186 St Georges Crescent
Bronx, NY 10458BBL 2-03313-0012Map
Owner of record: St George Gardens LLC
186 St Georges Crescent is an elevator apartment building built in 2018 in Bronx, 10458. It has 56 residential units across 10 floors. The owner of record is St George Gardens LLC. HPD has recorded 18 housing violations here, most recently on June 11, 2026. 1 of the 18 most recent violations are still open. City tax records listed 56 rent-stabilized apartments here in 2024.
- HPD violations
- 18
- DOB violations
- 6
- ECB violations
- 30
- HPD complaints
- 86
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 18
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule door , 1st story
Jun 11, 2026
Open — Not complied with - CImmediately hazardous
Properly repair or replace the broken or defective latch and its assembly at vestibule door , 1st story
Jun 11, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3e, 3rd story, 1st apartment from east at south
Feb 11, 2026 · Apt 3E
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door lock at boiler room
Feb 11, 2026
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 10e, 10th story, 1st apartment from east at south
Feb 11, 2026 · Apt 10E
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1c, 1st story, 1st apartment from east at south
Feb 10, 2026 · Apt 1C
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective lock and assembly at building vestibule door , 1st story
Mar 26, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at 3rd fire door from north at east wall at utility closet at public hall, 2nd story
Mar 26, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at vestibule , 1st story
Mar 26, 2025
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at west wall in the 2nd room from north at east located at apt 3e, 3rd story, 1st apartment from east at south
Dec 20, 2023 · Apt 3E
Closed — Violation dismissed
Show 8 more ↓
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north located at apt 3e, 3rd story, 1st apartment from east at south
Dec 20, 2023 · Apt 3E
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the 1st room from east at center located at apt 2e, 2nd story, 1st apartment from east at south
Sep 11, 2023 · Apt 2E
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling south and east wall in the 1st room from east located at apt 2e, 2nd story, 1st apartment from east at south
Sep 11, 2023 · Apt 2E
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective 9th story, chute door in compactor closet at public hall
Jun 29, 2022
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 9c, 9th story, 2nd apartment from east at south
Jan 26, 2022 · Apt 9C
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Jan 26, 2022
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 19, 2021
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing name on the sign , 1st story
Feb 2, 2021
Closed — Violation closed
DOB building violations · 6
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2024
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2024
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2023
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 13, 2021
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed - Construction other optional
C-construction other optional
Aug 29, 2018
Vp*-violation unserved ecb- dismissed
ECB violations · 30
- Class - 2
Bc3307.6.5.10.1/sidewalk shed inspection report.at time of inspection of a 10 story new uilding i observed in sidewalk shed at exposure 1.sidewalk sheds required daily inspections that are documented in a log b
Feb 14, 2020
Resolve - Class - 2
Project info panel sidewalk shed parapet panel construction sign not provided or not in compliance w/section.at time of inspection of a 10 story new building i observed at exposure 1 a sidewalk shed.the sidewal
Feb 14, 2020
Resolve - Class - 1
Failure to file evidence of liability &/or property damage insurance. at time of inspection of a 10 story nb-topped off,i observed a materi al/personnel hoist @exp#1.upon review of the dob database,i discovered
Aug 1, 2019
Resolve - Class - 1
Work does not conform to approved const.docs.&/or approved amendments.at time of inspection of a 10 story nb-topped off,i observed the foll:conditions-2 beams @cellar level connected together(one on top of the
Aug 1, 2019 · Penalty $625
Resolve - Class - 1
Failure to provide standpipe in a state of readiness as required by code.at time of inspection of a 10 story nb-topped off,i observed 2 standpipes,in 2 different staircases,both of them not in readiness.standpi
Aug 1, 2019 · Penalty $625
Resolve - Class - 1
Bc 3301.2failure to institute safety measures at construction site-overhead protection.at time of inspection of a 10 story nb-topped off,i observed ongoing exterior work on(setback)@ext#1,as well as unfinished
Aug 1, 2019 · Penalty $2,500
Resolve - Class - 1
Bc3309.1 failure to protect or adequately protect adjoining propertiesduring construction operations.at time of inspection of a new 10 storybld.-topped off.i observed ongoing exterior work on setback @exp#1,as
Aug 1, 2019 · Penalty $625
Resolve - Class - 1
Failure to institute maintain safety equipment measures or temporary construction-guard rails.at time of inspection of a 10 story nb-topped off,i observed multiple window openings at multiple fls.with temporary
Aug 1, 2019 · Penalty $5,000
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements.at time of inspection of a 10 story nb-topped off,i observed the foll.conditions:piles of debris @cellar level,loose/unsecured plywood covering
Aug 1, 2019 · Penalty $625
Resolve - Class - 1
Failure to file evidence of compliance with workers comp.law &/or disability benifits law.at time of inspection of a new 10 story bld.-topped off,i observed a material/personnel hoist in use,@exp#1,permit#22067
Aug 1, 2019
Resolve
Show 20 more ↓
- Class - 1
Work does not conform to approved cons.docs &/or approved amendments.at time of inspection of a 10 story nb-topped off,i observed floor joist inside the bld.were built contrary to approved drawings.steel angles
Aug 1, 2019 · Penalty $625
Resolve - Class - 1
Work does not conform to approved const.docs &/or approved amendments.@time of inspection of a 10 story nb-topped off,i observed a personnelmaterial hoist @exp#1 with the foll. conditions:hoist gate connection
Aug 1, 2019 · Penalty $625
Resolve - Class - 2
Ircny 3319.01(c)(5) respondent failed to notify the dept of mobile crane departure after may 1 2018.mobile crane cn #91018 cd #4968 arribed and departed from 186 st.georfes crescent w/o notifying dept of its
Dec 19, 2018
Resolve - Class - 2
Insulation placement do not meet min req. mb 22060058 in an energy compliance inspection i obseved exterior wall, exposure 1,2 are being installed w/o (3" rigid insulation) as per required on lans page
Nov 20, 2018
Resolve - Class - 2
Failure to maintain/display on site documents required by chapter 33. at the time of inspection it was observed that the contractors performed masonry and steel work but could not provide the special inspection
Nov 16, 2018
Resolve - Class - 1
Work contrary to site safety plan 10 story new building under construction 3rd story active jobsite. at the time of inspection i observed that the jobsite fence was suppose to have 3 egress/ingress doors inst
Nov 16, 2018 · Penalty $2,500
Resolve - Class - 2
Bc3309.1 failure to protect or adequate protect adjoining properties during construction or demolition operation. at the time of inspectioni observe that windows and air conditions at exp4 at adjoining proper
Nov 16, 2018
Resolve - Class - 2
Failure to maintain on site documents required by chapter 33. note at time of inspection of a proposed 10 story new building w/ 1st story (planked) and walls w/ steel beam to 2nd story. i asked for (supvstutive
Aug 29, 2018 · Penalty $625
Resolve - Class - 2
3303.15-1 collection and containment-note at time of inspection of a 10 story new building at 2nd story phase. i observe a cement under truck along w/ a concrete pump on site w/ another truck waiting to be disc
Aug 29, 2018 · Penalty $1,250
Resolve - Class - 2
Sec: bc 3301.1.2. fire code: note @ time of insp of a proposed 10 story new bldg @ foundation level. observed a diesel generator on site. i ask for a fdny permit none provided. this creates a potential expolsio
Aug 1, 2018 · Penalty $625
Resolve - Class - 2
Sec: bc 3310.5.1. notification of change in site safety contractor. note: @ time of insp of a proposed 10 story new bldg @ foundation level observed in bis that site safety construction on pw2 is shaviq r musta
Aug 1, 2018
Resolve - Class - 1
Sec: bc 3303.4.7. material storage on sidewalk. @ time of insp of a 10 story new bldg @ foundation phase, observed material consisting of cmu oval blocks stored above barrier. this creates a potential dislodgem
Aug 1, 2018 · Penalty $625
Resolve - Class - 1
Work does not conform to approved construction documents &/or approved amendments. note @ time of insp of a proposed 10 story new bldg @ foundation phase. observed a construction fence installed around site tha
Aug 1, 2018 · Penalty $625
Resolve - Class - 2
Failure to provide construction documents (safety log)) at time of inspection asked at jobsite for the site safety logbook they said theydid not have a safety log for the above mentioned address, there is a
Jun 28, 2018
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperations. at time of inspection, noted jobsite fence open and unguarded at exp1 of jobsite. no plywood fence at entrance gate or any other
Jun 27, 2018 · Penalty $5,000
Resolve - Class - 2
Work does not conform to approved construction documents &/or approvedamendments. at time of inspection observed an active construction sitew/rebar for foundation walls on progress,during inspection noted at ex
Feb 15, 2018 · Penalty $200
Resolve - Class - 1
Failure to notify the dept prior to commencement of earthwork. at timeof inspection observed an active construction site w/rebar on progress,during inspection. noted: the confirmation #222661 contractor provide
Feb 15, 2018 · Penalty $1,200
Resolve - Class - 2
Sec. 3301.2 no guardrails. at time of inspection observed an active construction site w/rebar for a foundation wall on progress,during inspection noted ramp missing guardrails,this creating hazardous conditions
Feb 15, 2018
Resolve - Class - 1
Site safetu coordinator to be designated. at time of inspection noted on bis on pw2 tht there was no designated site safety coordinator as required by code site saety coordinator must be designated and at job
Jan 11, 2018 · Penalty $1,600
Resolve - Class - 1
Bc3310.4 failure to institute and provide site safety plan as requiredby code fo rmajor bldg 11 stories. at time of inspection noteed work ongoing at jobsite w/o a site safety plan. after verifying in bis.rmdy:
Jan 11, 2018 · Penalty $800
Resolve
Complaints
- Plumbing
Basin/sink
Aug 28, 2026 · Apt 3E
Close - Unsanitary condition
Pests
May 28, 2026 · Apt 3A
Close - Safety
Smoke detector
Apr 27, 2026 · Apt 3E
Close - Unsanitary condition
Mold
Mar 1, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt 3E
Close - Heat/hot water
Apartment only
Dec 16, 2025 · Apt 2F
Close - Unsanitary condition
Pests
Oct 13, 2025 · Apt 1C
Close - Unsanitary condition
Garbage/recycling storage
Aug 3, 2025 · Apt BLDG
Close - Appliance
Electric/gas range
Jul 31, 2025 · Apt 6C
Close - Safety
Window guard broken/missing
Apr 1, 2025 · Apt BLDG
Close
Show 40 more ↓
- Door/window
Door
Mar 26, 2025 · Apt 4F
Close - Plumbing
Basin/sink
Mar 21, 2025 · Apt 3E
Close - Door/window
Window frame
Feb 28, 2025 · Apt 2F
Close - Heat/hot water
Apartment only
Feb 28, 2025 · Apt 2F
Close - Plumbing
Water supply
Feb 28, 2025 · Apt 2F
Close - Door/window
Window frame
Feb 22, 2025 · Apt 2F
Close - Heat/hot water
Entire building
Feb 22, 2025 · Apt 2F
Close - Door/window
Window frame
Feb 19, 2025 · Apt 2F
Close - Heat/hot water
Apartment only
Feb 18, 2025 · Apt 2F
Close - Heat/hot water
Apartment only
Jan 31, 2025 · Apt 3E
Close - Paint/plaster
Ceiling
Jan 31, 2025 · Apt 3E
Close - Plumbing
Basin/sink
Jan 31, 2025 · Apt 3E
Close - Electric
No lighting
Jan 31, 2025 · Apt 3E
Close - General
Bell/buzzer/intercom
Dec 9, 2024 · Apt 6A
Close - Plumbing
Toilet
Dec 9, 2024 · Apt 6A
Close - Door/window
Door
Nov 24, 2024 · Apt 2B
Close - Door/window
Door
Nov 24, 2024 · Apt 2B
Close - Door/window
Door
Nov 23, 2024 · Apt 2B
Close - Door/window
Door
Nov 23, 2024 · Apt 2B
Close - Door/window
Door
Nov 22, 2024 · Apt 2B
Close - General
Ventilation system
Jul 8, 2024 · Apt 9E
Close - Appliance
Refrigerator
Jun 7, 2024 · Apt 7B
Close - Door/window
Door
Apr 29, 2024 · Apt 10E
Close - Water leak
Slow leak
Apr 3, 2024 · Apt 2E
Close - Door/window
Door
Apr 3, 2024 · Apt 2E
Close - Water leak
Heavy flow
Mar 23, 2024 · Apt 3E
Close - Heat/hot water
Entire building
Jan 10, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 10, 2024 · Apt 4E
Close - Heat/hot water
Entire building
Jan 9, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 8, 2024 · Apt 2A
Close - Heat/hot water
Apartment only
Jan 8, 2024 · Apt 8B
Close - Heat/hot water
Apartment only
Jan 8, 2024 · Apt 8B
Close - Heat/hot water
Apartment only
Jan 7, 2024 · Apt 10E
Close - Heat/hot water
Apartment only
Jan 7, 2024 · Apt 2C
Close - Heat/hot water
Apartment only
Jan 6, 2024 · Apt 10E
Close - Heat/hot water
Entire building
Jan 1, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 18, 2023 · Apt 3E
Close - Water leak
Heavy flow
Dec 18, 2023 · Apt 3E
Close - Unsanitary condition
Sewage
Nov 27, 2023 · Apt 2C
Close - Plumbing
Water supply
Nov 27, 2023 · Apt 2C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 2018
- Floors
- 10
- Residential units
- 56
- Building area
- 43,250 ft²
- Lot area
- 6,867 ft²
- Zoning
- R8
- Community board
- 207
- Council district
- 11
- Block / lot
- 3313 / 12
- Assessed value
- $2,416,950
- Landmark / historic district
- No
HPD registration #228186, last renewed Jul 15, 2025.
Questions about 186 St Georges Crescent
Who owns 186 St Georges Crescent?
The owner of record in NYC Department of City Planning PLUTO data is St George Gardens LLC.
Does 186 St Georges Crescent have violations?
Yes. NYC HPD has recorded 18 housing violations at this property.
Is 186 St Georges Crescent rent stabilized?
NYC Department of Finance tax bills listed 56 rent-stabilized units here in 2024 (about 100% of its 56 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 186 St Georges Crescent built?
City records list 2018 as the year it was built.
How many apartments are in 186 St Georges Crescent?
It has 56 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.