1050 Lowell Street
Bronx, NY 10459BBL 2-02757-0042Map
Owner of record: 209 M Corp
1050 Lowell Street is a walk-up apartment building built in 1911 in Bronx, 10459. It has 11 residential units across 5 floors. The owner of record is 209 M Corp. HPD has recorded 1,521 housing violations here, most recently on September 14, 2026. 43 of the 50 most recent violations are still open. City tax records listed 4 rent-stabilized apartments here in 2023.
- HPD violations
- 1,521
- DOB violations
- 24
- ECB violations
- 9
- HPD complaints
- 2,133
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1,521
- BHazardous
Properly repair with similar material the broken or defective brick and motar at north parapet exterior wall , 5th story
Sep 14, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 square feet at ceiling and all walls in the 4th room from north located at apt 3b, 4th story, 2nd apartment from east at south
Dec 30, 2025 · Apt 3B
Open — First no access to re- inspect violation - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 square feet at ceiling and all walls in the bathroom located at apt 3b, 4th story, 2nd apartment from east at south
Dec 30, 2025 · Apt 3B
Open — First no access to re- inspect violation - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3b, 4th story, 2nd apartment from east at south
Dec 30, 2025 · Apt 3B
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system gate locked at boiler room
Dec 30, 2025
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3b, 4th story, 2nd apartment from east at south
Dec 30, 2025 · Apt 3B
Open — Nov sent out - CImmediately hazardous
Properly repair and abate unsafe electric wiring condition consisting of excessive exetension cords throughout walls and floor in the entire apartment located at apt 3b, 4th story, 2nd apartment from east at south
Dec 30, 2025 · Apt 3B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 3b, 4th story, 2nd apartment from east at south
Dec 30, 2025 · Apt 3B
Open — Nov sent out - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures .. in the entire apartment located at apt 3b, 4th story, 2nd apartment from east at south
Dec 30, 2025 · Apt 3B
Open — Nov sent out
Show 40 more ↓
- BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 square feet at west wall in the 1st room from north located at apt 3b, 4th story, 2nd apartment from east at south
Dec 30, 2025 · Apt 3B
Open — First no access to re- inspect violation - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 3b, 4th story, 2nd apartment from east at south
Dec 30, 2025 · Apt 3B
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3b, 4th story, 2nd apartment from east at south
Dec 30, 2025 · Apt 3B
Open — Notice of issuance sent to tenant - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3b, 3rd story, 2nd apartment from east at south
Dec 29, 2025 · Apt 3B
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 3b, 3rd story, 2nd apartment from east at south
Dec 29, 2025 · Apt 3B
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 4b, 5th story, 2nd apartment from east at south
Nov 17, 2025 · Apt 4B
Open — First no access to re- inspect violation - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2025
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at vestibule at public hall, 1st story
Nov 10, 2025
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4b, 5th story, 2nd apartment from east at south
Nov 10, 2025 · Apt 4B
Open — First no access to re- inspect violation - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4b, 5th story, 2nd apartment from east at south
Nov 10, 2025 · Apt 4B
Open — First no access to re- inspect violation - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4b, 5th story, 2nd apartment from east at south
Nov 10, 2025 · Apt 4B
Open — First no access to re- inspect violation - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4b, 5th story, 2nd apartment from east at south
Nov 10, 2025 · Apt 4B
Open — First no access to re- inspect violation - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room at basement
Nov 10, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at vestibule at public hall, 1st story
Nov 10, 2025
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges , 1st story
Oct 20, 2025
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3b, 4th story, 2nd apartment from east at south
Oct 20, 2025 · Apt 3B
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective mail boxes in vestibule , 1st story
Oct 20, 2025
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door hinges in the entrance located at apt 4a, 5th story, 1st apartment from east at south
Oct 6, 2025 · Apt 4A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from north located at apt 4a, 5th story, 1st apartment from east at south
Oct 6, 2025 · Apt 4A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 3rd room from north located at apt 4a, 5th story, 1st apartment from east at south
Oct 6, 2025 · Apt 4A
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak over ceiling and east wall in the 3rd room from north located at apt 4a, 5th story, 1st apartment from east at south
Oct 6, 2025 · Apt 4A
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective connection drain pipe under sink in the kitchen located at apt 4a, 5th story, 1st apartment from east at south
Oct 6, 2025 · Apt 4A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective door at cabinet under wash basin in the bathroom located at apt 4a, 5th story, 1st apartment from east at south
Oct 6, 2025 · Apt 4A
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... at ceiling and all walls in the bathroom located at apt 4a, 5th story, 1st apartment from east at south
Oct 6, 2025 · Apt 4A
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroom located at apt 4a, 5th story, 1st apartment from east at south
Oct 6, 2025 · Apt 4A
Open — Nov sent out - CImmediately hazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wire at ceiling in the 4th room from north located at apt 4a, 5th story, 1st apartment from east at south
Oct 6, 2025 · Apt 4A
Open — Nov sent out - CImmediately hazardous
Properly secure the loose 6th marble tread from intermediate landing to up at public hall stairs, 1st story
Sep 29, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective 2nd marble tread from bottom to up at public hall stairs, 1st story
Sep 29, 2025
Open — Not complied with - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 4b, 5th story, 2nd apartment from east at south
Sep 17, 2025 · Apt 4B
Open — First no access to re- inspect violation - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4b, 5th story, 2nd apartment from east at south
Sep 17, 2025 · Apt 4B
Open — First no access to re- inspect violation - CImmediately hazardous
Replace with new the missing window frame at fire escape window in the kitchen located at apt 4b, 5th story
Sep 17, 2025 · Apt 4B
Open — First no access to re- inspect violation - CImmediately hazardous
Repair the broken or defective connection waste pipe line under sink in the kitchen located at apt 4b, 5th story
Sep 17, 2025 · Apt 4B
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective wood base cabinet at sink in the kitchen located at apt 4b, 5th story
Sep 17, 2025 · Apt 4B
Open — First no access to re- inspect violation - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 4b, 5th story, 2nd apartment from east at south
Sep 17, 2025 · Apt 4B
Open — First no access to re- inspect violation - CImmediately hazardous
Properly repair with similar material the broken or defective fire rated materials at cellar
Sep 17, 2025
Open — Not complied with - CImmediately hazardous
Remove all obstructions and repair all defects in bathtub in the bathroom located at apt 4b, 5th story, 2nd apartment from east at south
Sep 17, 2025 · Apt 4B
Open — First no access to re- inspect violation - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3b, 4th story, 2nd apartment from east at south
Sep 17, 2025 · Apt 3B
Open — Not complied with - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 3b, 4th story, 2nd apartment from east at south
Sep 17, 2025 · Apt 3B
Open — Not complied with - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 3b, 4th story, 2nd apartment from east at south
Sep 17, 2025 · Apt 3B
Open — Not complied with - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak above ceiling at cellar
Sep 17, 2025
Closed — Violation closed
DOB building violations · 24
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 6, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 23, 2019
Dob violation - dismissed - Construction other optional
Damage observed to have been sustained to partment 4b due to fire at 1050 lowell street
Jul 20, 2016
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active
Show 14 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - active
ECB violations · 9
- Class - 2
Found supreme dual fuel boiler model#d1-25-5, with exposed wiring, discharge pipe missing at back flow preventer, poor lighting in boiler room, (defective light fixtures) spill switch at draft stat not mounted
Oct 7, 2025 · Penalty $6,250
Active - Class - 2
Observed suspended scaffold with c-hooks installed at exp#3 at 5 floor parapet level. no notification or permit for installation of suspended scaffold. stop all use suspended scaffold., comply with code
Mar 8, 2025 · Penalty $10,000
Active - Class - 2
Failure to comply with the commmissioner's order contained in summons/violation# 35379726x issued on 12/24/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. no compliance recorde
Feb 22, 2019
Resolve - Class - 1
Failure to maintain building wall(s) or appurtenances.noted: at time of inpection i observed at exposure #2 then non structural masonry stucco is in disrepair and cracked loose in various locations,need
Dec 24, 2018 · Penalty $625
Resolve - Class - 1
Failure to maintain buildiing wall noted: at exp2 the non-structuralmasonry stucco is in disrepair cracked loose in various location at time of inspeciton. rmdy: maintain exterior wall.
Nov 4, 2018
Resolve - Class - 1
I cards indicates 1 class apt at bsmt lvl and 10 class a apt 1st to 5th stories now illegal occupancy observed at bsmt lvl 2 sro's created w/ bed tv dressed toiletries and personal effects and key locking devic
Oct 11, 2011 · Penalty $2,400
Resolve - Class - 1
Noted at bsmt lvl erected full height partition at front to create on extra room charging apt layout rem: obtain permit or restore premises to prior legal condition
Oct 11, 2011 · Penalty $800
Resolve - Hazardous
Failure to maintain interior of bldg. defect noted: 2nd flr apt #1a has part of ceiling missing 1'2'x 1 1/2' section. water leaking @ this area from pipes exposed @ this area. remedy: maintain bldg/ make all
Nov 7, 2007 · Penalty $2,000
Resolve - Non-hazardous
Failure to maintain interior of bldg. defect: at 2nd flr, apt #1a, part of the ceiling has collapsed. a piece of drywall approx 1'-0"x3'-0" fell to the flr due to an apparent water leak from flr above. remedy:
Jul 23, 2007 · Penalty $800
Resolve
Complaints
- Paint/plaster
Wall
Feb 17, 2026 · Apt 3B
Close - Heat/hot water
Apartment only
Feb 17, 2026 · Apt 3B
Close - Unsanitary condition
Pests
Feb 17, 2026 · Apt 3B
Close - Plumbing
Water supply
Feb 17, 2026 · Apt 3B
Close - Heat/hot water
Entire building
Dec 27, 2025 · Apt 3B
Close - Heat/hot water
Entire building
Nov 17, 2025 · Apt 4B
Close - Heat/hot water
Entire building
Nov 17, 2025 · Apt 4B
Close - Heat/hot water
Entire building
Nov 14, 2025 · Apt ENTIRE
Close - Heat/hot water
Entire building
Nov 9, 2025 · Apt ENTIRE
Close - Heat/hot water
Entire building
Nov 7, 2025 · Apt ENTIRE
Close
Show 40 more ↓
- Heat/hot water
Entire building
Nov 3, 2025 · Apt ENTIRE
Close - Heat/hot water
Entire building
Nov 1, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 26, 2025 · Apt 4B
Close - Heat/hot water
Entire building
Oct 20, 2025 · Apt 3B
Close - Heat/hot water
Entire building
Oct 20, 2025 · Apt 3B
Close - Heat/hot water
Entire building
Oct 5, 2025 · Apt 4A
Close - Heat/hot water
Entire building
Sep 28, 2025 · Apt 3B
Close - Plumbing
Water supply
Sep 21, 2025 · Apt 4B
Close - Plumbing
Water supply
Sep 16, 2025 · Apt 3B
Close - Heat/hot water
Entire building
Sep 15, 2025 · Apt 4B
Close - Heat/hot water
Entire building
Sep 12, 2025 · Apt 4B
Close - Door/window
Window frame
Sep 12, 2025 · Apt 4B
Close - Plumbing
Toilet
Sep 12, 2025 · Apt 4B
Close - Plumbing
Water supply
Sep 9, 2025 · Apt 4B
Close - Heat/hot water
Entire building
Sep 9, 2025 · Apt 4B
Close - Heat/hot water
Entire building
Sep 4, 2025 · Apt 4B
Close - Heat/hot water
Entire building
Aug 31, 2025 · Apt 4B
Close - Plumbing
Water supply
Aug 25, 2025 · Apt 4B
Close - Heat/hot water
Entire building
Aug 19, 2025 · Apt 4A
Close - Plumbing
Water supply
Jun 17, 2025 · Apt BLDG
Close - Plumbing
Water supply
Jun 13, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 8, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 8, 2025 · Apt 3B
Close - Plumbing
Water supply
Jun 5, 2025 · Apt 3B
Close - Heat/hot water
Entire building
May 27, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
May 23, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
May 14, 2025 · Apt 3B
Close - Water leak
Slow leak
Apr 19, 2025 · Apt 3B
Close - Heat/hot water
Entire building
Mar 3, 2025 · Apt 4B
Close - Heat/hot water
Entire building
Mar 3, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 3, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 3, 2025 · Apt 4A
Close - Heat/hot water
Entire building
Jan 20, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 20, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 19, 2025 · Apt 4A
Close - Heat/hot water
Entire building
Jan 7, 2025 · Apt 2B
Close - Plumbing
Water supply
Jan 3, 2025 · Apt 4A
Close - Heat/hot water
Entire building
Dec 31, 2024 · Apt 3B
Close - General
Mailbox
Dec 31, 2024 · Apt A
Close - Heat/hot water
Entire building
Dec 24, 2024 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1911
- Floors
- 5
- Residential units
- 11
- Building area
- 10,950 ft²
- Lot area
- 3,900 ft²
- Zoning
- M1-1
- Community board
- 202
- Council district
- 17
- Block / lot
- 2757 / 42
- Assessed value
- $358,650
- Landmark / historic district
- No
HPD registration #201826, last renewed Jun 1, 2026.
Questions about 1050 Lowell Street
Who owns 1050 Lowell Street?
The owner of record in NYC Department of City Planning PLUTO data is 209 M Corp.
Does 1050 Lowell Street have violations?
Yes. NYC HPD has recorded 1,521 housing violations at this property.
Is 1050 Lowell Street rent stabilized?
NYC Department of Finance tax bills listed 4 rent-stabilized units here in 2023 (about 36% of its 11 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1050 Lowell Street built?
City records list 1911 as the year it was built.
How many apartments are in 1050 Lowell Street?
It has 11 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.