191 South 3 Street
Brooklyn, NY 11211BBL 3-02419-0001Map
Owner of record: NYC Department Of Education
191 South 3 Street is a school building built in 1920 in Brooklyn, 11211. The owner of record is NYC Department Of Education. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 11
- ECB violations
- 54
- HPD complaints
- 1
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 11
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)
Oct 10, 2021
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2019
Jun 29, 2020
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed
Show 1 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed
ECB violations · 54
- Class - 2
Failure to maintain building in code compliant manner.at the time of inspection observed and noted fpsc doors are not closing properly for difective hardware or door closure or hinge at 1st floor auditorium mai
Jun 3, 2026 · Penalty $1,250
Active - Class - 2
Reissue#35717122y date of issue:04.21.2025 exit door outside main exitnot self closing properly at the time of inspection observed and noted1st floor exit b one outside main exit door,at first floor exit 6 one
Jun 3, 2026 · Penalty $1,562
Active - Class - 2
Reissue#35717123 date of issue:04.21.2025 failure to maintain buildingin code-compliant manner.illumination for exits,exit discharges and public corridors per bc 1006.1;27-381.at the time of inspection observed
Jun 3, 2026 · Penalty $3,125
Active - Class - 2
Failure to maintain building in code-compliant manner: illumination for exits, exit discharges and public corridors per bc 1006.1; 27-381. at the time of inspection observed and noted that at 1st fl auditorium
Apr 21, 2025 · Penalty $1,250
Active - Class - 2
Exit door not self-closing properly at the time of inspection at the time of inspection observed and noted at 1st fl. auditorium at main ent. 3 exit doors not self-closing properly at the time of inspection. at
Apr 21, 2025 · Penalty $625
Resolve - Class - 2
Reissue:35317022y-failure to maintain bldg in code-compliant manner:atbulkhead stair d walls have water damage crack concrete.rem:comply with code.
Mar 30, 2022 · Penalty $1,562
Resolve - Class - 2
Reissue#35467642z failure to maintain bldg in code compliant manner. stair d bulkhead cracks on masonry & in side walls. remedy: repair &/orreplace.
Apr 1, 2021 · Penalty $1,562
Resolve - Class - 3
Bc 406.7.1 open lot w/ illumination shining on adjacent building(180 s3 st) contrary to bc 406.7.10.3. as noted lights are shining onto bldgacross the street at 180 s 3 st. lights not properly angled/shielded.
Oct 31, 2020 · Penalty $500
Resolve - Class - 2
Reissue#35386525p failure to maintain bldg in code compliant manner. noted: at stair d bulkhead observed cracks on masonry wall. remedy: repair &/or replace.
Feb 10, 2020 · Penalty $1,562
Resolve - Class - 2
Failure to maintain building in code compliant manner notd: 4th and 5th flr stair d, 3rd floor hallway double door (near gym) gym door base ment stair f(exterior door) 1st fl stair f (exterior door) are in disr
Feb 15, 2019
Resolve
Show 40 more ↓
- Class - 2
Reissue #35317019n failure to maintain building in code compliant manner lack of emergency lighting for exits, exit discharges and pub lic corridors per bc 1006.1; 27-542 noted: at gym emergency lights in
Feb 15, 2019
Resolve - Class - 2
Reissue: 35317022y failure to maintain building in code compliant manner noted: at bulkhead stair d vertical masonry in wall with horizontal crack in concrete at the beam also noted at stair a 3rd floor ceilin
Feb 15, 2019
Resolve - Class - 2
Failure to maintain bldg in code complaint manner. lack of emergency lighting for exits,exit discharger & public corridors per bc 1006.1;27-542. noted: at cafeteria area & gym area,inoperative emergency lights
Feb 9, 2018
Resolve - Class - 2
Failure to maintain bldg in code complaint manner. noted: at room#214,217,218,307,308. the doors have defective in the top hinge & not operate properly. remedy: comply w/code/repair or replace.
Feb 9, 2018
Resolve - Class - 2
Failure to maintain bldg in code complaint manner. noted: at bulkhead stair'd',vertical cracked masonry in the wall. also observed horizontal cracked concrete in the beam. remedy: comply w/code/repair the crack
Feb 9, 2018
Resolve - Class - 2
Failure to maintain bldg in code complaint manner. floor numbering signs missing &/or defective per bc 1019.1.7(2008 code);27-392 & bc 1022.8(2014 code). noted: at staircase'b'&'c',at 1st,2nd,3rd & 4th fl missi
Feb 9, 2018
Resolve - Class - 2
Failure to maintain bldg in code-compliant manner. at fire stairs from3rd flr up to 5th flr contains framed and flammable frames and artworkrmdy: remove from stairways.
Feb 5, 2015
Resolve - Class - 2
Reissue #34941044h water penetration -0 exterior wall at 3rd floor room 304, the exterior brick masonry facade has become porous allowingwater to penetrate into classroom. rmdy: water proof exterior masonry
Apr 29, 2013
Resolve - Class - 2
Doors not self closing. at gjy, exit doors adjacent to room 321 and strway d are missing door closers. rmdy: replace door closers so doors properly self close.
Apr 29, 2013
Resolve - Class - 2
Reissue # 34934263m. weather penetration of facade noted: brick facade pourous allowing water to penetrate into room 304 and damage plaster. remedy: repair defect noted.
Jan 5, 2012
Resolve - Class - 2
Vertical crack in plaster at: south east corner 1st story plaster cracked from ceiling down approx 5 l.f. & 1/2" wide. remedy: repair crack.
Jan 5, 2012
Resolve - Class - 2
Reissue # 34743852z. side yard occupied as parking lot at: west side yard play yard converted to parking lot & occupied by approx 25 motor vehicles. remedy: discontinue illegal use.
Jan 5, 2012
Resolve - Class - 2
Doors not closing at: stair e doors at 5th,3rd,2nd & 1st floors, stair a exit discharge door 1st story, roebling street exit discharge door (near south 3rd street), stair d interior vestibule 1st story. remedy
Jan 5, 2012
Resolve - Class - 2
Exterior brick facade has become porous and allowing rain into room 304 causing interior damages. remedy : water - proof exterior brick facade
Oct 6, 2011
Resolve - Class - 2
Exterior exit doors does not open & close properly located @ exit a & d on the 1st fl level ( noted: doors are out of plumb and causing doors not to open & close properly ) remedy: repair doors
Oct 6, 2011
Resolve - Class - 2
Occupancy contrary to bldg dept records noted: school yard at west side of bldg entire occupied as parking lot approx 50 vehicles. evident signs of basketball courts. remedy: discontinue illegal use!
Apr 22, 2009
Resolve - Hazardous
Re-issue:34505379z. corridor smoke doors are not self-closing located on the 3rd floor. remedy: repair corridor smoke doors so they self close.
Mar 20, 2007
Resolve - Hazardous
Re-issue:34505377p (partial). plaster is spalling from the ceiling andwall above the windows located in room 507 on the 5th floor. remedy: repair wall & ceiling.
Mar 20, 2007
Resolve - Hazardous
Third floor, corridor smoke stop door near stair d is not closing (hitting floor). remedy: shim door to clear floor or cut door botoom.
Jan 6, 2006
Resolve - Hazardous
First floor, cafeteria kitchen exit door is inoperative, unable to open. remedy: repair/replace door.
Jan 6, 2006
Resolve - Hazardous
Plaster ceiling above windows in class rooms 507 and 518 are damaged. also noted: third floor gymnasium bathroom plaster ceiling has 2 holes(approx. each 1 foot diameter) next to ceiling light. remedy: repair/
Jan 6, 2006
Resolve - Hazardous
Reissue: #34467014l exit passageway or corridor required width decreased by obstructions. noted: third floor gymnasium passage at dean's office blocked by 3 desks. third floor stairwell blocked by tv/ stand,
Jan 6, 2006
Resolve - Non-hazardous
Noted: fifth floor corridor smoke/fire doors between classrooms #509 and 511 are defective (broken, missing, defective pivot pins) doors do not swing and close. remedy: repair doors, maintain proper door operat
Mar 8, 2005
Resolve - Non-hazardous
Noted: failure to provide/maintain required fire-stopping at: 1) boiler room 2) electric meter room -wall penetrations above doors not properly fire-stopped. remedy: provide/maintain required fire-stopping.
Mar 8, 2005
Resolve - Non-hazardous
Noted: exit passage required width decreased by obstructions at: 1) gymnasium exit #7 passageway wooden box stands and equipment. 2) stairway "e"-tables. 3) auditorium passage "f" - stands, equipment, chairs,
Mar 8, 2005
Resolve - Hazardous
Noted: basement exit doors (near/adjacent to stair exit "f") are inoperative (unable to open)- roebling st. remedy: remove obstruction, maintain exit doors.
Mar 8, 2005
Resolve - Non-hazardous
Noted: slide bolts installed are not secured in open position at: 1) main entry doors along south 3 st. 2) basement roebling st exit doors. 3) exit door #1 (first floor). 4) exit #2 (first floor) remedy: remove
Mar 8, 2005
Resolve - Non-hazardous
B4a/16/19b/24b/36(teledyne lears hot water boiler)
May 5, 2004 · Penalty $2,500
Resolve - Non-hazardous
B4a/50/58a 50-both pressure contolas piped to boiler at the same 1/4 syphon loop 50a-front rt cirulator flange gaskets leaking
May 5, 2004 · Penalty $2,500
Resolve - Non-hazardous
B4a/50 50-both pressure contorls piped to boiler at the same 1/4 syphon loop
May 5, 2004 · Penalty $2,500
Resolve - Non-hazardous
B4a/50 50 both pressure controls piped to boiler at the same 1/4 syphon loop
May 4, 2004
Resolve - Non-hazardous
Failure to maintain note roof leaks in gymmasium and kitchen .remedy:repair roof
Mar 24, 2004
Resolve - Non-hazardous
Use of illegal hardware.note key lock cylinder installed on auditorium north side exit door (next to exit #7)occupancy #512.remedy:remove illegal hardware
Mar 24, 2004
Resolve - Non-hazardous
Failure to use panic hardware where required by law auditorium occupancy # 512 no panic hardware install on north side exit door (next to exit # 7)remedy:provide panic hardware.
Mar 24, 2004
Resolve - Non-hazardous
Panic hardware inoperative. defects is auditorium occupancy # 512. audtorium n/e side exit door panic hardware handle is broken and inoperative. remedy : repair and / or replace panic hardware
Mar 24, 2004
Resolve - Non-hazardous
Failure to maintain. noted bathroom stall partitions, rusted, corrddedmissing doors locations boys bathrooms at 1, 2, 3, 4 & 5 floors remedy: maintain / replace bathroom stall partiions
Mar 31, 2003
Resolve - Non-hazardous
Failure to provide panic hardware where required by law. location gym - at exit 7 ( 2 doors ) occ 589 auditorium - 3 doors off stage area occ 512 remedy : provide panic hardware where required
Mar 31, 2003
Resolve - Hazardous
Failure to maintian : defects : cracked, loose, detached cementious ceilings in danger of falling. locations : 418, 204, 203, 205, 210, 219, 123, 121, exit to lot adjacent rm 102 remedy : make safe do repairs
Apr 24, 2002
Resolve - Hazardous
Failure to maintian : defects : cracked, loose, exterior parapet masonry wall locations : rear over court yard and parking lot. remedy : make safe do repairs
Apr 24, 2002
Resolve - Non-hazardous
Failure to maintain building defects are damaged walls and ceilings in room 510,504,408,411,418,318,203,210,207,205,224,304,203,178,115 and 223.remedy:do repairs immediately.
Mar 27, 2001
Resolve
Complaints
- Heating
Heat related
Jan 27, 2004 · Apt 1D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- School building (W1)
- Year built
- 1920
- Floors
- 5
- Residential units
- —
- Building area
- 162,600 ft²
- Lot area
- 48,840 ft²
- Zoning
- R6
- Community board
- 301
- Council district
- 34
- Block / lot
- 2419 / 1
- Assessed value
- $8,191,800
- Landmark / historic district
- No
Questions about 191 South 3 Street
Who owns 191 South 3 Street?
The owner of record in NYC Department of City Planning PLUTO data is NYC Department Of Education.
Does 191 South 3 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 191 South 3 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 191 South 3 Street built?
City records list 1920 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.