roofy

1038 Lowell Street

Bronx, NY 10459BBL 2-02757-0039Map

Owner of record: 1038 LLC

1038 Lowell Street is a walk-up apartment building built in 1911 in Bronx, 10459. It has 10 residential units across 5 floors. The owner of record is 1038 LLC. HPD has recorded 522 housing violations here, most recently on August 20, 2026. 30 of the 50 most recent violations are still open.

HPD violations
522
DOB violations
10
ECB violations
0
HPD complaints
443

What to know

Concern
17 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Aug 20, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 522

  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame installed incorrectly ( must be installed within 48-62 inches of the ground

    Aug 20, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective latch at building entrance , 1st story

    May 8, 2026

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective latch in the entrance located at apt 1a, 1st story, 1st apartment from east at south

    May 8, 2026 · Apt 1A

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south

    May 8, 2026 · Apt 1A

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south

    May 8, 2026 · Apt 1A

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system door locked at boiler room

    May 8, 2026

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south

    May 8, 2026 · Apt 1A

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1a, 1st story, 1st apartment from east at south

    May 8, 2026 · Apt 1A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from north located at apt 1a, 1st story, 1st apartment from east at south

    May 8, 2026 · Apt 1A

    Open — Nov sent out
  • A

    Post and maintain a street number on the front of the dwelling plainly visible from the sidewalk.

    May 1, 2026

    Open — Nov sent out
Show 40 more ↓
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 30, 2026

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from north located at apt 1a, 1st story, 1st apartment from east at south

    Feb 17, 2026 · Apt 1A

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south

    Feb 17, 2026 · Apt 1A

    Open — Notice of issuance sent to tenant
  • B

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1a, 1st story, 1st apartment from east at south

    Feb 17, 2026 · Apt 1A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the private hallway located at apt 1a, 1st story, 1st apartment from east at south

    Feb 17, 2026 · Apt 1A

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 1a, 1st story, 1st apartment from east at south

    Feb 17, 2026 · Apt 1A

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south

    Feb 17, 2026 · Apt 1A

    Open — Notice of issuance sent to tenant
  • B

    Properly repair or replace the broken or defective latch set at vestibule door , 1st story

    Feb 7, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective latch set at vestibule door , 1st story

    Feb 7, 2026

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective spring balance at lower sash at 1st window from east at south in the kitchen located at apt 1a, 1st story, 1st apartment from east at south

    Feb 7, 2026 · Apt 1A

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of hot water exceeding 130 degrees at all hot water fixtures in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south

    Feb 7, 2026 · Apt 1A

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system door locked. at boiler room

    Feb 7, 2026

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south

    Feb 7, 2026 · Apt 1A

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south

    Feb 7, 2026 · Apt 1A

    Open — Notice of issuance sent to tenant
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south

    Feb 7, 2026 · Apt 1A

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 17, 2025

    Open — Info nov sent out
  • B

    M/d law abate the nuisance consisting of loose vinyl floor tile at intermediate landing at public hall stairs, 3rd story

    Sep 17, 2025

    Closed — Violation dismissed
  • C

    Remove device preventing door from being self-closing key operated lock installed at roof door. at 1st public hall bulkhead from east, 5th story

    Sep 17, 2025

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective latch set at bulk head door

    Jul 24, 2025

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective latchset at apartment entrance door in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south

    Jul 24, 2025 · Apt 3A

    Open — Invalid certification
  • C

    Replace or repair the self-closing doors that is missing or defective latchset at bulkhead door

    Jul 24, 2025

    Open — Invalid certification
  • B

    Properly repair or replace the broken or defective defective latchset at apartment entrance door in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south

    Jul 24, 2025 · Apt 3A

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the south wall, west wall in the 4th room from north located at apt 3a, 3rd story, 1st apartment from east at south

    May 29, 2025 · Apt 3A

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from north at east wall in the entrance located at apt 3a, 3rd story, 1st apartment from east at south

    May 29, 2025 · Apt 3A

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the north wall, south wall, west wall in the 1st room from north located at apt 3a, 3rd story, 1st apartment from east at south

    May 29, 2025 · Apt 3A

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the east wall in the bathroom located at apt 3a, 3rd story, 1st apartment from east at south

    May 29, 2025 · Apt 3A

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall, west wall in the kitchen located at apt 3a, 3rd story, 1st apartment from east at south

    May 29, 2025 · Apt 3A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, east wall, west wall in the private hallway located at apt 3a, 3rd story, 1st apartment from east at south

    May 29, 2025 · Apt 3A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall in the bathroom located at apt 3a, 3rd story, 1st apartment from east at south

    May 29, 2025 · Apt 3A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) south wall, west wall in the 4th room from north located at apt 3a, 3rd story, 1st apartment from east at south

    May 29, 2025 · Apt 3A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall, east wall in the 2nd room from north located at apt 3a, 3rd story, 1st apartment from east at south

    May 29, 2025 · Apt 3A

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, west wall in the 1st room from north located at apt 3a, 3rd story, 1st apartment from east at south

    May 29, 2025 · Apt 3A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the entrance located at apt 3a, 3rd story, 1st apartment from east at south

    May 29, 2025 · Apt 3A

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective [latch] door in the entrance located at apt 3a, 3rd story, 1st apartment from east at south

    May 24, 2025 · Apt 3A

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south

    May 24, 2025 · Apt 3A

    Closed — Violation closed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south

    May 24, 2025 · Apt 3A

    Closed — Violation closed
  • B

    Provide adequate lighting at west fire passageway at public hall

    May 24, 2025

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south

    May 24, 2025 · Apt 3A

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective latch set at door in the entrance located at apt 3a, 3rd story, 1st apartment from east at south

    May 24, 2025 · Apt 3A

    Open — Nov sent out
  • C

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 3a, 3rd story, 1st apartment from east at south

    May 24, 2025 · Apt 3A

    Open — Nov sent out

DOB building violations · 10

  • Construction other optional

    Structural rendered non- compliant at time of inspection observed property has sustained due to fire damage at apartment 1b, smoke damage, broken windows at exposure 3 & 4 at unit 1b & 2b, damaged/broken walls, ceilings throughout unit basement b, 2b, 3b and 5b. observed chimney at roof damaged.

    May 6, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 9, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 17, 1993

    Dob violation - dismissed

ECB violations · 0

No ECB violations on record

Complaints

  • Door/window

    Door

    Sep 11, 2026 · Apt 3B

    Close
  • Safety

    Fire escape

    Sep 11, 2026 · Apt 3B

    Close
  • Plumbing

    Bathtub/shower

    Sep 11, 2026 · Apt 3B

    Close
  • Plumbing

    Toilet

    Sep 11, 2026 · Apt 3B

    Close
  • Paint/plaster

    Wall

    Sep 11, 2026 · Apt 3B

    Close
  • Door/window

    Door

    Sep 11, 2026 · Apt 3B

    Close
  • Flooring/stairs

    Floor

    Sep 11, 2026 · Apt 3B

    Close
  • Plumbing

    Basin/sink

    Sep 11, 2026 · Apt 3B

    Close
  • Plumbing

    Basin/sink

    Sep 11, 2026 · Apt 3B

    Close
  • Paint/plaster

    Wall

    Sep 4, 2026 · Apt PP

    Close
Show 40 more ↓
  • Paint/plaster

    Wall

    Sep 4, 2026 · Apt PP

    Close
  • Paint/plaster

    Wall

    Sep 4, 2026 · Apt PP

    Close
  • Door/window

    Door

    Aug 12, 2026 · Apt 3B

    Close
  • Door/window

    Window frame

    Aug 12, 2026 · Apt 3B

    Close
  • Plumbing

    Basin/sink

    Aug 12, 2026 · Apt 3B

    Close
  • Paint/plaster

    Wall

    Aug 12, 2026 · Apt 3B

    Close
  • General

    Cabinet

    Aug 12, 2026 · Apt 3B

    Close
  • Paint/plaster

    Wall

    Aug 12, 2026 · Apt 3B

    Close
  • Flooring/stairs

    Floor

    Aug 12, 2026 · Apt 3B

    Close
  • Plumbing

    Basin/sink

    Aug 12, 2026 · Apt 3B

    Close
  • Plumbing

    Toilet

    Aug 12, 2026 · Apt 3B

    Close
  • Plumbing

    Bathtub/shower

    Aug 12, 2026 · Apt 3B

    Close
  • Paint/plaster

    Door/frame

    Aug 4, 2026 · Apt 2A

    Close
  • Electric

    No lighting

    Aug 4, 2026 · Apt 2A

    Close
  • Unsanitary condition

    Mold

    Aug 4, 2026 · Apt 2A

    Close
  • Electric

    Lighting

    Aug 4, 2026 · Apt 2A

    Close
  • Unsanitary condition

    Mold

    Aug 4, 2026 · Apt 2A

    Close
  • Paint/plaster

    Ceiling

    Aug 4, 2026 · Apt 2A

    Close
  • Paint/plaster

    Wall

    Aug 4, 2026 · Apt 2A

    Close
  • Door/window

    Door

    Aug 4, 2026 · Apt 2A

    Close
  • Paint/plaster

    Ceiling

    Aug 4, 2026 · Apt 2A

    Close
  • Paint/plaster

    Ceiling

    Aug 4, 2026 · Apt 2A

    Close
  • Paint/plaster

    Wall

    Aug 4, 2026 · Apt 2A

    Close
  • Water leak

    Damp spot

    Aug 4, 2026 · Apt 2A

    Close
  • Paint/plaster

    Ceiling

    Jul 28, 2026 · Apt 1A

    Close
  • Plumbing

    Bathtub/shower

    Jul 28, 2026 · Apt 1A

    Close
  • Paint/plaster

    Ceiling

    Jul 28, 2026 · Apt 1A

    Close
  • Water leak

    Heavy flow

    Jul 6, 2026 · Apt 1A

    Close
  • Plumbing

    Bathtub/shower

    Jul 6, 2026 · Apt 1A

    Close
  • Paint/plaster

    Wall

    Jul 6, 2026 · Apt 1A

    Close
  • Paint/plaster

    Ceiling

    Jul 6, 2026 · Apt 1A

    Close
  • Paint/plaster

    Ceiling

    Jul 6, 2026 · Apt 1A

    Close
  • Water leak

    Heavy flow

    Jun 24, 2026 · Apt 1A

    Close
  • Paint/plaster

    Wall

    Jun 24, 2026 · Apt 1A

    Close
  • Paint/plaster

    Door/frame

    Jun 24, 2026 · Apt 1A

    Close
  • Paint/plaster

    Wall

    Jun 24, 2026 · Apt 1A

    Close
  • Unsanitary condition

    Mold

    Jun 24, 2026 · Apt 1A

    Close
  • Paint/plaster

    Ceiling

    Jun 24, 2026 · Apt 1A

    Close
  • Water leak

    Slow leak

    May 4, 2026 · Apt 1A

    Close
  • Paint/plaster

    Ceiling

    May 4, 2026 · Apt 1A

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C4)
Year built
1911
Floors
5
Residential units
10
Building area
10,950 ft²
Lot area
3,900 ft²
Zoning
R7-1
Community board
202
Council district
17
Block / lot
2757 / 39
Assessed value
$688,950
Landmark / historic district
No

HPD registration #214336, last renewed Nov 25, 2024.

Questions about 1038 Lowell Street

Who owns 1038 Lowell Street?

The owner of record in NYC Department of City Planning PLUTO data is 1038 LLC.

Does 1038 Lowell Street have violations?

Yes. NYC HPD has recorded 522 housing violations at this property.

Is 1038 Lowell Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1038 Lowell Street built?

City records list 1911 as the year it was built.

How many apartments are in 1038 Lowell Street?

It has 10 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.