roofy

1152 Grant Avenue

Bronx, NY 10456BBL 2-02449-0036Map

Owner of record: 1152 Grant Bh LLC

1152 Grant Avenue is a walk-up apartment building built in 1935 in Bronx, 10456. It has 10 residential units across 2 floors. The owner of record is 1152 Grant Bh LLC. HPD has recorded 84 housing violations here, most recently on September 30, 2026. 25 of the 50 most recent violations are still open.

HPD violations
84
DOB violations
0
ECB violations
2
HPD complaints
149

What to know

Concern
10 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 30, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 84

  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor , 1st story

    Sep 30, 2026

    Open — Nov certified on time
  • C

    Properly repair or replace the broken or defective heavy-duty mortise lock at building entrance door leading to 1st story public hall

    Sep 30, 2026

    Open — Nov certified on time
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at frame (missing) at public hall

    Sep 30, 2026

    Open — Nov certified on time
  • B

    Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at at apartment door in the entrance located at apt 2b, 2nd story, 1st apartment from south at west

    Sep 17, 2026 · Apt 2B

    Open — Civ14 mailed
  • B

    Properly repair or replace the broken or defective latch set and assemblies at door in the entrance located at apt 2b, 2nd story, 1st apartment from south at west

    Sep 17, 2026 · Apt 2B

    Open — Civ14 mailed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west

    Sep 17, 2026 · Apt 2B

    Open — Civ14 mailed
  • C

    Replace or repair the self-closing doors that is missing or defective latch set and assemblies at door in the entrance located at apt 2b, 2nd story, 1st apartment from south at west

    Sep 17, 2026 · Apt 2B

    Open — Nov certified late
  • C

    Replace or repair the self-closing doors that is missing or defective latch set at building entrance door basement story

    Sep 2, 2026

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling in the kitchenette located at bsmt-apt 1a, 1st bsmt-apt from west at north

    Sep 2, 2026 · Apt 1A

    Open — Notice of issuance sent to tenant
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at bsmt-apt 1a, 1st bsmt-apt from west at north

    Sep 2, 2026 · Apt 1A

    Open — Nov sent out
Show 40 more ↓
  • C

    Abate the infestation consisting of roaches in the entire apartment located at bsmt-apt 1a, 1st bsmt-apt from west at north

    Sep 2, 2026 · Apt 1A

    Open — Notice of issuance sent to tenant
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at bsmt-apt 1a, 1st bsmt-apt from west at north

    Sep 2, 2026 · Apt 1A

    Open — Nov sent out
  • A

    Cleanse to the satisfaction of this department the basement story court

    Sep 2, 2026

    Open — Nov certified on time
  • B

    Properly repair or replace the broken or defective latch set at building entrance door basement story

    Sep 2, 2026

    Open — Nov certified on time
  • C

    Replace or repair the self-closing doors that is missing or defective latch at building entrance

    Sep 1, 2026

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective lock and assembly at building entrance door

    Sep 1, 2026

    Open — Nov certified late
  • C

    Replace or repair the self-closing doors that is missing or defective latch at building entrance door

    Aug 31, 2026

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective lock and assembly at building entrance door

    Aug 31, 2026

    Open — Nov certified late
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at missing at basement story at public hall

    Aug 22, 2026

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective light fixture at ceiling in the 1st room from east located at apt 2d, 1st story, 1st apartment from north at east , section at east

    Aug 22, 2026 · Apt 2D

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2d, 1st story, 1st apartment from north at east , section at east

    Aug 22, 2026 · Apt 2D

    Open — Notice of issuance sent to tenant
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 30, 2026

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2a, 2nd story, 1st apartment from west at north

    Sep 15, 2025 · Apt 2A

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color north wall in the entrance located at apt 2a, 2nd story, 1st apartment from west at north

    Sep 15, 2025 · Apt 2A

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective bell buzzer at building front entrance to pannel at wall in foyer located at apt 2a, 2nd story, 1st apartment from west at north

    Sep 15, 2025 · Apt 2A

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 5, 2025

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1, 1st story, 1st apartment from north at east

    Mar 10, 2020 · Apt 1

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1, 1st story, 1st apartment from north at east

    Mar 10, 2020 · Apt 1

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 6, 2018

    Closed — Violation dismissed
  • B

    Discontinue the rooming unit .... in the 1st room from east at north located at apt 2ndfl, 2nd story, 1st apartment from north at east

    Feb 1, 2018 · Apt 2NDFL

    Closed — Violation dismissed
  • B

    Discontinue the rooming unit one room occupied by one person east /south 1 in the entire apartment located at apt 2ndfl, 2nd story, 1st apartment from north at east

    Feb 1, 2018 · Apt 2NDFL

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2ndfl, 2nd story, 1st apartment from north at east

    Feb 1, 2018 · Apt 2NDFL

    Closed — Violation dismissed
  • B

    Discontinue the rooming unit .... in the 3rd room from east at north located at apt 2ndfl, 2nd story, 1st apartment from north at east

    Feb 1, 2018 · Apt 2NDFL

    Closed — Violation dismissed
  • B

    Discontinue the rooming unit ... in the 5th room from east at north located at apt 2ndfl, 2nd story, 1st apartment from north at east

    Feb 1, 2018 · Apt 2NDFL

    Closed — Violation dismissed
  • B

    Discontinue the rooming unit one room occupied by one person in the 6th room from east at north located at apt 2ndfl, 2nd story, 1st apartment from north at east

    Feb 1, 2018 · Apt 2NDFL

    Closed — Violation dismissed
  • B

    Discontinue the rooming unit one room occupied by one person east / south 6 in the 6th room from east at south located at apt 2ndfl, 2nd story, 1st apartment from north at east

    Feb 1, 2018 · Apt 2NDFL

    Closed — Violation dismissed
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 2ndfl, 2nd story, 1st apartment from north at east

    Sep 16, 2016 · Apt 2NDFL

    Closed — Violation dismissed
  • B

    Replace the broken or defective bathtub in the bathroom located at apt 2ndfl, 2nd story, 2nd apartment from north at east

    Sep 16, 2016 · Apt 2NDFL

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1, 1st story, 1st apartment from north at east

    Sep 16, 2016 · Apt 1

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the bathroom located at apt 1, 1st story, 1st apartment from north at east

    Sep 16, 2016 · Apt 1

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2ndfl, 2nd story, 1st apartment from north at east

    Sep 16, 2016 · Apt 2NDFL

    Closed — Violation dismissed
  • B

    Replace the broken or defective wash basin in the bathroom located at apt 2ndfl, 2nd story, 1st apartment from north at east

    Sep 16, 2016 · Apt 2NDFL

    Closed — Violation dismissed
  • B

    Replace the broken or defective washbasin in the bathroom located at apt 2ndfl, 2nd story, 1st apartment from north at east

    Sep 16, 2016 · Apt 2NDFL

    Closed — Violation dismissed
  • B

    Replace with new the broken or defective radiator air valve in the 1st room from east located at apt 2fl, 2nd story, 2nd apartment from north at east

    Mar 25, 2014 · Apt 2FL

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2fl, 2nd story

    Mar 8, 2013 · Apt 2FL

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the west wall, 1st closet from north at east wall door, 1st window frame from west at north wall in the 3rd room from east located at apt 1, 1st story, 1st apartment from north at east

    Jul 20, 2006 · Apt 1

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, 1st closet from south at west wall wall in the 1st room from east at south located at apt 1, 1st story, 1st apartment from north at east

    Jul 20, 2006 · Apt 1

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from south at west wall, 1st door from south at west wall, baseboard at south wall, 1st closet from south at west wall door in the 1st room from east at south located at apt 1, 1st story, 1st apartment from north at east

    Jul 20, 2006 · Apt 1

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from east at south wall, east wall, 1st window frame from west at north wall in the kitchen located at apt 1, 1st story, 1st apartment from north at east

    Jul 20, 2006 · Apt 1

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the 1st closet from south at west wall wall, west wall in the 1st room from east at north located at apt 1, 1st story, 1st apartment from north at east

    Jul 20, 2006 · Apt 1

    Closed — Violation dismissed

DOB building violations · 0

No DOB violations on record

ECB violations · 2

  • Class - 2

    Observed two entry door openings with doors and door hardware provided at exposure#3 basement in apartment#1-b living room and bedroom in contrary to approved plans# x01073453., conform work to approved constru

    Jan 3, 2025

    Resolve
  • Class - 2

    Occupancy in contrary to that allowed by c/o or dob records. illegallycreate 6(six) b-room at 2nd story apt currently 3 are occupied and 3 are unoccupied. partitions made up of wood/metal stud and sheetrock/pla

    Feb 1, 2018

    Resolve

Complaints

  • Door/window

    Door

    Oct 9, 2026 · Apt 3C

    Close
  • Appliance

    Refrigerator

    Oct 9, 2026 · Apt 3C

    Open
  • Unsanitary condition

    Garbage/recycling storage

    Oct 1, 2026 · Apt 2A

    Close
  • Unsanitary condition

    Pests

    Sep 22, 2026 · Apt 3A

    Close
  • Water leak

    Slow leak

    Sep 22, 2026 · Apt 3A

    Close
  • Unsanitary condition

    Pests

    Sep 15, 2026 · Apt 2B

    Close
  • Door/window

    Door

    Sep 15, 2026 · Apt 2B

    Close
  • Appliance

    Refrigerator

    Sep 11, 2026 · Apt 1A

    Close
  • Door/window

    Window frame

    Sep 11, 2026 · Apt 1A

    Close
  • Unsanitary condition

    Mold

    Sep 11, 2026 · Apt 1A

    Close
Show 40 more ↓
  • Water leak

    Slow leak

    Sep 11, 2026 · Apt 1A

    Close
  • Unsanitary condition

    Pests

    Sep 11, 2026 · Apt 1A

    Close
  • Unsanitary condition

    Pests

    Aug 27, 2026 · Apt 1A

    Close
  • Unsanitary condition

    Mold

    Aug 27, 2026 · Apt 1A

    Close
  • Appliance

    Refrigerator

    Aug 27, 2026 · Apt 1A

    Close
  • Unsanitary condition

    Pests

    Aug 11, 2026 · Apt 2D

    Close
  • Electric

    No lighting

    Aug 11, 2026 · Apt 2D

    Close
  • Heat/hot water

    Apartment only

    Feb 9, 2026 · Apt 2A

    Close
  • Heat/hot water

    Apartment only

    Jan 16, 2026 · Apt 2A

    Close
  • Appliance

    Electric/gas range

    Nov 28, 2025 · Apt 3C

    Close
  • Water leak

    Heavy flow

    Oct 31, 2025 · Apt 1B

    Close
  • Heat/hot water

    Apartment only

    Oct 31, 2025 · Apt 1B

    Close
  • General

    Bell/buzzer/intercom

    Sep 9, 2025 · Apt 2A

    Close
  • Paint/plaster

    Wall

    Sep 9, 2025 · Apt 2A

    Close
  • Safety

    Window guard broken/missing

    Sep 9, 2025 · Apt 2A

    Close
  • General

    Bell/buzzer/intercom

    Sep 9, 2025 · Apt 3C

    Close
  • Plumbing

    Basin/sink

    Sep 9, 2025 · Apt 3C

    Close
  • Electric

    Power outage

    Sep 9, 2025 · Apt 3C

    Close
  • Door/window

    Window frame

    Sep 9, 2025 · Apt 3C

    Close
  • Door/window

    Door

    Sep 9, 2025 · Apt 3C

    Close
  • General

    Bell/buzzer/intercom

    Sep 9, 2025 · Apt 3C

    Close
  • Unsanitary condition

    Mold

    Jul 21, 2025 · Apt 1A

    Close
  • Paint/plaster

    Wall

    Jul 21, 2025 · Apt 1A

    Close
  • Water leak

    Heavy flow

    Jul 14, 2025 · Apt 1B

    Close
  • Heat/hot water

    Apartment only

    Mar 29, 2021 · Apt 1STFLO

    Close
  • Flooring/stairs

    Floor

    Mar 6, 2020 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Mar 6, 2020 · Apt 1

    Close
  • Water leak

    Slow leak

    Mar 6, 2020 · Apt 1

    Close
  • Plumbing

    Radiator

    Mar 6, 2020 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Sep 5, 2018 · Apt 1FL

    Close
  • Paint/plaster

    Ceiling

    Sep 5, 2018 · Apt 1FL

    Close
  • Plumbing

    Basin/sink

    Sep 5, 2018 · Apt 1FL

    Close
  • Paint/plaster

    Ceiling

    Sep 5, 2018 · Apt 1FL

    Close
  • Unsanitary condition

    Mold

    Sep 5, 2018 · Apt 1FL

    Close
  • Heat/hot water

    Apartment only

    Jan 30, 2018 · Apt 2NDFL

    Close
  • Electric

    No lighting

    Jan 29, 2017 · Apt 2FL

    Close
  • Electric

    No lighting

    Jan 29, 2017 · Apt 2FL

    Close
  • Heat/hot water

    Entire building

    Nov 22, 2016 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 20, 2016 · Apt 2

    Close
  • Heat/hot water

    Entire building

    Nov 19, 2016 · Apt 2FL

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1935
Floors
2
Residential units
10
Building area
4,855 ft²
Lot area
2,700 ft²
Zoning
R7-1
Community board
204
Council district
16
Block / lot
2449 / 36
Assessed value
$280,800
Landmark / historic district
No

HPD registration #229224, last renewed Oct 9, 2025.

Questions about 1152 Grant Avenue

Who owns 1152 Grant Avenue?

The owner of record in NYC Department of City Planning PLUTO data is 1152 Grant Bh LLC.

Does 1152 Grant Avenue have violations?

Yes. NYC HPD has recorded 84 housing violations at this property.

Is 1152 Grant Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1152 Grant Avenue built?

City records list 1935 as the year it was built.

How many apartments are in 1152 Grant Avenue?

It has 10 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.