218 East 165 Street
Bronx, NY 10456BBL 2-02455-0062Map
Owner of record: 218-204 E. 165 Realty Cp
218 East 165 Street is a walk-up apartment building built in 1926 in Bronx, 10456. It has 26 residential units across 6 floors. The owner of record is 218-204 E. 165 Realty Cp. HPD has recorded 147 housing violations here, most recently on September 26, 2026. 44 of the 50 most recent violations are still open. City tax records listed 24 rent-stabilized apartments here in 2024.
- HPD violations
- 147
- DOB violations
- 22
- ECB violations
- 2
- HPD complaints
- 229
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 147
- BHazardous
Replace with new the missing glass at vestible door at public hall, 1st story
Sep 26, 2026
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of plexiglass at vestibule door (from vestibule to public hall) at public hall, 1st story
Sep 26, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Sep 26, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Sep 26, 2026
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Sep 26, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at vistibule door from vistible to public hall at public hall, 1st story
Sep 26, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of construction material at public hall, 1st story
Feb 4, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective repaired latchset and assembly at building entrance door at public hall, 1st story
Feb 4, 2026
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of discarded air conditioner at 2nd story balcony 1st fire escape from north at east exterior wall
Feb 4, 2026
Open — Nov sent out
Show 40 more ↓
- BHazardous
Remove all encumbrances consisting of discarded items under stairs at public hall, 1st story
Feb 4, 2026
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing frame at public hall, 1st story
Feb 4, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latchset at building entrance door at public hall, 1st story
Feb 4, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latchset and assemblies at building entrance door leading to vestibule at public hall, 1st story
Jan 28, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latchset at public hall, 1st story
Jan 28, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door and frame at 1st public hall bulkhead from north, 5th story
Jan 28, 2026
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall
Jan 9, 2026
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective porcelain enamel finnish at bathtub in the bathroom located at apt 1d, 2nd story, 2nd apartment from south at west
Dec 7, 2025 · Apt 1D
Open — Nov sent out - ANon-hazardous
Repair the broken or defective connection at washbasin in the bathroom located at apt 1d, 2nd story, 2nd apartment from south at west
Dec 7, 2025 · Apt 1D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the bathroom located at apt 1d, 2nd story, 2nd apartment from south at west
Dec 7, 2025 · Apt 1D
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective heavy duty mortise lock assembly at building entrance door , 1st story
Dec 7, 2025
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Nov 1, 2025
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the foyer located at apt 1d, 2nd story, 2nd apartment from east at south
Nov 1, 2025 · Apt 1D
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1d, 2nd story, 2nd apartment from east at south
Nov 1, 2025 · Apt 1D
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the 2nd bathroom from north located at apt 1d, 2nd story, 2nd apartment from east at south
Nov 1, 2025 · Apt 1D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tile at west wall in the 2nd bathroom from north located at apt 1d, 2nd story, 2nd apartment from east at south
Nov 1, 2025 · Apt 1D
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system super number not working at public hall, 1st story
Nov 1, 2025
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Nov 1, 2025
Open — Nov sent out - BHazardous
Properly secure the loose medicine cabinet at north wall in the bathroom located at apt 1d, 2nd story, 2nd apartment from south at west
Oct 27, 2025 · Apt 1D
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations inoperable in the entire apartment located at apt 1d, 2nd story, 2nd apartment from south at west
Oct 27, 2025 · Apt 1D
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules inoperable in the entire apartment located at apt 1d, 2nd story, 2nd apartment from south at west
Oct 27, 2025 · Apt 1D
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of key operated lock at door leading to room with fire escape window in the 1st room from north at west located at apt 1d, 2nd story, 2nd apartment from south at west
Oct 27, 2025 · Apt 1D
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at south wall in the kitchen located at apt 1d, 2nd story, 2nd apartment from south at west
Oct 27, 2025 · Apt 1D
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tiles at north wall in the bathroom located at apt 1d, 2nd story, 2nd apartment from south at west
Oct 27, 2025 · Apt 1D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiled floor in the bathroom located at apt 1d, 2nd story, 2nd apartment from south at west
Oct 27, 2025 · Apt 1D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 1d, 2nd story, 2nd apartment from west at north
Oct 18, 2025 · Apt 1D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tile in the bathroom located at apt 1d, 2nd story, 2nd apartment from west at north
Oct 18, 2025 · Apt 1D
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of discarded washer and dryer with doors intact at public hall, 3rd story
Oct 16, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1b, 2nd story, 1st apartment from north at east
Oct 15, 2025 · Apt 1B
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... at ceiling less than 20 sq.ft in the bathroom located at apt 1b, 2nd story, 1st apartment from north at east
Oct 15, 2025 · Apt 1B
Open — First no access to re- inspect violation - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1b, 2nd story, 1st apartment from north at east
Oct 15, 2025 · Apt 1B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1b, 2nd story, 1st apartment from north at east
Oct 15, 2025 · Apt 1B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall and ceiling in the 2nd room from east located at apt 1b, 2nd story, 1st apartment from north at east
Oct 15, 2025 · Apt 1B
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room, 2nd story
Oct 15, 2025
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Oct 14, 2025
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1e, 2nd story, 1st apartment from south at west
Oct 14, 2025 · Apt 1E
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective brick and mortar joints at north exterior wall at building front , 1st story
Oct 14, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective metal window casing at 1st window from south at west exterior wall 6th story
Oct 14, 2025
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Oct 14, 2025
Open — Nov sent out
DOB building violations · 22
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2022
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2021
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2020
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2020
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2020
Dob violation - active
Show 12 more ↓
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2020
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2019
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2019
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed
ECB violations · 2
- Class - 2
Electrical work w/o a permit. the entire store: branch circuit wiring lighting fixures 2 splite a/c units fujitsu mitsubishi not on file. kennedy fried chicken pizza. remedy: obtain permit.
Apr 28, 2017 · Penalty $400
Active - Class - 3
Occupancy contrary to that allowed by the c/o. c/o #51777 indicates 1st flr to have 2 stores, now there are 4 stores on 1st flr. remedy: discontinue illegal use or amend c/o.
Nov 15, 2010 · Penalty $400
Resolve
Complaints
- Heat/hot water
Entire building
Sep 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 2, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 28, 2026 · Apt 1E
Close - Heat/hot water
Entire building
Jan 28, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Jan 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 27, 2026 · Apt 4D
Close - Heat/hot water
Entire building
Jan 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 30, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 30, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 4, 2025 · Apt BLDG
Close - Plumbing
Bathtub/shower
Dec 3, 2025 · Apt 1C
Close - Paint/plaster
Wall
Dec 3, 2025 · Apt 1C
Close - Door/window
Window pane
Dec 3, 2025 · Apt 1C
Close - Flooring/stairs
Floor
Dec 3, 2025 · Apt 1C
Close - Plumbing
Bathtub/shower
Dec 3, 2025 · Apt 1D
Close - Plumbing
Basin/sink
Dec 3, 2025 · Apt 1D
Close - Paint/plaster
Wall
Dec 3, 2025 · Apt 1D
Close - Flooring/stairs
Floor
Dec 3, 2025 · Apt 1C
Close - Door/window
Window frame
Dec 3, 2025 · Apt 1D
Close - Flooring/stairs
Floor
Dec 3, 2025 · Apt 1D
Close - Heat/hot water
Entire building
Nov 6, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 5, 2025 · Apt 2C
Close - Heat/hot water
Entire building
Oct 30, 2025 · Apt 1D
Close - Heat/hot water
Entire building
Oct 25, 2025 · Apt 1D
Close - Flooring/stairs
Floor
Oct 25, 2025 · Apt 1D
Close - Paint/plaster
Wall
Oct 25, 2025 · Apt 1D
Close - General
Cabinet
Oct 25, 2025 · Apt 1D
Close - Plumbing
Bathtub/shower
Oct 25, 2025 · Apt 1D
Close - Paint/plaster
Wall
Oct 25, 2025 · Apt 1D
Close - Heat/hot water
Entire building
Oct 17, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 17, 2025 · Apt 1D
Close - Heat/hot water
Entire building
Oct 15, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 15, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 15, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 15, 2025 · Apt 3A
Close - Heat/hot water
Apartment only
Oct 14, 2025 · Apt 1B
Close - Paint/plaster
Wall
Oct 14, 2025 · Apt 1D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1926
- Floors
- 6
- Residential units
- 26
- Building area
- 30,240 ft²
- Lot area
- 5,211 ft²
- Zoning
- R7-1
- Community board
- 204
- Council district
- 16
- Block / lot
- 2455 / 62
- Assessed value
- $1,382,850
- Landmark / historic district
- No
HPD registration #200865, last renewed Oct 7, 2024.
Questions about 218 East 165 Street
Who owns 218 East 165 Street?
The owner of record in NYC Department of City Planning PLUTO data is 218-204 E. 165 Realty Cp.
Does 218 East 165 Street have violations?
Yes. NYC HPD has recorded 147 housing violations at this property.
Is 218 East 165 Street rent stabilized?
NYC Department of Finance tax bills listed 24 rent-stabilized units here in 2024 (about 92% of its 26 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 218 East 165 Street built?
City records list 1926 as the year it was built.
How many apartments are in 218 East 165 Street?
It has 26 residential units and 31 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.