1140 Grant Avenue
Bronx, NY 10456BBL 2-02449-0014Map
Owner of record: Gra 1140 LLC
1140 Grant Avenue is a walk-up apartment building built in 1927 in Bronx, 10456. It has 15 residential units across 3 floors. The owner of record is Gra 1140 LLC. HPD has recorded 134 housing violations here, most recently on October 13, 2026. 29 of the 50 most recent violations are still open. City tax records listed 15 rent-stabilized apartments here in 2024.
- HPD violations
- 134
- DOB violations
- 21
- ECB violations
- 35
- HPD complaints
- 166
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 134
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east at north located at apt 1a, 1st story, 1st apartment from west at north
Oct 13, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Oct 13, 2026 · Apt 1A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Properly repair with similar material the broken or defective fire stopping materials consisting of sheetrock and.plaster at ceiling in the 2nd room from east at north located at apt 1a, 1st story, 1st apartment from west at north
Oct 13, 2026 · Apt 1A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east at north located at apt 1a, 1st story, 1st apartment from west at north
Oct 13, 2026 · Apt 1A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Oct 13, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at roof at boiler room
Oct 11, 2026
Open — Nov certified on time - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3c, 3rd story, 1st apartment from north at east
Oct 11, 2026 · Apt 3C
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3c, 3rd story, 1st apartment from north at east
Oct 11, 2026 · Apt 3C
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3c, 3rd story, 1st apartment from north at east
Oct 11, 2026 · Apt 3C
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance door from street to vestibule , 1st story
Oct 11, 2026
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair or replace the broken or defective latch and its assemblies , 1st story
Oct 11, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch lock and assemble at building entrance door from street to vestibule at public hall, 1st story
Oct 10, 2026
Open — Not complied with - ANon-hazardous
Cleanse to the satisfaction of this department the garbage bags at public hall, 1st story
Oct 10, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch lock and assemble at building entrance door from street to vestibule. at public hall, 1st story
Oct 10, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer located at apt 1a, 1st story, 1st apartment from west at north
Sep 9, 2026 · Apt 1A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen located at apt 1a, 1st story, 1st apartment from west at north
Sep 9, 2026 · Apt 1A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall at public hall, 1st story
Sep 9, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Sep 9, 2026 · Apt 1A
Open — Civ14 mailed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the foyer located at apt 1a, 1st story, 1st apartment from west at north
Sep 9, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the kitchen located at apt 1a, 1st story, 1st apartment from west at north
Sep 9, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Replace with new the missing electrical outlet cover plate at west wall in the kitchen located at apt 1a, 1st story, 1st apartment from west at north
Sep 9, 2026 · Apt 1A
Open — Civ14 mailed - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant materials at north wall at public hall, 1st story
Sep 9, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective door trim at room entrance door in the 1st room from north located at apt 4a, 4th story, 1st apartment from south at west
Sep 8, 2026 · Apt 4A
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 4a, 4th story, 1st apartment from south at west
Sep 8, 2026 · Apt 4A
Open — Civ14 mailed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures .... in the entire apartment located at apt 4a, 4th story, 1st apartment from south at west
Sep 8, 2026 · Apt 4A
Open — Civ14 mailed - CImmediately hazardous
Provide adequate supply of cold water for the fixtures .... in the entire apartment located at apt 4a, 4th story, 1st apartment from south at west
Sep 8, 2026 · Apt 4A
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3c, 3rd story, 1st apartment from north at east
Sep 7, 2026 · Apt 3C
Open — Civ14 mailed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north at west, the 1st room from north at east, the 3rd room from north at east, the bathroom , the 2nd room from north located at apt 3c, 3rd story, 1st apartment from north at east
Sep 7, 2026 · Apt 3C
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective bell-buzzer system at north wall in the foyer located at apt 4a, 4th story, 1st apartment from south at west
Feb 19, 2026 · Apt 4A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling in the bathroom located at apt 4a, 4th story, 1st apartment from south at west
Feb 19, 2026 · Apt 4A
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing
Dec 3, 2025
Closed — Violation dismissed - BHazardous
Provide a piece of garden hose 10 feet in length with female coupling and a 10 quart pail on premises to test sprinkler system.
Dec 3, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at all fixture in the public hall at all stories
Dec 3, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Dec 3, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5a, 5th story, 1st apartment from south at west
Dec 3, 2025 · Apt 5A
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper.
Dec 3, 2025
Closed — Violation dismissed - BHazardous
Provide an angle hose valve or sill cock at extreme end of highest line of sprinklers.
Dec 3, 2025
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 4a, 4th story, 1st apartment from south at west
Nov 10, 2025 · Apt 4A
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 3 in the entire apartment located at apt 4a, 4th story, 1st apartment from south at west
Nov 10, 2025 · Apt 4A
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 4a, 4th story, 1st apartment from south at west
Nov 10, 2025 · Apt 4A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective intercom system from building entrance to return panel at north wall in the foyer located at apt 4a, 4th story, 1st apartment from south at west
Nov 10, 2025 · Apt 4A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the bathroom located at apt 4a, 4th story, 1st apartment from south at west
Nov 10, 2025 · Apt 4A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 4a, 4th story, 1st apartment from south at west
Jul 23, 2025 · Apt 4A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective spring balance at lower sash window at north wall in the kitchenette located at apt 4a, 4th story, 1st apartment from south at west
Jul 23, 2025 · Apt 4A
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sqft at ceiling in the bathroom located at apt 4a, 4th story, 1st apartment from south at west
Jul 23, 2025 · Apt 4A
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak the ceiling in the bathroom located at apt 4a, 4th story, 1st apartment from south at west
Jul 23, 2025 · Apt 4A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective intercom system from building entrance to north wall in the foyer located at apt 4a, 4th story, 1st apartment from south at west
Jul 23, 2025 · Apt 4A
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 4a, 4th story, 1st apartment from south at west
Jun 28, 2025 · Apt 4A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective intercom connection from building entrance door to intercom station at north wall in the foyer located at apt 4a, 4th story, 1st apartment from south at west
Jun 28, 2025 · Apt 4A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at the the utility room (bicycle room ) ceiling at public hall, 1st story, section ''west''
May 14, 2025
Open — Not complied with
DOB building violations · 21
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 13, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 13, 2021
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed
Show 11 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 24, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 17, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 10, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 28, 2013
Dob violation - dismissed - Emergency none
Egncy-emergency none
Jan 22, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed
ECB violations · 35
- Class - 1
At time of inspection of alt 5 story building active jobsite observed structural framing installed from1st to 5th floor upon request to see the structural drawings it was observed work does not conform with app
May 9, 2023 · Penalty $625
Resolve - Class - 2
Observed large hole opening in staircase of jobsite between 4th and 3rd floor. the opening is approx. 6 ft large opening leading to a 30 ft drop. no adequate protection is provided to safe guard this location.p
Apr 19, 2023
Resolve - Class - 2
Observed inadequate housekeeping throughout jobsite. large amounts of construction debris and materials scattered through ( lumber,cmu, piping, cut cjoist). at exterior of exposures 1 and 4 there are large amo
Apr 19, 2023
Resolve - Class - 2
Observed multiple fire extinguishers not complaint to the fdny code. the said extinguishers are discharged and have pull pins with no fdny inspection tags.comply with fdny code
Apr 19, 2023
Resolve - Class - 2
Observed cold form steel installed throughout entire jobsite. upon request for the manufacture specs from the competent person (ulloa rafael), none were provided.maintain display documents onsite ( manufacture
Apr 19, 2023
Resolve - Class - 2
Observed that no controlled access is provided at exposure 3-coner of adjacent property rear exposure 4 has, full access to jobsite no fence provided as reviewed on site safety plan provided. no signs on jobsit
Apr 19, 2023
Resolve - Class - 1
Observed pipe scaffolding approx. 46 ft seated on top of the sidewalk shed at exposures 1 & 2. upon requesting for the imposed loads letter for the sidewalk shed from the competent person, none was provided.*
Dec 22, 2022 · Penalty $625
Resolve - Class - 1
Failure to safeguard : observed extended 3rd, 4th floor up to property line at exp4 using steel beam, metal decking & no overhead protection for adjacent 3sty tenant occupied bldg. alleyway. no safety measure a
Aug 11, 2022 · Penalty $625
Resolve - Class - 2
Failure to maintain construction fence.note at time of my inspection on a non-active jobsite,i observed that the construction fence has beenpoorly maintained.for instance,fence has multiple unlawful vandalized
Apr 13, 2022
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements.note:at the time of my inspection on a non-active jobsite,i observed inadequate housekeeping consisting of large amounts of debris and combusib
Apr 13, 2022 · Penalty $2,500
Resolve
Show 25 more ↓
- Class - 1
Compliance w/const doccs work doesnt conform to approved/amended plans.note:observed existing staircase@2fl&continues to roof.2fl staircase landing supported by 4"x4" wood vert members rev of demo drawings¬e
Jan 19, 2022 · Penalty $625
Resolve - Class - 2
Failure to safeguard all persons&properly affected by const ops.note:observed condition hazard to workers of existing staircase landing@2fl leads to 3fl of wood vert members supporting landing,demo drawing show
Jan 19, 2022 · Penalty $625
Resolve - Class - 1
3301.13.12 competent person not onsite noted:2workers onsite engagaed in const ops under appl220718800 w/o competent person onsite as reqd in absence of super as per dob code.note:no documentation of whom compe
Jan 13, 2022 · Penalty $625
Resolve - Class - 2
3301.logbook inadequate noted:upon request logbooks,attendance toolbox&preshift are inadequate,missing sheets&dates for work under appl220718800 as reqd by dob code stop all work imme provide reqd&up to date lo
Jan 13, 2022
Resolve - Class - 1
Work contrary to construction documents.at the time of my inspection,iobserved on the 1st floor that were contrary to the construction documents.missing temporary showing to support the shoring installed at 2nd
Nov 29, 2021 · Penalty $625
Resolve - Class - 2
Viewing panels atoi of closed site observed fence on exp1&2 had viewing panels which obstructed viewing.each panel covered in cardboard.restore&maintain fence to conform to bldg code.
Sep 22, 2021
Resolve - Class - 1
Failure to maintain required documents onsite.at the time of my inspection,i observed that the competent person or project manager could notlocated or provide a daily inspection log for the sidewalk shed,monito
Jul 20, 2021 · Penalty $625
Resolve - Class - 1
Work contrary to construction documents.at the time of my inspection,iobserved that the temporary shoring installed on the 1st and 2nd floorwere contrary to the approved/accepted drawing on the 1st floor steel
Jul 20, 2021 · Penalty $2,500
Resolve - Class - 2
Failure to maitain sidewalk shed as per 3301.6.5.3/note:at time of inspection i observed sidewalk shed in place not maintained.1)parapet panel not secured and,2)parapet missing.rem:comply with code,maintain.
May 3, 2018
Resolve - Class - 2
Pedestrian protection not to code color specifications.note:at time ofinspection i observed sidewalk shed in place not hunter green.rem:comply with code-paint hunter green.
May 3, 2018
Resolve - Class - 2
Work without a permit.noted:at time of inspection i observed sidewalk shed in place without valid permit.rem:comply with code-obtain permit.
May 3, 2018
Resolve - Class - 2
Failure to provide information panel.note:at time of inspection i observed sidewalk shed in black without information panel on parapet.rem:comply with code provide information panel.
May 3, 2018
Resolve - Class - 2
Temporary construction equipment on site expd permits.noted:at time of inspection permits for the sidewalk shed expd on 3/5/16.rem:renew sws permit
Oct 27, 2017 · Penalty $2,000
Resolve - Class - 1
Bc3307.6.5.3:failure to maintain sidewalk shed in order.noted:at time of inspection parapet wall panel for the sws patially detached.this condition poses potential hazard to pedestrians and requires immediate c
Oct 27, 2017 · Penalty $4,000
Resolve - Class - 2
3307.6.5,failure to maintain adequate illumination beneath sidewalk shed as required by code.note:sidewalk shed erected under job#240018985 along exp2 has inoperable bulbs rendering affected area visibly dark
Jan 7, 2016 · Penalty $800
Resolve - Class - 1
Failure to maintain bldg noted: at left side parapet bricks approx 14"x 18'dislodged. parapet brick section 3'x10'is leaning towards roof and in danger of falling. previous ecb violation for leaning parapet at
Sep 17, 2014 · Penalty $1,000
Resolve - Class - 2
Work w/o a permit-expired permit noted: sidewalk shed apprx 85'installed at left exposure under application no.240018985 sh and permit has expired as of 9-14-13.rmdy: renew permit.
Sep 17, 2014
Resolve - Class - 2
Failure to maintain bldg in code-compliant manner. at north elevation ( mcclellan st exposure 2 ) brick parapet out of plum w/ loose bricks and mortar joints deteriorating. hpd erected shed after 1st vio issued
May 24, 2014 · Penalty $2,500
Resolve - Class - 2
Temporary construction equipment on site-expired permit.note:sidewalk shed permit is expired 9/14/2013. rem:renew permit.
Dec 23, 2013
Resolve - Class - 2
Sidewalk shed does not meet code specifications.note:underside sidewalk shed light not lit. rem:conform shed to code specifications.
Dec 23, 2013 · Penalty $2,400
Resolve - Class - 2
Failed to obtain a temp construction permit prior to installation/use of sidewalk shed. noted: sidewalk shed in place w/o valid dob permit. remedy: obtain permit.
Sep 30, 2013 · Penalty $500
Resolve - Class - 1
Failure to maintain building in a code compliant manner.noted the following condtion.the parapet wall at exposure 2 (the mcclellan st) facade is leaning inward excessively.there are protruding brick at the lowe
Jan 17, 2013 · Penalty $1,000
Resolve - Class - 1
B154,16,50a,b,c,d,e,f,g,h,i. 50a- boiler shut down by fire dept for carbon monoxide (no one around got access to boiler room) 50b- burner apart no darkit. 50c- cover missing on control. 50d- no rating plate on
Jan 7, 2013 · Penalty $5,000
Resolve - Class - 3
B354,15,32a,50a. 50a- inadequate fresh air intake.
Sep 23, 2011 · Penalty $200
Resolve - Class - 2
B254,4b,16,50a,b,c,d,e,f. 50a- soot on boiler & burner. 50b- seal baseof chimney. 50c- no band iron (hangers or solid strap for flue). 50d- must support water pipes. 50e- check valve required for back flow.
Jul 29, 2011 · Penalty $250
Resolve
Complaints
- Heat/hot water
Entire building
Oct 11, 2026 · Apt 4A
Close - Paint/plaster
Ceiling
Oct 10, 2026 · Apt 1A
Close - Plumbing
Water supply
Oct 10, 2026 · Apt 1A
Close - Water leak
Heavy flow
Oct 10, 2026 · Apt 1A
Close - Electric
Power outage
Oct 10, 2026 · Apt 1A
Close - Plumbing
Water supply
Oct 10, 2026 · Apt 2A
Close - Heat/hot water
Entire building
Oct 10, 2026 · Apt 3C
Close - Water leak
Heavy flow
Oct 10, 2026 · Apt 1A
Close - Paint/plaster
Ceiling
Oct 10, 2026 · Apt 1A
Close - General
Janitor/super
Oct 10, 2026 · Apt 1A
Close
Show 40 more ↓
- Plumbing
Water supply
Oct 10, 2026 · Apt 4A
Close - Appliance
Electric/gas range
Sep 8, 2026 · Apt 1A
Close - General
Bell/buzzer/intercom
Sep 8, 2026 · Apt 1A
Close - Electric
Lighting
Sep 8, 2026 · Apt 1A
Close - Unsanitary condition
Pests
Sep 8, 2026 · Apt 1A
Close - Water leak
Heavy flow
Sep 8, 2026 · Apt 1A
Close - Plumbing
Water supply
Sep 8, 2026 · Apt 2B
Close - Plumbing
Water supply
Sep 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 8, 2026 · Apt 1A
Close - Plumbing
Water supply
Sep 7, 2026 · Apt 2B
Close - Water leak
Heavy flow
Aug 27, 2026 · Apt 1A
Close - Unsanitary condition
Pests
Jul 7, 2026 · Apt 3C
Close - Heat/hot water
Entire building
Jul 5, 2026 · Apt 1A
Close - Heat/hot water
Entire building
Jul 5, 2026 · Apt 3C
Close - Plumbing
Water supply
Jun 11, 2026 · Apt 4A
Close - Plumbing
Water supply
Jun 11, 2026 · Apt 1A
Close - Appliance
Electric/gas range
May 12, 2026 · Apt 1A
Close - Plumbing
Toilet
May 12, 2026 · Apt 1A
Close - Unsanitary condition
Pests
May 12, 2026 · Apt 1A
Close - General
Bell/buzzer/intercom
May 12, 2026 · Apt 1A
Close - Unsanitary condition
Sewage
May 12, 2026 · Apt 1A
Close - Water leak
Heavy flow
Feb 8, 2026 · Apt 4A
Close - Electric
Wiring
Feb 8, 2026 · Apt 4A
Close - Paint/plaster
Ceiling
Feb 7, 2026 · Apt 4A
Close - Heat/hot water
Entire building
Dec 3, 2025 · Apt BLDG
Close - Electric
Power outage
Dec 3, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 3, 2025 · Apt 2A
Close - Electric
Power outage
Dec 2, 2025 · Apt 3C
Close - Heat/hot water
Entire building
Dec 2, 2025 · Apt BLDG
Close - Paint/plaster
Ceiling
Nov 9, 2025 · Apt 4A
Close - Electric
Power outage
Sep 3, 2025 · Apt 2A
Close - Unsanitary condition
Mold
Jul 24, 2025 · Apt INTHES
Close - Unsanitary condition
Mold
Jul 24, 2025 · Apt 4A
Close - Unsanitary condition
Pests
Jul 24, 2025 · Apt 4A
Close - Unsanitary condition
Pests
Jul 24, 2025 · Apt 4A
Close - Unsanitary condition
Mold
Jul 16, 2025 · Apt 4A
Close - Unsanitary condition
Pests
Jun 21, 2025 · Apt 4A
Close - Electric
Lighting
Jun 21, 2025 · Apt 4A
Close - Water leak
Heavy flow
Jun 20, 2025 · Apt 4A
Close - Electric
Lighting
Jun 20, 2025 · Apt 4A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1927
- Floors
- 3
- Residential units
- 15
- Building area
- 13,551 ft²
- Lot area
- 3,100 ft²
- Zoning
- R7-1
- Community board
- 204
- Council district
- 16
- Block / lot
- 2449 / 14
- Assessed value
- $813,600
- Landmark / historic district
- No
HPD registration #207046, last renewed Oct 8, 2025.
Questions about 1140 Grant Avenue
Who owns 1140 Grant Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Gra 1140 LLC.
Does 1140 Grant Avenue have violations?
Yes. NYC HPD has recorded 134 housing violations at this property.
Is 1140 Grant Avenue rent stabilized?
NYC Department of Finance tax bills listed 15 rent-stabilized units here in 2024 (about 100% of its 15 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1140 Grant Avenue built?
City records list 1927 as the year it was built.
How many apartments are in 1140 Grant Avenue?
It has 15 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.