roofy

123 Hope Street

Brooklyn, NY 11211BBL 3-02374-0001Map

Owner of record: 123 Hope Street LLC

123 Hope Street is an elevator apartment building built in 2017 in Brooklyn, 11211. It has 136 residential units across 7 floors. The owner of record is 123 Hope Street LLC. HPD has recorded 19 housing violations here, most recently on October 17, 2026. 1 of the 19 most recent violations are still open. City tax records listed 60 rent-stabilized apartments here in 2024.

HPD violations
19
DOB violations
13
ECB violations
29
HPD complaints
30

Available now in this building

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Watch
Last violation Oct 17, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
60
About 44% of the building's 136 apartments
Down from 98 in 2020

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 19

  • B

    Properly repair with similar material the broken or defective wood floor tiles in the 1st room from north located at apt 4w, 4th story, 3rd apartment from west at north

    Oct 17, 2026 · Apt 4W

    Open — Nov sent out
  • C

    Remove device preventing door from being self-closing consisting of marble flooring protruding under fire door leading to staircase a at public hall, 1st story

    Aug 5, 2026

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 2; in the entire apartment located at apt 2u, 2nd story, 4th apartment from north at east

    Jun 9, 2026 · Apt 2U

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 5, 2026

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 10, 2025

    Closed — Violation dismissed
  • C

    Remove device preventing door from being self-closing hook and eye at building entrance door at public hall, 1st story

    May 15, 2025

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective heating unit at east wall in the 3rd room from east located at apt 2u, 2nd story, 4th apartment from north at east

    Feb 5, 2025 · Apt 2U

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 26, 2024

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective located at apt 4t, 4th story, 5th apartment from west at north , section ''l-x'', at east

    Feb 25, 2020 · Apt 4T

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective located at apt 4t, 4th story, 5th apartment from west at north , section ''l-x'', at east

    Feb 25, 2020 · Apt 4T

    Closed — Violation closed
Show 9 more ↓
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Feb 25, 2020

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the kitchen located at apt 4t, 4th story, 6th apartment from west at north

    Jan 25, 2020 · Apt 4T

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 19, 2018

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Oct 10, 2018

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Oct 10, 2018

    Closed — Violation closed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box (missing) at public hall, 1st story

    Oct 10, 2018

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor (missing) at public hall, 1st story

    Oct 10, 2018

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Oct 10, 2018

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Oct 10, 2018

    Closed — Violation closed

DOB building violations · 13

  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 2, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 2, 2020

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 5, 2018

    Dob violation - dismissed
  • Plumbing none

    Ptac units throughout the building installed with flexible connectors which is prohibited. stop all work under #320625436 except to remove flexible connectors on ptac units

    Aug 13, 2018

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jun 4, 2018

    Vpw*-violation unserved ecb-work without permit-dismissed
  • Construction other optional

    C-construction other optional

    Jun 4, 2018

    Vp*-violation unserved ecb- dismissed
  • Construction other optional

    C-construction other optional

    Jun 4, 2018

    Vp*-violation unserved ecb- dismissed
  • Construction other optional

    C-construction other optional

    Jun 4, 2018

    Vp*-violation unserved ecb- dismissed
  • Construction other optional

    C-construction other optional

    Jun 4, 2018

    Vp*-violation unserved ecb- dismissed
  • Construction other optional

    Work after hours without variance permit

    Dec 9, 2017

    Vpw*-violation unserved ecb-work without permit-dismissed
Show 3 more ↓
  • Construction other optional

    1 story industrial bldg w/a wood bowstring truss roof. remedy: w/in 60 days of date of vio owner to engage a nys lic pe exp'd w/wood trusses to probe & eval structual soundness of bowstring using field verification calculations probes etc and submit report acceptable by dept rpr drwgs t/be file with dob w/in 45 days after the inspection

    Sep 24, 2015

    Dob violation - dismissed
  • Construction other optional

    Failure to comply with commissioner's order. the bldg has a wood bow- string truss roof. the department served you a curable comm. order (notice of violation) on 5/09/2014 to produce an engr report on your bldg. no engr report has been received. comply per the commisioner's order

    Jul 31, 2014

    Dob violation - dismissed
  • Construction other optional

    432 rodney st:1stry,occupd factory bldg/wood bowstring truss roof.w/in 60 days of vio owner to engage nys lic pe experienced w/wood trusses to probe&evaluate structr'l soundness of bowstring using field verifications,calculations,probes,etc. ea.truss&bearings eval'd. any structural deficiencies shored.repair drwgs.filed within 45 daysof vio

    May 9, 2014

    Dob violation - dismissed

ECB violations · 29

  • Class - 1

    Failure to maintain building in code compliant manner. upon inspection, the device in this residential building, with 136 dwelling units, is found to be out of service for an extended period of time. remedy: re

    Apr 9, 2025 · Penalty $3,125

    Resolve
  • Class - 1

    The only elevator in building (or section of building) out of service. upon inspection, the device is found to be out-of-service creating a hazardous condition as per 1rcny 11-02. remedy: restore to service imm

    Mar 13, 2025 · Penalty $3,125

    Resolve
  • Class - 1

    Failure to submit the required parking structure initial observation report for an existing parking structure or a periodic inspection of a parking structure(pips) report documenting the conditions of psid#b000

    Oct 1, 2024 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to institute & maintain safety equipment measures & temporary construction. note: at the time of my inspection of a 7 sty bldg at roof level,construction work in progress. i observed that there were no

    Jun 4, 2018

    Resolve
  • Class - 1

    Sidewalk shed where required. note: at the time of my inspection of a 7 sty bldg at roof level,approx 75 feet in height construction work inprogress. i observed temporary walkway in road at exp#1&4 approx 10fee

    Jun 4, 2018 · Penalty $10,000

    Resolve
  • Class - 1

    Failure to comply w/manufacturer specifications. note: at the time of my inspection of a 7 sty bldg @ roof level,construction work in progress. i observed a worker working on perimeter edge on 7th fl level exp#

    Jun 4, 2018 · Penalty $2,500

    Resolve
  • Class - 1

    Sec. 3303.4.2 containers. note: at the time of my inspection of a 7 sty bldg at roof level,construction work in progress. i observed a dumpster(30 cubic yard)in roadway at exp#4 adjacent to pedestrian walkway.

    Jun 4, 2018 · Penalty $625

    Resolve
  • Class - 1

    Work w/o a permit. note: at the time of my inspection of a 7 sty bldg at roof level,construction work in progress that include bldg pavement plan work @ exp#1&4(removal & replacement of sidewalk & curb,approx

    Jun 4, 2018

    Resolve
  • Class - 1

    Sec. 3307.2.2 temporary public walkway in the street. note: at the time of my inspection of a 7 sty bldg at roof level,i observed construction operation in progress at exp#1&4 on sidewalk(bldg pavement plan)adj

    Jun 4, 2018

    Resolve
  • Class - 1

    Sec. 3309.10 protection of roofs. note: at the time of my inspection of a 7 sty bldg at roof level,construction work in progress. i observed that there were no roof protection in place at exp#3 for adjacent pro

    Jun 4, 2018

    Resolve
Show 19 more ↓
  • Class - 2

    Construction superintendent failed to perform duties as per code. the following hazardous conditions were observed & stop work order was issued to this construction site on this date 1)wokr w/o a permit 2)no si

    Jun 4, 2018

    Resolve
  • Class - 1

    97-r-##:3p16156 being used to provide transportation for const personnel,tools,&materials on a const or demo site.no appl. has been filed toobtain such use.file appl & obtain permit as per section 5.10 of appen

    May 9, 2018 · Penalty $1,630

    Resolve
  • Class - 1

    Work after hours w/o variance permit. noted: premises is a 7 story alteration under permit #320625436 exp 06/05/2018 for vertical enlargement of existing bldg to 7 floors. inspection revealed construction activ

    Dec 9, 2017 · Penalty $800

    Resolve
  • Class - 1

    Sec: 3313.1. combustible liquid- not stored properly. @ time of insp observed, active job site. combustible liquid is found on roof not stored properly as required. all combustible gas & liquid are to be stored

    Sep 11, 2017 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to institute/maintain safety measures at job site-guard rails. at time of inspection observed, active job site the guardrail system along the perimeter edge of the building on the roof level has not bee

    Sep 11, 2017

    Resolve
  • Class - 2

    Contrary to plans. noticed @ time of insp horizontal netting tied backto concrete embedded safety straps. plans show nets to tied back to columns. rem: conform nets to plan.

    Aug 16, 2017

    Resolve
  • Class - 2

    Sec: bc 3307.2.1. contrary to dot permits. noticed @ time of insp concrete pump truck & concrete trucks taking up whole street & closing down traffic as well as full sidewalk closure dot permit shows to maintai

    Aug 16, 2017

    Resolve
  • Class - 2

    Sec: bc 3303.2.2. use of fire hydrant w/out dep permit. noticed @ time of insp hose connected to fire hydrant in use w/out permit. rem: obtain fire hydrant permit.

    Aug 16, 2017

    Resolve
  • Class - 2

    Sec: bc 3309.10. failure to provide adequate roof protection noticed @ time of insp alt work in progress noticed @ exp#2 adjacent property roof protection not adequate coping missing protection as well as middl

    Aug 16, 2017

    Resolve
  • Class - 1

    Work against a swo. @ time of insp, i observed approx 18 workera @ site,asked the c.s. michael kennedy pm michael weinbaum why the workers were present while they were under a fall swo, they started that they w

    Aug 1, 2017 · Penalty $4,800

    Resolve
  • Class - 1

    Failure to designate &/or have construction superintendent present @ site as required. note: @ time of insp of a 7 story alteration up to 6th flr level, construction work in progress. upon request for designate

    Jul 31, 2017 · Penalty $10,000

    Resolve
  • Class - 1

    Electrical work w/o permit. note: at the time of my inspection of a 7 sty alteration at 6th fl level,construction work in progress. i observed an electrical panel box on 1st fl level install & supply temporary

    Jul 31, 2017 · Penalty $1,600

    Resolve
  • Class - 2

    Sec. 3301-02(d) logs. note: at the time of my inspection of a 7 sty alteration at 6th fl level,construction work in progress. upon request for designated construction superintendent logs to verify compliance &

    Jul 31, 2017 · Penalty $800

    Resolve
  • Class - 1

    Sec: bc3308.5. vertical safety netting. note: @ time of insp of a 7 story alteration up to 6th flr level, construction work in progress. observed that there were no vertical safety netting provided @ exp#1 on 4

    Jul 31, 2017 · Penalty $1,600

    Resolve
  • Class - 1

    Sec. 3303.11 stairs during construction. note: at the time of my inspection of a 7 sty alteration at 6th fl level approx 54 feet in height construction work in progress. i observed access from grae level to 6th

    Jul 31, 2017 · Penalty $1,600

    Resolve
  • Class - 2

    Collection & containment. note: @ time of insp of a 7 story alteration @ 6th flr level, construction work in progress. observed concrete washout being perform in a makeshift box made of plywood,lumber,metal str

    Jul 31, 2017 · Penalty $1,200

    Resolve
  • Class - 1

    Sec. 3305.3.6 reshores limitations. note: at the time of my inspection of a 7 sty alteration at 6th fl level,construction work in progress. i observed reshores at perimeter edge of bldg at 3rd & 4th fl level

    Jul 31, 2017 · Penalty $1,600

    Resolve
  • Class - 1

    Construction superintendent fail to perform duties per rule. the following hazardous conditions were observed 7 stop work order was issued to this construction site on this date. 1)not present at site 2)inadequ

    Jul 31, 2017 · Penalty $10,000

    Resolve
  • Class - 2

    28-104.7.11 failure to comply with the commissioner's order.the bldg is a warehouse-type structure with a wood bowstring truss roof.the respondent did not provide an engineer's report as required by commissione

    Jan 28, 2015 · Penalty $2,000

    Resolve

Complaints

  • Flooring/stairs

    Floor

    Oct 15, 2026 · Apt 4W

    Close
  • Unsanitary condition

    Pests

    Oct 8, 2026 · Apt 7D

    Open
  • Paint/plaster

    Cabinet

    Jun 22, 2026 · Apt 4W

    Close
  • Unsanitary condition

    Pests

    Jun 22, 2026 · Apt 4W

    Close
  • Door/window

    Window frame

    Feb 25, 2026 · Apt 2U

    Close
  • Door/window

    Window frame

    Feb 25, 2026 · Apt 2U

    Close
  • Appliance

    Refrigerator

    Nov 9, 2025 · Apt 5F

    Close
  • Plumbing

    Water supply

    Sep 5, 2025 · Apt 7I

    Close
  • Flooring/stairs

    Floor

    Jul 17, 2025 · Apt 4W

    Close
  • Door/window

    Door

    Jul 17, 2025 · Apt 4W

    Close
Show 20 more ↓
  • Appliance

    Refrigerator

    May 16, 2025 · Apt 2U

    Close
  • Door/window

    Door

    Apr 29, 2025 · Apt 2M

    Close
  • Door/window

    Door

    Mar 31, 2025 · Apt 2M

    Close
  • Elevator

    Maintenance

    Mar 31, 2025 · Apt BLDG

    Close
  • Plumbing

    Radiator

    Feb 20, 2025 · Apt 2U

    Close
  • Plumbing

    Basin/sink

    Feb 20, 2025 · Apt 2U

    Close
  • Appliance

    Refrigerator

    Feb 20, 2025 · Apt 2U

    Close
  • Plumbing

    Basin/sink

    Feb 20, 2025 · Apt 2U

    Close
  • Door/window

    Door

    Feb 3, 2025 · Apt 4F

    Close
  • Heat/hot water

    Apartment only

    Feb 3, 2025 · Apt 2U

    Close
  • Appliance

    Refrigerator

    Feb 3, 2025 · Apt 2U

    Close
  • Electric

    Outlet/switch

    Feb 3, 2025 · Apt 2U

    Close
  • Heat/hot water

    Apartment only

    Jan 28, 2025 · Apt 2U

    Close
  • Door/window

    Door

    Jan 2, 2025 · Apt 6N

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Oct 31, 2023 · Apt BLDG

    Close
  • Water leak

    Heavy flow

    Jun 2, 2021 · Apt 2A

    Close
  • Paint/plaster

    Wall

    Jan 23, 2020 · Apt 4T

    Close
  • Electric

    No lighting

    Sep 3, 2019 · Apt 4X

    Close
  • General

    Cooking gas

    Sep 14, 2018 · Apt 2L

    Close
  • General

    Cooking gas

    Sep 5, 2018 · Apt 6M

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D7)
Year built
2017
Floors
7
Residential units
136
Building area
101,716 ft²
Lot area
23,198 ft²
Zoning
M1-2/R6A
Community board
301
Council district
34
Block / lot
2374 / 1
Assessed value
$14,429,700
Landmark / historic district
No

HPD registration #388202, last renewed Aug 4, 2025.

Questions about 123 Hope Street

Who owns 123 Hope Street?

The owner of record in NYC Department of City Planning PLUTO data is 123 Hope Street LLC.

Does 123 Hope Street have violations?

Yes. NYC HPD has recorded 19 housing violations at this property.

Is 123 Hope Street rent stabilized?

NYC Department of Finance tax bills listed 60 rent-stabilized units here in 2024 (about 44% of its 136 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 123 Hope Street built?

City records list 2017 as the year it was built.

How many apartments are in 123 Hope Street?

It has 136 residential units and 138 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.