83 Stockholm Street
Brooklyn, NY 11221BBL 3-03243-0054Map
Owner of record: Stockholm St Prop LLC
83 Stockholm Street is a walk-up apartment building built in 2018 in Brooklyn, 11221. It has 8 residential units across 4 floors. The owner of record is Stockholm St Prop LLC. HPD has recorded 10 housing violations here, most recently on April 16, 2025. 7 of the 10 most recent violations are still open. City tax records listed 3 rent-stabilized apartments here in 2024.
- HPD violations
- 10
- DOB violations
- 1
- ECB violations
- 9
- HPD complaints
- 19
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 10
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3b, 3rd story, 1st apartment from south at west
Apr 16, 2025 · Apt 3B
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Apr 16, 2025
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3b, 3rd story, 1st apartment from west at north
Apr 12, 2025 · Apt 3B
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system locked door at cellar. at boiler room
Apr 12, 2025
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3b, 3rd story, 1st apartment from south at west
Mar 28, 2025 · Apt 3B
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Mar 28, 2025
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... great than 10 sq. ft. at ceiling in the bathroom located at apt 3b, 3rd story, 1st apartment from south at west
Mar 28, 2025 · Apt 3B
Open — First no access to re- inspect violation - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Mar 28, 2025
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 20, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 20, 2021
Closed — Violation dismissed
DOB building violations · 1
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 31, 2018
Dob violation - dismissed
ECB violations · 9
- Class - 1
Sec. 3307.6.5.10.1 sws daily inspection report. at the time of inspection of an active job site,upon request for daily inspection report(log book)for sidewalk shed created at exp#1. none was provided sws shall
Jul 31, 2018 · Penalty $6,250
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements. as noted: at time of inspection on an active construction site observed at exp#3 construction debris set out in a pile & thru-out the site con
Jun 1, 2018
Resolve - Class - 2
Sec. 3307.3.2 failure to provide lot line. at the time of inspection the contractor was missing construction fence at exp#2,to enclosure there job site & separate it fron adjacent property. remedy: comply w/not
Jan 23, 2018
Resolve - Class - 1
Consturction superintendent failed to perform duties per rule.at time of inspection i observed under the superintendent yisroel ischer therewas unsafe and violating conditions(1)at time of inspection there was
Dec 6, 2017
Resolve - Class - 1
Work does not conform to approved construction documents and/or approved amendments.@ the time of inspection it was noted on the approved drawings that the contractor should install 4 soldier piles at exposure
Dec 4, 2017 · Penalty $250
Resolve - Class - 2
Sec. 3309.1 failure to protect or adequately protect adjoining property during construction or demolition operation. at time of inspection iobserved activity construction site,contractor was doing shoring & exc
Dec 4, 2017
Resolve - Class - 1
Bc3309.6.failure to maintain structures for movement in an direction during excavation related activity that may adversely affect adjoining structures.at time of inspection i noted excavation activity adjacent
Dec 4, 2017 · Penalty $400
Resolve - Class - 1
Failure to safeguarf all persons and property affected by constructionoperations.at time of inspection i noted construction was doing improper shoring and excavation work at exposure 4 resulting in adjacent pro
Dec 4, 2017 · Penalty $1,600
Resolve - Class - 1
Failure to promptly notify the dept of an accident or damage to adjoining property at construction/demolition site. at time of inspection i observed activity construction site,construction was doing shoring &
Dec 4, 2017 · Penalty $1,600
Resolve
Complaints
- Unsanitary condition
Pests
Aug 29, 2025 · Apt 3B
Close - Unsanitary condition
Mold
Aug 29, 2025 · Apt 3B
Close - Unsanitary condition
Mold
Aug 28, 2025 · Apt 3B
Close - Plumbing
Basin/sink
Aug 28, 2025 · Apt 3B
Close - Unsanitary condition
Pests
Aug 28, 2025 · Apt 3B
Close - Heat/hot water
Apartment only
Apr 15, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Apr 11, 2025 · Apt 3B
Close - Unsanitary condition
Mold
Apr 11, 2025 · Apt 3B
Close - Unsanitary condition
Mold
Mar 28, 2025 · Apt 3B
Close - Heat/hot water
Apartment only
Mar 26, 2025 · Apt 3B
Close
Show 9 more ↓
- Unsanitary condition
Mold
Jun 11, 2024 · Apt 1B
Close - Paint/plaster
Wall
Jun 11, 2024 · Apt 1B
Close - Water leak
Damp spot
Jun 11, 2024 · Apt 1B
Close - Unsanitary condition
Mold
Feb 1, 2024 · Apt 1B
Close - Water leak
Damp spot
Feb 1, 2024 · Apt 1B
Close - Paint/plaster
Wall
Feb 1, 2024 · Apt 1B
Close - Water leak
Slow leak
May 23, 2023 · Apt 1B
Close - Water leak
Damp spot
May 23, 2023 · Apt 1B
Close - Electric
Power outage
Dec 20, 2020 · Apt 1B
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Feb 26, 2026 | $4,100,000 | Rentals - walkup apartments | 8 |
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 2018
- Floors
- 4
- Residential units
- 8
- Building area
- 5,760 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6
- Community board
- 304
- Council district
- 34
- Block / lot
- 3243 / 54
- Assessed value
- $580,950
- Landmark / historic district
- No
HPD registration #388899, last renewed Apr 2, 2026.
Questions about 83 Stockholm Street
Who owns 83 Stockholm Street?
The owner of record in NYC Department of City Planning PLUTO data is Stockholm St Prop LLC.
Does 83 Stockholm Street have violations?
Yes. NYC HPD has recorded 10 housing violations at this property.
Is 83 Stockholm Street rent stabilized?
NYC Department of Finance tax bills listed 3 rent-stabilized units here in 2024 (about 38% of its 8 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 83 Stockholm Street built?
City records list 2018 as the year it was built.
How many apartments are in 83 Stockholm Street?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.