Realty LLC.
Does 100 Linden Boulevard have violations?
Yes. NYC HPD has recorded 1,313 housing violations at this property.
Is 100 Linden Boulevard rent stabilized?
NYC Department of Finance tax bills listed 41 rent-stabilized units here in 2024 (about 100% of its 41 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 100 Linden Boulevard built?
City records list 1935 as the year it was built.
How many apartments are in 100 Linden Boulevard?
It has 41 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.