81 Stockholm Street
Brooklyn, NY 11221BBL 3-03243-0055Map
Owner of record: Stockholm St Prop LLC
81 Stockholm Street is a walk-up apartment building built in 1931 in Brooklyn, 11221. It has 8 residential units across 4 floors. The owner of record is Stockholm St Prop LLC. HPD has recorded 37 housing violations here, most recently on July 31, 2026. 32 of the 37 most recent violations are still open.
- HPD violations
- 37
- DOB violations
- 3
- ECB violations
- 6
- HPD complaints
- 11
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 37
- CImmediately hazardous
Properly repair with similar material the broken or defective wood thread, 5th from bottom at public hall stairs, 2nd story
Jul 31, 2026
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked at cellar at boiler room
Jul 25, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4b, 4th story, 1st apartment from north at east
Jul 25, 2026 · Apt 4B
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing frame at public hall, 1st story
Jul 13, 2026
Open — Nov certified on time - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 3b, 3rd story, 1st apartment from south at west
Jul 13, 2026 · Apt 3B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3b, 3rd story, 1st apartment from south at west
Jul 13, 2026 · Apt 3B
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 3b, 3rd story, 1st apartment from south at west
Jul 13, 2026 · Apt 3B
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor entrance , 1st story
May 6, 2026
Open — Nov sent out - CImmediately hazardous
Remove device preventing door from being self-closing kickdown stopper at building entrance , 1st story
May 6, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 2, 2022
Closed — Violation dismissed
Show 27 more ↓
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 13, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 13, 2021
Closed — Violation dismissed - ANon-hazardous
Provide a peep hole in entrance door of the dwelling unit so located as to permit a person inside the dwelling unit to view any person outside entrance door to 3rd story apt. 3.
Sep 29, 2005
Open — Nov sent out - BHazardous
Repair by closing so as to be gas tight all openings in the waste pipe kitchen sink, 2nd story apartment 2.
Sep 29, 2005
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of refrigerator 2nd story public hall.
Sep 29, 2005
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures kitchen & bathroom, 2nd story apartment 2.
Sep 29, 2005
Open — Nov sent out - CImmediately hazardous
Repair the leaky and/or defective faucets kitchen sink 2nd story apartment 2. er1
Sep 29, 2005
Open — Nov sent out - ANon-hazardous
Properly repair the broken or defective window sash & frame throughout 2nd story apt. 2.
Sep 29, 2005
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceiling throughout 3rd story apt. 3.
Sep 29, 2005
Open — Nov sent out - BHazardous
Replace with new the broken or defective glass lower sash front & bathroom, 2nd story apt. 2.
Sep 29, 2005
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department wall and ceiling throughout 3rd story apt. 3.
Sep 29, 2005
Open — Nov sent out - BHazardous
Abate the nuisance consisting of exposed electric wiring north wall bathroom, 3rd story apt.
Sep 29, 2005
Open — Nov sent out - BHazardous
Properly repair the broken or defective ceiling light fixture 3rd story public hall.
Sep 29, 2005
Open — Nov sent out - BHazardous
Replace with new the broken or defective glass panel entrance door to apt. 3rd story apt. 3.
Sep 29, 2005
Open — Nov sent out - BHazardous
Properly repair the broken or defective mail box vestibule 1st story public hall.
Sep 29, 2005
Open — Nov sent out - BHazardous
Properly repair the broken or defective ceiling light fixture 3rd story apt. 3, kitchen.
Sep 29, 2005
Open — Nov sent out - BHazardous
Replace with new the broken or defective glass lower sash east window front room, 3rd story apt. 3.
Sep 29, 2005
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color wall and ceiling throughout 2nd story apartment 2.
Sep 29, 2005
Open — Nov sent out - BHazardous
Replace with new the missing receptacle plate for wall outlet 3rd. sty. apt. bathroom.
Sep 29, 2005
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceiling 3rd. sty. apt. bathroom.
Sep 29, 2005
Open — Nov sent out - BHazardous
Abate the nuisance consisting of exposed wires north east rear room 3rd. sty. apt. ceiling.
Sep 29, 2005
Open — Nov sent out - BHazardous
Abate the nuisance consisting of peeling paint ceiling north east rear room 3rd. sty. apt.
Sep 29, 2005
Open — Nov sent out - ANon-hazardous
Repair by closing so as to be gas tight all openings in the waste pipes under kitchen sink, 3 sty apt. 3.
Sep 29, 2005
Open — Nov sent out - BHazardous
Properly secure the loose thermostat at wall 3rd. sty apt 3 2nd. room from front.
Sep 29, 2005
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin roaches kitchen 3rd. sty apt. 3.
Sep 29, 2005
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak front & rear room, 2nd story apartment 2.
Sep 29, 2005
Open — Nov sent out - BHazardous
Replace with new the missing wall tiles bathroom, 2nd story apartment 2.
Sep 29, 2005
Open — Nov sent out
DOB building violations · 3
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 4, 2012
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 30, 2011
Dob violation - dismissed - Construction other optional
The borough commissioner has issued a 15 day letter of intent to revoke application#320398627 on 09-29-11. sidewalk shed is in place remedy; stop all work make site safe contact dob
Oct 11, 2011
Dob violation - dismissed
ECB violations · 6
- Class - 1
Failure to institute/maintain safety equipment measures or temporary construction-no guardrails or handrails. at time of inspection i observed-active construction site rar stairs going down to cellar there was
Dec 6, 2017
Resolve - Class - 2
Sec. 3301-02 construction superintendent failed to maintain &/or make job site log-in book available. at time of inspection i observed an active construction site w/underpinning work being done in cellar during
Dec 6, 2017
Resolve - Class - 2
Failure to comply w/the commissioner's order to file a c of c w/the dept of buildings for notice of violation #34933778r issued on 1/11/12 pursuant to 28-204.4 & 1rcny 102-01. for failure to maintain front
Sep 12, 2012 · Penalty $2,000
Resolve - Class - 1
Failure to maintain.noted:front brick parapet wall in diro disrepair-w.4 loose,missing mortar & bricks etc.remedy:correct conditins cited in nov.
Jan 11, 2012 · Penalty $5,000
Resolve - Class - 2
Failure to comply w/the commissioner's order to file a c/c w/the dob for nov #34924966j issued on 9.3.11 pursuant to 28-204.4 & 1rcny 102-01. remedy: file a c/c.
Jan 11, 2012 · Penalty $2,000
Resolve - Class - 1
Failure to maintain building wall & appurtenances. noted at front of premises the entire parapet with corner has fallen to sidewalk. also noted missing mortar in various locations thru out premises. remedy:
Sep 3, 2011 · Penalty $1,000
Resolve
Complaints
- Appliance
Electric/gas range
Jul 29, 2026 · Apt 4B
Close - Electric
Outlet/switch
Jul 29, 2026 · Apt 4B
Close - Heat/hot water
Apartment only
Jul 24, 2026 · Apt 4B
Close - Appliance
Electric/gas range
Jul 24, 2026 · Apt 4B
Close - Electric
Power outage
Jul 10, 2026 · Apt 3B
Close - Appliance
Electric/gas range
Jul 10, 2026 · Apt 3B
Close - Electric
Power outage
Jun 26, 2026 · Apt 4B
Close - Electric
Power outage
Jun 26, 2026 · Apt 2A2F
Close - Door/window
Door
Apr 18, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Dec 27, 2022 · Apt BLDG
Close
Show 1 more ↓
- Unsanitary condition
Sewage
Sep 3, 2021 · Apt 4AGREE
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Feb 26, 2026 | $4,100,000 | Rentals - walkup apartments | 8 |
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1931
- Floors
- 4
- Residential units
- 8
- Building area
- 5,714 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6
- Community board
- 304
- Council district
- 34
- Block / lot
- 3243 / 55
- Assessed value
- $690,750
- Landmark / historic district
- No
HPD registration #388900, last renewed Apr 2, 2026.
Questions about 81 Stockholm Street
Who owns 81 Stockholm Street?
The owner of record in NYC Department of City Planning PLUTO data is Stockholm St Prop LLC.
Does 81 Stockholm Street have violations?
Yes. NYC HPD has recorded 37 housing violations at this property.
Is 81 Stockholm Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 81 Stockholm Street built?
City records list 1931 as the year it was built.
How many apartments are in 81 Stockholm Street?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.