1038 Lowell Street
Bronx, NY 10459BBL 2-02757-0039Map
Owner of record: 1038 LLC
1038 Lowell Street is a walk-up apartment building built in 1911 in Bronx, 10459. It has 10 residential units across 5 floors. The owner of record is 1038 LLC. HPD has recorded 522 housing violations here, most recently on August 20, 2026. 30 of the 50 most recent violations are still open.
- HPD violations
- 522
- DOB violations
- 10
- ECB violations
- 0
- HPD complaints
- 443
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 522
- ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame installed incorrectly ( must be installed within 48-62 inches of the ground
Aug 20, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance , 1st story
May 8, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch in the entrance located at apt 1a, 1st story, 1st apartment from east at south
May 8, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
May 8, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
May 8, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
May 8, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
May 8, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
May 8, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from north located at apt 1a, 1st story, 1st apartment from east at south
May 8, 2026 · Apt 1A
Open — Nov sent out - ANon-hazardous
Post and maintain a street number on the front of the dwelling plainly visible from the sidewalk.
May 1, 2026
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from north located at apt 1a, 1st story, 1st apartment from east at south
Feb 17, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Feb 17, 2026 · Apt 1A
Open — Notice of issuance sent to tenant - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Feb 17, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the private hallway located at apt 1a, 1st story, 1st apartment from east at south
Feb 17, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 1a, 1st story, 1st apartment from east at south
Feb 17, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Feb 17, 2026 · Apt 1A
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective latch set at vestibule door , 1st story
Feb 7, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at vestibule door , 1st story
Feb 7, 2026
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective spring balance at lower sash at 1st window from east at south in the kitchen located at apt 1a, 1st story, 1st apartment from east at south
Feb 7, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding 130 degrees at all hot water fixtures in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Feb 7, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked. at boiler room
Feb 7, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Feb 7, 2026 · Apt 1A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Feb 7, 2026 · Apt 1A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Feb 7, 2026 · Apt 1A
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2025
Open — Info nov sent out - BHazardous
M/d law abate the nuisance consisting of loose vinyl floor tile at intermediate landing at public hall stairs, 3rd story
Sep 17, 2025
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing key operated lock installed at roof door. at 1st public hall bulkhead from east, 5th story
Sep 17, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set at bulk head door
Jul 24, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latchset at apartment entrance door in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south
Jul 24, 2025 · Apt 3A
Open — Invalid certification - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latchset at bulkhead door
Jul 24, 2025
Open — Invalid certification - BHazardous
Properly repair or replace the broken or defective defective latchset at apartment entrance door in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south
Jul 24, 2025 · Apt 3A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall, west wall in the 4th room from north located at apt 3a, 3rd story, 1st apartment from east at south
May 29, 2025 · Apt 3A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from north at east wall in the entrance located at apt 3a, 3rd story, 1st apartment from east at south
May 29, 2025 · Apt 3A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall, south wall, west wall in the 1st room from north located at apt 3a, 3rd story, 1st apartment from east at south
May 29, 2025 · Apt 3A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall in the bathroom located at apt 3a, 3rd story, 1st apartment from east at south
May 29, 2025 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall, west wall in the kitchen located at apt 3a, 3rd story, 1st apartment from east at south
May 29, 2025 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, east wall, west wall in the private hallway located at apt 3a, 3rd story, 1st apartment from east at south
May 29, 2025 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall in the bathroom located at apt 3a, 3rd story, 1st apartment from east at south
May 29, 2025 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) south wall, west wall in the 4th room from north located at apt 3a, 3rd story, 1st apartment from east at south
May 29, 2025 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall, east wall in the 2nd room from north located at apt 3a, 3rd story, 1st apartment from east at south
May 29, 2025 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, west wall in the 1st room from north located at apt 3a, 3rd story, 1st apartment from east at south
May 29, 2025 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the entrance located at apt 3a, 3rd story, 1st apartment from east at south
May 29, 2025 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective [latch] door in the entrance located at apt 3a, 3rd story, 1st apartment from east at south
May 24, 2025 · Apt 3A
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south
May 24, 2025 · Apt 3A
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south
May 24, 2025 · Apt 3A
Closed — Violation closed - BHazardous
Provide adequate lighting at west fire passageway at public hall
May 24, 2025
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south
May 24, 2025 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective latch set at door in the entrance located at apt 3a, 3rd story, 1st apartment from east at south
May 24, 2025 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 3a, 3rd story, 1st apartment from east at south
May 24, 2025 · Apt 3A
Open — Nov sent out
DOB building violations · 10
- Construction other optional
Structural rendered non- compliant at time of inspection observed property has sustained due to fire damage at apartment 1b, smoke damage, broken windows at exposure 3 & 4 at unit 1b & 2b, damaged/broken walls, ceilings throughout unit basement b, 2b, 3b and 5b. observed chimney at roof damaged.
May 6, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Door/window
Door
Sep 11, 2026 · Apt 3B
Close - Safety
Fire escape
Sep 11, 2026 · Apt 3B
Close - Plumbing
Bathtub/shower
Sep 11, 2026 · Apt 3B
Close - Plumbing
Toilet
Sep 11, 2026 · Apt 3B
Close - Paint/plaster
Wall
Sep 11, 2026 · Apt 3B
Close - Door/window
Door
Sep 11, 2026 · Apt 3B
Close - Flooring/stairs
Floor
Sep 11, 2026 · Apt 3B
Close - Plumbing
Basin/sink
Sep 11, 2026 · Apt 3B
Close - Plumbing
Basin/sink
Sep 11, 2026 · Apt 3B
Close - Paint/plaster
Wall
Sep 4, 2026 · Apt PP
Close
Show 40 more ↓
- Paint/plaster
Wall
Sep 4, 2026 · Apt PP
Close - Paint/plaster
Wall
Sep 4, 2026 · Apt PP
Close - Door/window
Door
Aug 12, 2026 · Apt 3B
Close - Door/window
Window frame
Aug 12, 2026 · Apt 3B
Close - Plumbing
Basin/sink
Aug 12, 2026 · Apt 3B
Close - Paint/plaster
Wall
Aug 12, 2026 · Apt 3B
Close - General
Cabinet
Aug 12, 2026 · Apt 3B
Close - Paint/plaster
Wall
Aug 12, 2026 · Apt 3B
Close - Flooring/stairs
Floor
Aug 12, 2026 · Apt 3B
Close - Plumbing
Basin/sink
Aug 12, 2026 · Apt 3B
Close - Plumbing
Toilet
Aug 12, 2026 · Apt 3B
Close - Plumbing
Bathtub/shower
Aug 12, 2026 · Apt 3B
Close - Paint/plaster
Door/frame
Aug 4, 2026 · Apt 2A
Close - Electric
No lighting
Aug 4, 2026 · Apt 2A
Close - Unsanitary condition
Mold
Aug 4, 2026 · Apt 2A
Close - Electric
Lighting
Aug 4, 2026 · Apt 2A
Close - Unsanitary condition
Mold
Aug 4, 2026 · Apt 2A
Close - Paint/plaster
Ceiling
Aug 4, 2026 · Apt 2A
Close - Paint/plaster
Wall
Aug 4, 2026 · Apt 2A
Close - Door/window
Door
Aug 4, 2026 · Apt 2A
Close - Paint/plaster
Ceiling
Aug 4, 2026 · Apt 2A
Close - Paint/plaster
Ceiling
Aug 4, 2026 · Apt 2A
Close - Paint/plaster
Wall
Aug 4, 2026 · Apt 2A
Close - Water leak
Damp spot
Aug 4, 2026 · Apt 2A
Close - Paint/plaster
Ceiling
Jul 28, 2026 · Apt 1A
Close - Plumbing
Bathtub/shower
Jul 28, 2026 · Apt 1A
Close - Paint/plaster
Ceiling
Jul 28, 2026 · Apt 1A
Close - Water leak
Heavy flow
Jul 6, 2026 · Apt 1A
Close - Plumbing
Bathtub/shower
Jul 6, 2026 · Apt 1A
Close - Paint/plaster
Wall
Jul 6, 2026 · Apt 1A
Close - Paint/plaster
Ceiling
Jul 6, 2026 · Apt 1A
Close - Paint/plaster
Ceiling
Jul 6, 2026 · Apt 1A
Close - Water leak
Heavy flow
Jun 24, 2026 · Apt 1A
Close - Paint/plaster
Wall
Jun 24, 2026 · Apt 1A
Close - Paint/plaster
Door/frame
Jun 24, 2026 · Apt 1A
Close - Paint/plaster
Wall
Jun 24, 2026 · Apt 1A
Close - Unsanitary condition
Mold
Jun 24, 2026 · Apt 1A
Close - Paint/plaster
Ceiling
Jun 24, 2026 · Apt 1A
Close - Water leak
Slow leak
May 4, 2026 · Apt 1A
Close - Paint/plaster
Ceiling
May 4, 2026 · Apt 1A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C4)
- Year built
- 1911
- Floors
- 5
- Residential units
- 10
- Building area
- 10,950 ft²
- Lot area
- 3,900 ft²
- Zoning
- R7-1
- Community board
- 202
- Council district
- 17
- Block / lot
- 2757 / 39
- Assessed value
- $688,950
- Landmark / historic district
- No
HPD registration #214336, last renewed Nov 25, 2024.
Questions about 1038 Lowell Street
Who owns 1038 Lowell Street?
The owner of record in NYC Department of City Planning PLUTO data is 1038 LLC.
Does 1038 Lowell Street have violations?
Yes. NYC HPD has recorded 522 housing violations at this property.
Is 1038 Lowell Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1038 Lowell Street built?
City records list 1911 as the year it was built.
How many apartments are in 1038 Lowell Street?
It has 10 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.