202 South 2 Street
Brooklyn, NY 11211BBL 3-02419-0019Map
Owner of record: 202 South 2nd Street LLC
202 South 2 Street is a walk-up apartment building built in 1910 in Brooklyn, 11211. It has 41 residential units across 6 floors. The owner of record is 202 South 2nd Street LLC. HPD has recorded 566 housing violations here, most recently on July 25, 2026. 3 of the 50 most recent violations are still open. City tax records listed 15 rent-stabilized apartments here in 2024.
- HPD violations
- 566
- DOB violations
- 17
- ECB violations
- 36
- HPD complaints
- 691
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 566
- BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at east yard stack at fire escape, 4th story
Jul 25, 2026
Open — Nov certified on time - BHazardous
Provide wash basin in the bathroom located at apt 24, 4th story, 1st apartment from east at south
Jul 20, 2026 · Apt 24
Open — Civ14 mailed - BHazardous
Remove all encumbrances consisting of garbage cans at public hall, 1st story
Oct 30, 2025
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st riser from north at east wall in the room located at apt 26
Sep 22, 2025 · Apt 26
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from north at east wall in the room located at apt 26
Sep 22, 2025 · Apt 26
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 2nd window frame from west at north wall in the room located at apt 26
Sep 22, 2025 · Apt 26
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east at south located at apt 26, 5th story, 1st apartment from north at east
Sep 15, 2025 · Apt 26
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from east at north located at apt 26, 5th story, 1st apartment from north at east
Sep 15, 2025 · Apt 26
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective intercom return panel at east wall in the foyer located at apt 3, 1st story, 2nd apartment from east at south
Sep 14, 2025 · Apt 3
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of lockable knob at door leading to fire escape in the 1st room from north located at apt 26, 5th story, 1st apartment from north at east
May 28, 2024 · Apt 26
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 26, 5th story, 1st apartment from north at east
May 28, 2024 · Apt 26
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from east located at apt 26, 5th story, 1st apartment from north at east
May 28, 2024 · Apt 26
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the cieling and east wall in the bathroom located at apt 34, 6th story, 1st apartment from north at east
May 21, 2024 · Apt 34
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over the cieling in the bathroom located at apt 34, 6th story, 1st apartment from north at east
May 21, 2024 · Apt 34
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch in the entrance located at apt 25, 4th story, 2nd apartment from north at east
May 21, 2024 · Apt 25
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 18, 3rd story, 2nd apartment from north at east
May 21, 2024 · Apt 18
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 18, 3rd story, 2nd apartment from north at east
May 21, 2024 · Apt 18
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 18, 3rd story, 2nd apartment from north at east
May 21, 2024 · Apt 18
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch in the entrance located at apt 25, 4th story, 2nd apartment from north at east
May 21, 2024 · Apt 25
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 11, 2nd story, 2nd apartment from north at east
Apr 16, 2022 · Apt 11
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of cabinets and counter top installed at window to fire escape in the kitchen located at apt 11, 2nd story, 2nd apartment from north at east
Apr 16, 2022 · Apt 11
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 11, 2nd story, 2nd apartment from north at east
Apr 16, 2022 · Apt 11
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at cellar
Apr 16, 2022
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 11, 2nd story, 2nd apartment from north at east
Apr 16, 2022 · Apt 11
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 11, 2nd story, 2nd apartment from north at east
Apr 16, 2022 · Apt 11
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 11, 2nd story, 2nd apartment from north at east
Apr 16, 2022 · Apt 11
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 2nd stack from east at north building front at fire escape, 6th story
Mar 23, 2022
Closed — Violation closed - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing ; the missing brackets at gooseneck ladder at roof at west
Feb 7, 2022
Closed — Violation dismissed - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing ; the missing brackets at gooseneck ladder at roof at east
Feb 7, 2022
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes ; the flower pots at 6th story balcony at fire escape at west
Feb 7, 2022
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes ; the flower pots at 2nd story balcony at fire escape at east
Feb 7, 2022
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes ; the flower pots at 3rd story balcony at fire escape at east
Feb 7, 2022
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes ; the flower pots at 4th story balcony at fire escape at east
Feb 7, 2022
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective to roof at bulkhead at public hall, 6th story
Feb 7, 2022
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at east wall at bulkhead at public hall, 6th story
Feb 7, 2022
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of rubbish at public hall, 1st story
Feb 7, 2022
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall at bulkhead at public hall, 6th story
Feb 7, 2022
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from north at center located at apt 24, 4th story, 1st apartment from east at south
Oct 19, 2021 · Apt 24
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north at center located at apt 24, 4th story, 1st apartment from east at south
Oct 19, 2021 · Apt 24
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, west wall in the 3rd room from north at east located at apt 24, 4th story, 1st apartment from east at south
Oct 19, 2021 · Apt 24
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall in the 3rd room from north at east located at apt 24, 4th story, 1st apartment from east at south
Oct 19, 2021 · Apt 24
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar
Oct 8, 2021
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 17, 3rd story, 1st apartment from east at south
Oct 8, 2021 · Apt 17
Closed — Violation closed - BHazardous
Provide dwelling with a janitor or responsible person or janitorial service.
Sep 22, 2021
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of rodents rats at basement
Sep 22, 2021
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at south yard
Sep 22, 2021
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 3, 1st story, 2nd apartment from east at south
Sep 20, 2021 · Apt 3
Open — Violation will be reinspected - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from north at west located at apt 3, 1st story, 2nd apartment from east at south
Sep 20, 2021 · Apt 3
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1, 1st story, 2nd apartment from north at east
Sep 20, 2021 · Apt 1
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from north located at apt 1, 1st story, 2nd apartment from north at east
Sep 20, 2021 · Apt 1
Closed — Violation dismissed
DOB building violations · 17
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2024
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 4, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 11, 2015
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed
Show 7 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Construction other optional
C-construction other optional
Nov 17, 1993
Vh*-violation hazardous dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed - Construction other optional
C-construction other optional
Dec 6, 1989
Dob violation - dismissed
ECB violations · 36
- Class - 2
Covers missing on electrical box,need correct support for piping,missing clean out at base of chimney,valve missing on oil suction line,top of oil tnk,correct violation,& send in certificate of correction
Nov 22, 2021 · Penalty $312
Resolve - Class - 2
Gas piolit is not hard pipe to regulator/safety valves missing body drain discharge pipes/no door at base of chimney; correct violation and submit the certificate of correction
Jun 25, 2021 · Penalty $625
Resolve - Class - 2
Occupancy contrary to that allowed by c of o & dob records.partitions erected creating illegal use of rooms for living in cellar.full bathr oom present completed with water-closet,wash basin,& bathtub.inadequa
May 20, 2016 · Penalty $1,200
Resolve - Class - 2
Failure to comply w/ the comm's order to file a cert of correction w/ the dept of bldg for ecb violations #35041181r,35038747j,35103282r,35038748l & #35058649y.rem:file a cert of correction.
Dec 10, 2014 · Penalty $2,000
Resolve - Class - 2
Failure to maintain bldg in code compliant manner:no fire stopping perbc712.3;27-345.noted:observed @ time of insp @ several locations @ cellar ceiling the fire stopping was(uisping)observed also premises insta
Dec 10, 2014 · Penalty $530
Resolve - Class - 1
Occupancy contrary to tha tallowed by cofo and dob records class"a" apartment created at celalr partitions erected creating use of rooms for living. full kitchen with kitchen sink and gas range also.bathroom
Dec 10, 2014 · Penalty $2,400
Resolve - Class - 1
Occupancy contrary to that allowed by the bldg dept records.bldg dept records indicates premises to be legally approved for(41)class"a"units.(6apts on 1st fl & 7 apts from 2nd to 6th fl for each fl)now premises
Dec 10, 2014
Resolve - Class - 2
Electrical work w/o permit.work noted;observed @ time of insp @ 9:30amongoing new electrical work @ public hallway of the bldg @ all(6)fl.premises installting new electrical bx cables & box's for nre lighting @
Dec 10, 2014 · Penalty $400
Resolve - Class - 2
Work w/o permit:work noted:@ cellar level installed full height partitions walls for(5)rooms creating an apt.installed water & waste lines for(3)piece bathroom & residential sink @ kitchen.installed new electri
Dec 10, 2014
Resolve - Class - 2
Failure to maintain bldg code-compliant manner.noted:@ cellar level observed a class"a"apt w/(3)bedrooms.one of the(3)bedrooms has no window.all bedrooms required natural light & ventilation.@ 1st fl on the pub
Dec 10, 2014 · Penalty $1,250
Resolve
Show 26 more ↓
- Class - 2
Failure to comply w/ the comm's order to file a cert of correction w/ the dept of bldg for notice of violation #35108050k issued on 09/10/14pursuant to 28-204.4 & 1rcny 102-01.failure to provide unobstructed ex
Nov 7, 2014 · Penalty $4,000
Resolve - Class - 1
Failure to comply w/the comm'nrs order contained in nov #35103282r issued on 7/31/14 work w/o a permit at roof level using electrical hoist to move materials from ground level up 6 stories to roof.remedy:comply
Nov 7, 2014 · Penalty $800
Resolve - Class - 1
Failure to provide unobstructed exit passageway.@ time of insp.noted @ exp.1 right side a/c units on 4th,5th & 6th fl exp.2:a/c unit @ 3rd fl plant @ 4th fl @ exp.3:a/c on 1st fl/@ exp.4:a/c on 1st fl.all items
Sep 10, 2014 · Penalty $3,000
Resolve - Class - 2
Failure to comply w/the commissioner's order to file a c of c w/the dept of buildings for notice of violation #35103284k issued on 7/31/14 pursuant to 28-204.4 & 1rcny 102-01. failure to provide unobstructed
Sep 10, 2014
Resolve - Class - 1
Failure to maintain noted: at roof level sections of roof joist are rotted & sagging & separating from parapet section front side also masonry structure (parapet) in that area is deteriorated & bowing outward.
Jul 31, 2014 · Penalty $800
Resolve - Class - 1
Failure to provide unobstruction exit passagewaynoted at rear side escapes obstructed w/plants,house hold items & a/c unit. remedy: remove obstructions.
Jul 31, 2014 · Penalty $1,000
Resolve - Class - 1
Work w/o a permit. noted at roof level installation of scaffolding w/electric hoist attached used for materials from ground level hoisting 6 stories to roof no anchor or support details provided section 2 rows
Jul 31, 2014 · Penalty $800
Resolve - Class - 2
Unapproved unsafe unsiotable electrical equipment devices materials appliances or wiring in use. flexible cords use throughout apt 25 all permanent wiring. remedy: comply w/ec code.
Feb 25, 2014 · Penalty $800
Resolve - Class - 2
Unapproved unsuitable unsafe electrical equipment devices materials appliances or wiring in use. defective outlets & fixture wiring throughout apt #25. remedy: comply w/ec code.
Feb 25, 2014 · Penalty $800
Resolve - Hazardous
Supervision of rigging equipment w/o a special riggers license (workers using a scaffold to brick point facade of bldg w/o riggers license on site) workers & supt. couldn't give any information of who was doing
Mar 30, 2006 · Penalty $500
Resolve - Hazardous
No guard rail (center board) on a 2 point suspension scaffold. (workers on scaffold brick pointing with no center nail)
Mar 30, 2006 · Penalty $750
Resolve - Hazardous
No sidewalk shed. (workers while repairing facade of bldg had no side walk shed to protect public instead they taped off sidewalk w/o propersidewalk closure permit
Mar 30, 2006 · Penalty $2,000
Resolve - Hazardous
Failure to maintain.defects are plain glass installed at skylight at public stairway at roof.also no safety screen below skylight at bulkhead.bulkhead due to watch damage.remedy:repair maintain and replace glas
Mar 10, 2000
Resolve - Hazardous
Failure to maintain exterior building wall: defect is: eroded motor joints & loose brickwork on facade at parapet wall, loose coping & cracked tar paper with over lapping coping at various locations on roof par
Apr 21, 1994 · Penalty $2,000
Resolve - Non-hazardous
Failure to maintain exterior building wall: defects eroped motor jointand loose brickwork on facade at parapet wall, loose coping and crack-ed tar paper and over lapping coping at various locations on roof and
Mar 23, 1994 · Penalty $800
Resolve - Hazardous
Failure to maintain exterior building wall: defect is : ereoded motor joints and loose brick work on facade at parapet wall loose coping andcracked tar papers and over lapping coping at various locations on roo
Feb 24, 1994 · Penalty $2,000
Resolve - Hazardous
Failure to maintain: exterior building wall: defectis eroded mortar joints and loose brick work on facade at parapet wall, loose coping & cracked tar papaer and over lapping coping at various locations on roo
Jan 25, 1994 · Penalty $2,000
Resolve - Hazardous
Failure to maintain: exterior building wall: defects are: eroded mortar joints & loose brickwork on facade, at parapet wall, loose coping & cracked tar paper and over lapping coping at various locations on roof
Dec 6, 1993 · Penalty $800
Resolve - Non-hazardous
Failure to maintain exterior building wall (defect is) (1) approx 2*6 feet section of face bricks above 6th floor window at n/e corner of building has collapsed, leaving a 6 foot decorative stone loose and in d
Mar 5, 1993 · Penalty $800
Resolve - Hazardous
Failure to maintain exterior building wall (defect is) (1) eroded mortar joints and loose bricks on entire facade and chimney. (2) loose & missing coping on parapet wall westside. remedy:provide public protecti
Mar 5, 1993
Resolve - Non-hazardous
Work without a permit. suspended ceiling erected in first floor store contrary to rs 5-16 remedy: obtain necessary permits or return premises to prior legal
Dec 6, 1989
Resolve - Non-hazardous
Work without a permit. erection of partitions creating kitchen area and bathroom at rear of store. remedy: obtain necessary permits or restore premises.
Dec 6, 1989
Resolve - Non-hazardous
Failure to provide ventilation for a bathroom at rear of store on 1st floor.
Dec 6, 1989
Resolve - Hazardous
Failure to maintain. excessive erosion of mortar on parapet wall on various areas of east wall. remedy: make necessary repairs to the satisfaction of this dept.
Dec 6, 1989
Resolve - Hazardous
Failure to maintain. loose threads and handrail on exterior steel stairs leading to backyard. remedy: make necessary repairs to the satisfaction of this department.
Dec 6, 1989
Resolve - Hazardous
Failure to maintain. fire rating missing on ceiling in front of storeon first floor. also, fire rating missing on ceiling of bathroom at rear of store. remedy: make necessary repairs the satisfaction.
Dec 5, 1989
Resolve
Complaints
- Plumbing
Basin/sink
Jul 10, 2026 · Apt 24
Close - Plumbing
Basin/sink
Jun 24, 2026 · Apt APT24
Close - Heat/hot water
Entire building
Oct 29, 2025 · Apt 35
Close - General
Bell/buzzer/intercom
Aug 30, 2025 · Apt 3
Close - Unsanitary condition
Pests
Oct 20, 2024 · Apt 15
Close - Paint/plaster
Ceiling
Sep 28, 2023 · Apt 25
Close - Paint/plaster
Wall
Sep 28, 2023 · Apt 25
Close - Water leak
Damp spot
Sep 28, 2023 · Apt 25
Close - Electric
Wiring
Sep 28, 2023 · Apt 25
Close - Flooring/stairs
Floor
Sep 28, 2023 · Apt 25
Close
Show 40 more ↓
- Electric
Lighting
Sep 28, 2023 · Apt 25
Close - Heat/hot water
Entire building
Oct 4, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 6, 2022 · Apt BLDG
Close - Flooring/stairs
Floor
Jun 10, 2022 · Apt 26
Close - Door/window
Door
Jun 10, 2022 · Apt 26
Close - Paint/plaster
Wall
Jun 10, 2022 · Apt 26
Close - Flooring/stairs
Floor
Jun 10, 2022 · Apt 26
Close - Paint/plaster
Wall
Jun 10, 2022 · Apt 26
Close - Door/window
Door
Jun 10, 2022 · Apt 26
Close - Plumbing
Basin/sink
Jun 10, 2022 · Apt 26
Close - Unsanitary condition
Mold
Jun 10, 2022 · Apt 26
Close - Heat/hot water
Entire building
May 16, 2022 · Apt 33
Close - Unsanitary condition
Pests
May 16, 2022 · Apt 33
Close - Heat/hot water
Entire building
Apr 15, 2022 · Apt 11
Close - Water leak
Heavy flow
Apr 15, 2022 · Apt 11
Close - Heat/hot water
Entire building
Mar 24, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 24, 2022 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Dec 12, 2021 · Apt BLDG
Close - Unsanitary condition
Sewage
Dec 12, 2021 · Apt 11
Close - Heat/hot water
Apartment only
Dec 10, 2021 · Apt 7
Close - Heat/hot water
Apartment only
Dec 10, 2021 · Apt 7
Close - Heat/hot water
Entire building
Nov 20, 2021 · Apt 33
Close - Heat/hot water
Entire building
Nov 20, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 20, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 20, 2021 · Apt 7
Close - Heat/hot water
Entire building
Nov 20, 2021 · Apt 12
Close - Heat/hot water
Entire building
Nov 20, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 14, 2021 · Apt 14
Close - Heat/hot water
Entire building
Nov 14, 2021 · Apt 33
Close - Heat/hot water
Entire building
Nov 14, 2021 · Apt 33
Close - Heat/hot water
Entire building
Nov 14, 2021 · Apt APT7
Close - Heat/hot water
Entire building
Nov 14, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 15, 2021 · Apt BLDG
Close - Appliance
Electric/gas range
Oct 13, 2021 · Apt 24
Close - Paint/plaster
Wall
Oct 13, 2021 · Apt 24
Close - Flooring/stairs
Floor
Oct 13, 2021 · Apt 24
Close - Plumbing
Bathtub/shower
Oct 13, 2021 · Apt 24
Close - Plumbing
Basin/sink
Oct 13, 2021 · Apt 24
Close - Plumbing
Radiator
Oct 13, 2021 · Apt 24
Close - Plumbing
Basin/sink
Oct 13, 2021 · Apt 24
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1910
- Floors
- 6
- Residential units
- 41
- Building area
- 36,113 ft²
- Lot area
- 6,750 ft²
- Zoning
- R6
- Community board
- 301
- Council district
- 34
- Block / lot
- 2419 / 19
- Assessed value
- $3,172,500
- Landmark / historic district
- No
HPD registration #302173, last renewed Jun 30, 2026.
Questions about 202 South 2 Street
Who owns 202 South 2 Street?
The owner of record in NYC Department of City Planning PLUTO data is 202 South 2nd Street LLC.
Does 202 South 2 Street have violations?
Yes. NYC HPD has recorded 566 housing violations at this property.
Is 202 South 2 Street rent stabilized?
NYC Department of Finance tax bills listed 15 rent-stabilized units here in 2024 (about 37% of its 41 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 202 South 2 Street built?
City records list 1910 as the year it was built.
How many apartments are in 202 South 2 Street?
It has 41 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.