130 Hope Street
Brooklyn, NY 11211BBL 3-02386-0007Map
Owner of record: Hope-Keap Owner LLC
130 Hope Street is an elevator apartment building built in 2022 in Brooklyn, 11211. It has 143 residential units across 7 floors. The owner of record is Hope-Keap Owner LLC. HPD has recorded 19 housing violations here, most recently on October 12, 2026. 4 of the 19 most recent violations are still open. City tax records listed 44 rent-stabilized apartments here in 2024.
- HPD violations
- 19
- DOB violations
- 1
- ECB violations
- 13
- HPD complaints
- 67
Available now in this building
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 19
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at hopper door at compactor closet, 6th story
Oct 12, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set in the entrance located at apt 222, 2nd story, 4th apartment from north at east
Oct 12, 2026 · Apt 222
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective building intercommunication system from.building front to cellar device in the entire apartment located at apt 222, 2nd story, 4th apartment from north at east
Oct 12, 2026 · Apt 222
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 110, 1st story, 4th apartment from west at north
Sep 30, 2026 · Apt 110
Open — Civ14 mailed - CImmediately hazardous
Remove the illegal fastening double cylinder key operated locking device at vestibule entrance door , 1st story
Mar 8, 2026
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening double cylinder key operated locking device at building entrance door , 1st story
Mar 8, 2026
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at building entrance door , 1st story
Mar 8, 2026
Closed — Violation closed - CImmediately hazardous
Provide security in the case of power outage by installing an acceptable heavy-duty lock and latch set at building entrance door , 1st story
Mar 8, 2026
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
Apr 25, 2025
Closed — Violation closed - BHazardous
Replace with new the missing safety outlet covers at public hall, 1st story
Apr 25, 2025
Closed — Violation closed
Show 9 more ↓
- CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 102, 1st story, 1st apartment from north at east
Mar 19, 2025 · Apt 102
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 102, 1st story, 1st apartment from north at east
Mar 19, 2025 · Apt 102
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 102, 1st story, 1st apartment from north at east
Mar 19, 2025 · Apt 102
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at ceiling and east wall in the 1st room from north at west located at apt 711, 7th story, 3rd apartment from north at east
Apr 1, 2024 · Apt 711
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and east wall in the 1st room from north at west located at apt 711, 7th story, 3rd apartment from north at east
Apr 1, 2024 · Apt 711
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding maximum allowable temperature of 130 degrees in the entire apartment located at apt 711, 7th story, 3rd apartment from north at east
Apr 1, 2024 · Apt 711
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Apr 1, 2024
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at ceiling (approx. 4 sq. ft.) in the 1st room from east located at apt 711, 7th story, 3rd apartment from north at east
Apr 1, 2024 · Apt 711
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 22, 2021
Closed — Violation dismissed
DOB building violations · 1
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 3, 2014
Dob violation - dismissed
ECB violations · 13
- Class - 2
Debris chute does not conform to manufacturers specs or onsite plans.make chute conform to onsite plans
Jul 29, 2022
Resolve - Class - 2
Fence not constructed or maintained persuant to subsection.note:at thetime of my inspection on a non-active jobsite i observed that the construction fence has been poorly maintained.(1)fence has broken/splinter
Apr 30, 2022
Resolve - Class - 2
Bc 3309.11 protection of trees.note:at the time of my inspection on a non-active jobsite,i observed inadequate tree protection for the public tree on the sidewalk of exposure#1.for the benefit of the public,cod
Apr 30, 2022
Resolve - Class - 1
Bc3308.6 horiz netting or supported scf alt (bc3308.6.1.4) i observed active worksite 17stynb w/stripping ops going on 7fl&roof level.also concrete formwork on [email protected] horiz or scf alt provided as required
Mar 24, 2022 · Penalty $2,500
Resolve - Class - 2
Work does not conform to approved construction documents-temporary platform i observed active worksite with material loading operations at exp1 using a knuckle boom crane.on the 6 fl at exp 1,a cantilever titan
Mar 24, 2022 · Penalty $625
Resolve - Class - 2
Sec. 3307.2.6 failure to provide minimum sidewalk width as per code. at the time of inspection proposed 7 sty bldg. i observed sidewalk lessthan minimum requirement 5 feet width as per code. remedy: provide min
Jan 31, 2022
Resolve - Class - 2
Pedestrian protection does not meet code specification.at the time of inspection on an active jobsite proposed 7 story building currently at4th floor level,i observed sidewalk shed at exposure 4 & 2 consisting
Jan 27, 2022
Resolve - Class - 2
Work contrary to plans-labbins,shoring install contry to plans.notes:at time of inspection at 7 story nb open active site observed underpinning work in progress.upon review the soe plans saw that laggins shorin
Oct 1, 2021
Resolve - Class - 1
Work does not conform to approved construction documents and/or approved amendments.note at the time of my inspection of an active jobsite,iobserved piles drilling operation in progress i also observed that the
Jun 10, 2021 · Penalty $2,500
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in notice of violation #35066785z issued on 9/2/14. work w/o permit. gas piping removed at rear. laa pre-filed. remedy: comply w/the comm's order.
Jan 14, 2015 · Penalty $2,400
Resolve
Show 3 more ↓
- Class - 1
Failure to comply w/the comm'nrs order contained in nov #35066785z issued on 9/2/14.work w/o a permit at rear of premises gas line removed w/o a permit.remedy:comply w/the comm'nrs order.
Nov 6, 2014 · Penalty $2,400
Resolve - Class - 1
Work w/o permit work noted, in rear of commercial iron work shop. an existing modine heater the gas line was removed with no dob permit by lic,lumber has been filed for this type of work. rmdy:obtain permit or
Sep 2, 2014 · Penalty $1,600
Resolve - Class - 1
Electrical work w/o permit. electrical wiring & installation of panel,feeder,raceway,connection of branch circuits prior to obtaining permitobserved 12:25pm. also observed raceway not properly supported not
Aug 20, 2014
Resolve
Complaints
- Door/window
Door
Oct 3, 2026 · Apt 222
Close - General
Janitor/super
Sep 30, 2026 · Apt 603
Close - Heat/hot water
Entire building
Sep 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 29, 2026 · Apt 110
Close - General
Signage missing
Sep 18, 2026 · Apt BLDG
Close - General
Signage missing
Sep 18, 2026 · Apt BLDG
Close - General
Signage missing
Sep 18, 2026 · Apt BLDG
Close
Show 40 more ↓
- General
Signage missing
Sep 18, 2026 · Apt BLDG
Close - Door/window
Door
Sep 11, 2026 · Apt 222
Close - Door/window
Door
Jul 26, 2026 · Apt 111
Close - Door/window
Door
Jul 25, 2026 · Apt 507
Close - Door/window
Door
Jul 25, 2026 · Apt 507
Close - Plumbing
Water supply
May 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 13, 2026 · Apt 720
Close - Heat/hot water
Entire building
May 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 13, 2026 · Apt 208
Close - Heat/hot water
Entire building
May 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 13, 2026 · Apt 620
Close - Heat/hot water
Entire building
May 13, 2026 · Apt 111
Close - Plumbing
Water supply
May 13, 2026 · Apt 620
Close - Heat/hot water
Entire building
May 12, 2026 · Apt 617
Close - Heat/hot water
Apartment only
May 12, 2026 · Apt 110
Close - Heat/hot water
Entire building
May 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 12, 2026 · Apt 720
Close - Unsanitary condition
Garbage/recycling storage
Apr 8, 2026 · Apt BLDG
Close - Plumbing
Toilet
Apr 3, 2026 · Apt 110
Close - Electric
Wiring
Apr 3, 2026 · Apt 110
Close - Heat/hot water
Entire building
Mar 24, 2026 · Apt 617
Close - General
Janitor/super
Mar 24, 2026 · Apt 617
Close - General
Signage missing
Mar 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 9, 2026 · Apt 602
Close - Heat/hot water
Entire building
Mar 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 9, 2026 · Apt 405
Close - Heat/hot water
Entire building
Mar 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 9, 2026 · Apt 609
Close - Heat/hot water
Apartment only
Mar 9, 2026 · Apt 222
Close - Heat/hot water
Entire building
Mar 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 7, 2026 · Apt BLDG
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Sep 3, 2026 | $122,500,000 | Rentals - elevator apartments | 145 |
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 2022
- Floors
- 7
- Residential units
- 143
- Building area
- 147,053 ft²
- Lot area
- 26,103 ft²
- Zoning
- M1-2/R6A
- Community board
- 301
- Council district
- 34
- Block / lot
- 2386 / 7
- Assessed value
- $18,866,250
- Landmark / historic district
- No
HPD registration #390759, last renewed Jul 29, 2026.
Questions about 130 Hope Street
Who owns 130 Hope Street?
The owner of record in NYC Department of City Planning PLUTO data is Hope-Keap Owner LLC.
Does 130 Hope Street have violations?
Yes. NYC HPD has recorded 19 housing violations at this property.
Is 130 Hope Street rent stabilized?
NYC Department of Finance tax bills listed 44 rent-stabilized units here in 2024 (about 31% of its 143 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 130 Hope Street built?
City records list 2022 as the year it was built.
How many apartments are in 130 Hope Street?
It has 143 residential units and 145 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.

