502 Morris Avenue
Bronx, NY 10451BBL 2-02324-0008Map
Owner of record: NYC Department Of Education
502 Morris Avenue is a school building built in 1960 in Bronx, 10451. The owner of record is NYC Department Of Education. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 43
- ECB violations
- 42
- HPD complaints
- 1
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 43
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active
Show 33 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 16, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 1, 2016
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Elevator elevatorrequired
2s297
Feb 15, 2002
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed - Elevator elevatoroptional
1
Jun 29, 1990
Dob violation - dismissed - Elevator elevatoroptional
2
Oct 12, 1989
Dob violation - dismissed - Elevator elevatorrequired
51)restore elevator to service for purpose of inspection by their dept
Feb 14, 1989
Dob violation - resolved
ECB violations · 42
- Class - 2
Reissue#35721354p failure to maintain building in code-compliant manner.noted:on the roof there is flashing broken and missing in several areas and needs to be repaired/replaced.rem:repair and/or replace.
Jun 15, 2026 · Penalty $3,125
Active - Class - 2
Reissue#35721350h failure to maintain building in code-compliant manner.noted:interior fpsc doors do not self-close properly at 3rd flr-staircase 1a and b.2nd flr-staircase b,library main door.classroom doors d
Jun 15, 2026 · Penalty $3,125
Resolve - Class - 2
Failure to maintain building in code-compliant manner. noted: interiorsmokedoors do not self-close. 3rd flr-stair(a and b) roof-stair(a) 2ndflr-stair(b), hallway near 210, 1st stair(a), exit 6, 2, 5, 4, gym exi
Jul 30, 2025 · Penalty $1,250
Resolve - Class - 2
Failure to maintain building in code-compliant manner. noted: flashing was missing and brokening in multiple areas on the roof. remedy: repair and/or replace flashing.
Jul 30, 2025 · Penalty $1,250
Active - Class - 2
Failure to maintain building in code-compliant manner: lack of emergency lighting for exits, exit discharges and public corridors per bc 1006.1; 27-542. noted: emergency lights at exit 1 and 5 did not turn on w
Jul 30, 2025 · Penalty $1,250
Resolve - Class - 2
Failure to maintain building in code-compliant manner: illumination for exit, exit discharges and public corridors per bc. 1006.1; 27-381. noted: 1st floor exit(3) exit sign was not illuminated when inspected.
Jul 30, 2025 · Penalty $1,250
Resolve - Class - 2
Failure to maintain building in code-compliant manner: noted: water damage on ceiling in auditorium on stage. remedy: repair and/or replace ceiling.
Jul 30, 2025 · Penalty $1,250
Resolve - Class - 2
Failure to maintain building in code-compliant manner. no fire stopping per bc 713.3; 27-345. noted: fire stopping is missing in multiple areas in electrical room. remedy: provide/maintain fire stopping.
Jul 30, 2025 · Penalty $1,250
Resolve - Class - 2
Exit self closing.noted:exit door on the first floor next to the gymnasium is not closing properly.rem:repair/replace door.
Mar 16, 2018
Resolve - Class - 2
Failure to maintain bldg in code compliant manner, lack of emergency lighting for exits, exit discharges & public corridors per bc 1006.1, 27-542. noted: @ 1st level: @ stair a, emergency lighting near exit sig
Sep 14, 2016
Resolve
Show 32 more ↓
- Class - 2
Doors not closing. at 2nd story stairs a & b corss corridor near room 209. rmdy: repair or replace.
Jan 29, 2015
Resolve - Class - 2
Re-issue # 35017047x,34987902z. exit door not self closing. 2nd story stairs a,b, cross corridor near room 209. at 3rd story stair b. remedy: repair &/or replace.
Feb 26, 2014
Resolve - Class - 2
Partial obstruction on landing, shelf outside basement- 39 & 40 rooms. remedy: remove all debris.
Feb 26, 2014
Resolve - Class - 2
Doors not closing. at 2nd story stairs a,b and cross corridor door adjacent to room 209. at 3rd story stair b. remedy: repair/replace doors noted.
Apr 30, 2013
Resolve - Class - 2
Residence altered for occupancy as a dwelling fo rmore than the legal number of families. co#61948 indicates cellar to be ordinary use.(boiler room, stoarge, etc).building now altered w/space occupied as class
Apr 10, 2013
Resolve - Class - 2
3rd floor stwy'b' door is racked. 2nd floor stwy'a' door not closing. remedy: repair/replace doors.
Jul 19, 2012
Resolve - Class - 2
No resh air vent in meter rm at cellar level.remedy provide fresh air vent.
Jan 29, 2010
Resolve - Class - 2
Holes in wall above door of electrical room pipe penetrations at cellar level remedy provide maintain fire stopping.
Jan 29, 2010
Resolve - Class - 2
Foundation has become pourus & allowing water to penatrate at cellar in boiler rm at various locations remedy- water proof foundation stop the leaking.
Jan 29, 2010
Resolve - Class - 2
Stairway i.d sign is missing from stairway side at 3rd flr of stwy b remedy provide stwy i.d.signs.
Jan 29, 2010
Resolve - Class - 2
3rd floor stwy b door not closing 2nd flr stwy a & b dr not closing remedy repair /replace doors.
Jan 29, 2010
Resolve - Hazardous
Erected,dismantled,repaired,maintained (a) or modified permitted supported scaffold w/o a supported scaffold certificate of completion issued pursuant to 26-204.3 supported scaffold permit #200966730 being used
May 23, 2008 · Penalty $800
Resolve - Hazardous
All scaffolds shall be erected & maintained so that the safety of public & property will not be impaired by falling materials,tools or debris or by the collapse of the scaffold.two workers performing power nash
May 23, 2008 · Penalty $800
Resolve - Hazardous
Water is entering thur-out the floor in the boiler rm on ceiling levelhas 1 inch of water. remedy: water proof floor/ provide adequate drainage.
May 18, 2007
Resolve - Hazardous
Plaster is cracked & spalling on the ceiling & wall located in rm 310 on the 3 fl. remedy: repair plaster wall & ceiling.
May 18, 2007
Resolve - Non-hazardous
Failure to provide panic hardware where required by law. noted:first floor auditorium stage exit door has no panic bar.(capacity more than 300 persons). remedy: provide panic hardware.
Jan 6, 2005
Resolve - Hazardous
Exit door total obstruction. noted:first floor, stair 1, two exit doors to rear yard are padlocked in closed position during school operation. remedy: remove all obstructions immediately.
Jan 6, 2005
Resolve - Hazardous
Reissue fail to maintain exterior brick walls bricks cracked spalling bricks missing location cracked bricks at exit 8 & 6 exterior wall bricks south west corner top of build remedy:provide side walk overhead
Feb 10, 2004
Resolve - Hazardous
Failure to maintain exterior building walls.defects:bricks-crached loose and building missing morther threw out. allowing water penetrationslocations:loose bricks above exit door sills #8&6- crached bricks miss
Feb 14, 2003
Resolve - Non-hazardous
Failure to maintain:reissue: defect:handrails missing all exteriors staircases. location: 6,7,8-exits remedy:install handrails make all repairs.
Feb 14, 2003
Resolve - Non-hazardous
Railure to maintain. defect is: at exit's #6,7, and 8 handrails are missing in all mentioned locations. remedy: install handrails.
Jan 2, 2002
Resolve - Non-hazardous
Failure to maintain:defect is:damage decorative panels-stage at auditorium. remedy: maintain building make all the necessary repairs.
Jan 2, 2001
Resolve - Non-hazardous
Failure to maintain defect is:at exit #8 step have settled unevenly,causing trip hazards and handrail is missing.remedy:maintain building,make all necessary repairs.
Jan 2, 2001
Resolve - Non-hazardous
Failure to maintain defect is:at playground area swings/chains and related play area hardware(ladder etc)are missing.posts and frames stand alone.remedy:maintain premise,make repairs.
Jan 2, 2001
Resolve - Non-hazardous
Failure to maintain defect is:ground water penetration and accumulation at the boiler room.remedy:maintain building,make all necessary repairs.
Jan 2, 2001
Resolve - Non-hazardous
Defective/inoperative doors at both bulkheads.remedy:replace doors.
Jan 2, 2001
Resolve - Non-hazardous
Failure to maintain defects are:1.at gymnasium long vertical crack at plaster wall.2.damaged ceilings and walls rooms:#316,319,318,218,auditorium and cafeteria.remedy:maintain building make all the necessary re
Jan 2, 2001
Resolve - Non-hazardous
Failure to maintain. defects are: at playground clogged drains causing water accumulation/backups. remedy: maintian bldg, make all necessary repairs.
Jan 2, 2001
Resolve - Non-hazardous
Failure to maintain exterior bldg wall. defects are: 1)roof leaks at rm 316, 319, 318, auditorium, cafeteria & rm 218, 2)roof leaks at hallway adjacent to room 316, 319 and 318. remedy: maintain bldg, make a
Jan 2, 2001
Resolve - Non-hazardous
Faialur eot provide 3 fl numbering signs on all fls failure to provide 3 id signs at all staircase landings remedy provide letters numbers at all staircase landing and fls per ll 16/84
Jul 19, 1999
Resolve - Non-hazardous
Failure toprovide emergency lights at 2nd 3rd fls failure to provide emergency power to exit lights at 2nd 3rd fls remedy provide emergency lights and emergency power per ll 16/84 and bec standards
Jul 19, 1999
Resolve - Non-hazardous
Failure to maintain exterior. defects are: 1) water damage from roof or walls. plaster is spalling. 2) water leaking from marquee, "front steps" class room 316 & 318. remedy: make all necessary repair.
Apr 15, 1999
Resolve
Complaints
- Heat/hot water
Entire building
Jan 18, 2024 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- School building (W1)
- Year built
- 1960
- Floors
- 2
- Residential units
- —
- Building area
- 65,000 ft²
- Lot area
- 53,073 ft²
- Zoning
- R6
- Community board
- 201
- Council district
- 8
- Block / lot
- 2324 / 8
- Assessed value
- $5,246,100
- Landmark / historic district
- No
Questions about 502 Morris Avenue
Who owns 502 Morris Avenue?
The owner of record in NYC Department of City Planning PLUTO data is NYC Department Of Education.
Does 502 Morris Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 502 Morris Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 502 Morris Avenue built?
City records list 1960 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.