roofy

100 East Mosholu Parkway

Bronx, NY 10458BBL 2-03313-0029Map

Owner of record: 100 East Mosholu Parkway Owner LLC

100 East Mosholu Parkway is an elevator apartment building built in 1928 in Bronx, 10458. It has 49 residential units across 6 floors. The owner of record is 100 East Mosholu Parkway Owner LLC. HPD has recorded 358 housing violations here, most recently on September 4, 2026. 7 of the 50 most recent violations are still open. City tax records listed 50 rent-stabilized apartments here in 2024.

HPD violations
358
DOB violations
29
ECB violations
16
HPD complaints
623

What to know

Concern
5 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 4, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
50
About 100% of the building's 49 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 358

  • C

    Properly repair or replace the broken or defective latch and its assembly at vestibule door , 1st story

    Sep 4, 2026

    Open — Nov certified on time
  • C

    Replace or repair the self-closing doors that is missing or defective latch at vestibule door , 1st story

    Sep 4, 2026

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... at ceiling in the bathroom located at apt 1h, 1st story, 2nd apartment from east at south

    Jul 18, 2026 · Apt 1H

    Open — Civ14 mailed
  • C

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1h, 1st story, 2nd apartment from east at south

    Jul 18, 2026 · Apt 1H

    Closed — Violation closed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1h, 1st story, 2nd apartment from east at south

    Jul 18, 2026 · Apt 1H

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is defective (co device installed incorrectly. must be within 15 feet of all living rooms. ) in the entire apartment located at apt 1h, 1st story, 2nd apartment from east at south

    Jul 18, 2026 · Apt 1H

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Apr 2, 2026

    Closed — Violation dismissed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system paper sign at public hall, 1st story

    Apr 2, 2026

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Apr 2, 2026

    Closed — Violation dismissed
  • A

    Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page

    Feb 4, 2026

    Closed — Violation dismissed
Show 40 more ↓
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 6f, 6th story, 1st apartment from north at east

    Jan 31, 2026 · Apt 6F

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 6f, 6th story, 1st apartment from north at east

    Jan 31, 2026 · Apt 6F

    Closed — Violation closed
  • C

    Trace and repair the source and abate the visible mold condition... more than 30 square feet at all walls and the ceiling in the 1st bathroom from north located at apt 6f, 6th story, 1st apartment from north at east

    Jan 31, 2026 · Apt 6F

    Open — Notice of issuance sent to tenant
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color approximately 30 square feet of loose plaster at the ceiling in the 1st bathroom from north located at apt 6f, 6th story, 1st apartment from north at east

    Jan 31, 2026 · Apt 6F

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Jan 31, 2026

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Jan 13, 2026

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3c, 3rd story, 4th apartment from south at west

    Jan 13, 2026 · Apt 3C

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3c, 3rd story, 4th apartment from south at west

    Jan 13, 2026 · Apt 3C

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4a, 4th story, 2nd apartment from north at east , section at north

    Jan 10, 2026 · Apt 4A

    Closed — Violation closed
  • A

    Replace with new the missing escutcheon plate at upper riser at east wall in the 1st bathroom from east located at apt 4a, 4th story, 2nd apartment from north at east , section at north

    Jan 10, 2026 · Apt 4A

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east and west walls in the 1st bathroom from east located at apt 4a, 4th story, 2nd apartment from north at east , section at north

    Jan 10, 2026 · Apt 4A

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Jan 10, 2026

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 4a, 4th story, 2nd apartment from north at east , section at north

    Jan 10, 2026 · Apt 4A

    Open — Notice of issuance sent to tenant
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 4a, 4th story, 2nd apartment from north at east , section at north

    Jan 10, 2026 · Apt 4A

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the foyer located at apt 4a, 4th story, 2nd apartment from north at east , section at north

    Jan 10, 2026 · Apt 4A

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the private hallway located at apt 4a, 4th story, 2nd apartment from north at east , section at north

    Jan 10, 2026 · Apt 4A

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 4a, 4th story, 2nd apartment from north at east , section at north

    Jan 10, 2026 · Apt 4A

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd bathroom from east located at apt 4a, 4th story, 2nd apartment from north at east , section at north

    Jan 10, 2026 · Apt 4A

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd bathroom from east located at apt 4a, 4th story, 2nd apartment from north at east , section at north

    Jan 10, 2026 · Apt 4A

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3a, 3rd story, 2nd apartment from north at east

    Nov 18, 2025 · Apt 3A

    Open — Not complied with
  • B

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 3a, 3rd story, 2nd apartment from north at east

    Nov 18, 2025 · Apt 3A

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door [ vestibule to public hall] , 1st story

    Jul 20, 2025

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood frame and door in the 4th room from east located at apt 3a, 3rd story, 2nd apartment from north at east , section ''north''

    Jun 11, 2025 · Apt 3A

    Open — Nov certified late
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the 2nd bathroom from east located at apt 3a, 3rd story, 2nd apartment from north at east , section ''north''

    Jun 11, 2025 · Apt 3A

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic tiles at east wall in the 2nd bathroom from east located at apt 3a, 3rd story, 2nd apartment from north at east , section ''north''

    Jun 11, 2025 · Apt 3A

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceiling, east and west walls in the vestibule , 1st story

    Jun 11, 2025

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wall cabenets in the kitchen located at apt 3a, 3rd story, 2nd apartment from north at east , section ''north''

    Jun 11, 2025 · Apt 3A

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 5, 2025

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... greater than 10 square feet at ceiling and north wall at public hall, 1st story

    Apr 30, 2025

    Closed — Violation closed
  • A

    Properly secure the loose marble tread 5th up from bottom at public hall stairs, 2nd story, section ''west''

    Apr 30, 2025

    Closed — Violation closed
  • C

    Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at rats at building front yard

    Apr 30, 2025

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 2nd bathroom from east located at apt 5g, 5th story, 1st apartment from east at south

    Apr 1, 2025 · Apt 5G

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door from north at east wall in the 2nd bathroom from east located at apt 5g, 5th story, 1st apartment from east at south

    Apr 1, 2025 · Apt 5G

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation the 1st riser from north at east wall in the 2nd bathroom from east located at apt 5g, 5th story, 1st apartment from east at south

    Apr 1, 2025 · Apt 5G

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation the 1st door from west at north wall in the foyer located at apt 5g, 5th story, 1st apartment from east at south

    Apr 1, 2025 · Apt 5G

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the east wall in the foyer located at apt 5g, 5th story, 1st apartment from east at south

    Apr 1, 2025 · Apt 5G

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the foyer located at apt 5g, 5th story, 1st apartment from east at south

    Apr 1, 2025 · Apt 5G

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... more than 10 sq.ft at ceiling, north wall, east wall and 1st window frame from north at east wall in the 1st bathroom from east located at apt 5g, 5th story, 1st apartment from east at south

    Apr 1, 2025 · Apt 5G

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st closet from west at north wall door frame, 1st closet from west at north wall door in the 3rd room from north at west located at apt 5g, 5th story, 1st apartment from east at south

    Apr 1, 2025 · Apt 5G

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the foyer located at apt 5g, 5th story, 1st apartment from east at south

    Apr 1, 2025 · Apt 5G

    Closed — Violation closed

DOB building violations · 29

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Apr 29, 2021

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 2, 2020

    Dob violation - resolved
  • Retaining wall none

    Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09

    Oct 1, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 19, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 1, 2017

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 13, 2016

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 13, 2014

    Dob violation - resolved
Show 19 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 20, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 25, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 21, 2011

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 9, 2011

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 9, 2011

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 28, 2011

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 28, 2011

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 3, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 17, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 3, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 26, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 5, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 26, 2004

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Elevator elevatorrequired

    2p739

    Dec 27, 2002

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 25, 2002

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 20, 1999

    Dob violation - dismissed
  • Elevator elevatoroptional

    1

    Jun 28, 1993

    Dob violation - dismissed
  • Elevator elevatorrequired

    (74)brake makes loud noise

    Sep 14, 1989

    Dob violation - resolved

ECB violations · 16

  • Class - 2

    Failure to maintain bldg exterior facade and appurtenances. note: at time of inspection, i observed exp #1 north-flower pot on 3rd fl windowsill at front courtyard setback.-roo cracked brick/mortar joints at ch

    Sep 23, 2025 · Penalty $2,530

    Resolve
  • Class - 2

    41d26,40d02,14m10,08v10,39p02,11x10,21d06. 41-repair door lock; 11-2ndflr car button not working (no access for tenants); 21-repair lobby floor hoistway door keeper contact.

    Jan 9, 2013 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to comply w/the commissioner's order contained in nov #34868859h issued on 10.13.10. note: in cellar installed plumbing, electrical and partitions no permits. remedy: comply w/the commissioner's order.

    Sep 21, 2011

    Resolve
  • Class - 1

    Failure to comply w/an order of the commissioner. noted: respondent failed to correct the conditons cited in prior nov #34868859h at cellar installed plumbing, electric & partitions. no permits. remedy: comply

    Jul 1, 2011 · Penalty $6,000

    Resolve
  • Class - 1

    Failure to comply w/ an order of the comm respondent failed to correctthe conditions cited in nov#34868895h at cellar installed plumbing electic and partitions no permits have been issued to remedy conditions c

    Apr 12, 2011 · Penalty $6,000

    Resolve
  • Class - 1

    Unlawful acts : failure to comply w/ an order of the commissioner respondent failed to correct conditions cited on ecb # 34868895h for work done w/o a permit. installed full height partitions & new plumbing to

    Feb 22, 2011 · Penalty $2,400

    Resolve
  • Class - 1

    Unlawful acts.failure to comply w/ an order of the commissioner.respondent failed to correct the conditions cited in nov#34868895h @ bsmnt installed plumbing & partitions to create additional class 'a' apt.no p

    Dec 14, 2010 · Penalty $2,400

    Resolve
  • Class - 1

    Occupancy contrary to cert of occupancy or dob records.noted:dept records indicate 49 class 'a' units permitted in premises.@ time of inspection observed 50 class 'a' apts.8 apts on each flr 1 thru 6 & 2 apts i

    Dec 14, 2010

    Resolve
  • Class - 2

    Residence altered for occupancy as a dwelling for more than the legally approved # of families.noted:bldg dept records indicate legal occupancy is 49 class a unit in bsmt from 1 unit to 2 (total 50 class a unit

    Dec 14, 2010

    Resolve
  • Class - 1

    Occupancy contrary to that allowed by the cert of occupancy or bldg dept records noted at cellar lvl of premises created an extra class a apt at left section of bldg rear apt is label b2 apt consist of 3bdrms 1

    Oct 13, 2010

    Resolve
Show 6 more ↓
  • Class - 1

    Work w/o a permit. noted: at cellar level of premises, rear, east section of bldg erected full height partitions to create 1 extra class 'a'apt w/3 bedrooms,1 living room,1kitchen,2 bathrooms. installed water

    Oct 13, 2010 · Penalty $1,600

    Resolve
  • Non-hazardous

    36t0740t0743h1151h1155y1359q0360t0766o0271q0371k11. 36t07 provide signfor overhead sheave room door. 60t07 provide company sticker for main line switch box 71q03 install guard for light under car 71k11 replace

    Jan 18, 2008 · Penalty $180

    Resolve
  • Non-hazardous

    52y14/ 52o2/ 38t7/ 38w6/ 48#9/ 23*6/ 34w6/ 42##/ 34i11/ 67m12/67h11/ 10b7/ 48 remove excess lubrication so cable can be inspected 23 as per code 42 over hand and seal 34 wals & light 67 toe guard to a

    Mar 12, 2003 · Penalty $350

    Resolve
  • Non-hazardous

    3i11,6q3,9k12,14m7,31q3,46m7,57o2,74o2,35p17. 3-panel damaged repair. 6- car door gate, car tag ungruarded, 9- car door rusted provide fire related. 14- missing certificate frame. 31- expose wire box under car

    Mar 2, 2000 · Penalty $2,500

    Resolve
  • Non-hazardous

    57o,74o,74m,08v,75u,14m, 74o-clean toop of car 74m-clean up and provide cover for box under car.

    Apr 4, 1998 · Penalty $2,500

    Resolve
  • Non-hazardous

    25m 35p 74o 74r 25 replace missing operator cover 35 provide access to motor room 74 clean car top 74 properly enclose hall button wires in piping where necessary

    Aug 5, 1993 · Penalty $100

    Resolve

Complaints

  • Unsanitary condition

    Pests

    Jul 31, 2026 · Apt 2E

    Close
  • Unsanitary condition

    Pests

    Jul 31, 2026 · Apt 2E

    Close
  • Paint/plaster

    Ceiling

    Jul 13, 2026 · Apt 1H

    Close
  • Water leak

    Slow leak

    Jul 13, 2026 · Apt 1H

    Close
  • Heat/hot water

    Apartment only

    Apr 3, 2026 · Apt 5G

    Close
  • Heat/hot water

    Entire building

    Apr 1, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 20, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 18, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 12, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 2, 2026 · Apt BLDG

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Feb 20, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 1, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 28, 2026 · Apt 5G

    Close
  • Heat/hot water

    Entire building

    Jan 27, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 26, 2026 · Apt 2H

    Close
  • Heat/hot water

    Entire building

    Jan 25, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 24, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 24, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 18, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 14, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 11, 2026 · Apt 3C

    Close
  • Heat/hot water

    Apartment only

    Jan 10, 2026 · Apt 3C

    Close
  • Heat/hot water

    Apartment only

    Jan 8, 2026 · Apt 4A

    Close
  • Heat/hot water

    Entire building

    Jan 3, 2026 · Apt 4A

    Close
  • Heat/hot water

    Apartment only

    Jan 2, 2026 · Apt 4A

    Close
  • Heat/hot water

    Entire building

    Jan 1, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 1, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 31, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 27, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 27, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 27, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 27, 2025 · Apt 4A

    Close
  • Heat/hot water

    Entire building

    Dec 26, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 26, 2025 · Apt 4A

    Close
  • Heat/hot water

    Entire building

    Dec 16, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 9, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 30, 2025 · Apt BLDG

    Close
  • Water leak

    Slow leak

    Aug 18, 2025 · Apt 2H

    Close
  • General

    Cabinet

    Apr 1, 2025 · Apt 3C

    Close
  • Unsanitary condition

    Mold

    Apr 1, 2025 · Apt 3C

    Close
  • Unsanitary condition

    Mold

    Mar 31, 2025 · Apt 5J

    Close
  • Heat/hot water

    Apartment only

    Feb 20, 2025 · Apt 2E

    Close
  • Paint/plaster

    Wall

    Jan 29, 2025 · Apt 5G

    Close
  • Unsanitary condition

    Mold

    Jan 29, 2025 · Apt 5G

    Close
  • Heat/hot water

    Apartment only

    Jan 23, 2025 · Apt 2E

    Close
  • Heat/hot water

    Entire building

    Jan 22, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Mold

    Jan 7, 2025 · Apt 5G

    Close
  • Unsanitary condition

    Mold

    Dec 3, 2024 · Apt 5G

    Close
  • General

    Cabinet

    Sep 30, 2024 · Apt 3C

    Close
  • Water leak

    Slow leak

    Sep 30, 2024 · Apt 3C

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D1)
Year built
1928
Floors
6
Residential units
49
Building area
82,218 ft²
Lot area
17,500 ft²
Zoning
R8
Community board
207
Council district
11
Block / lot
3313 / 29
Assessed value
$1,442,250
Landmark / historic district
No

HPD registration #212958, last renewed Jul 21, 2025.

Questions about 100 East Mosholu Parkway

Who owns 100 East Mosholu Parkway?

The owner of record in NYC Department of City Planning PLUTO data is 100 East Mosholu Parkway Owner LLC.

Does 100 East Mosholu Parkway have violations?

Yes. NYC HPD has recorded 358 housing violations at this property.

Is 100 East Mosholu Parkway rent stabilized?

NYC Department of Finance tax bills listed 50 rent-stabilized units here in 2024 (about 100% of its 49 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 100 East Mosholu Parkway built?

City records list 1928 as the year it was built.

How many apartments are in 100 East Mosholu Parkway?

It has 49 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.