290 East 149th Street

Bronx, NY 10451BBL 2-02330-0016Map

Owner of record: Hp 292 East 149th Street Housing Develop Ment Fund

290 East 149th Street is an elevator apartment building built in 2024 in Bronx, 10451. It has 164 residential units. The owner of record is Hp 292 East 149th Street Housing Develop Ment Fund. HPD has recorded 10 housing violations here, most recently on May 11, 2026.

HPD violations
10
DOB violations
9
ECB violations
28
HPD complaints
6

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation May 11, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 10

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 11, 2026

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Mar 27, 2017

    Closed — Violation closed
  • A

    Replace with new the missing ....eletrical outlet cover at south wall in the 1st room from north located at apt 2fl, 2nd story, 1st apartment from north at east

    Mar 24, 2017 · Apt 2FL

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in uniform color ...north wall in the 1st room from north located at apt 2fl, 2nd story, 1st apartment from north at east

    Mar 24, 2017 · Apt 2FL

    Closed — Violation dismissed
  • A

    Properly repair with similar material the broken or defective ...wood floor in the 1st room from north located at apt 2fl, 2nd story, 1st apartment from north at east

    Mar 24, 2017 · Apt 2FL

    Closed — Violation dismissed
  • C

    Repair the broken or defective plastered surfaces and paint in uniform color ......ceiling in the bathroom located at apt 2fl, 2nd story, 1st apartment from north at east

    Mar 24, 2017 · Apt 2FL

    Closed — Violation closed
  • B

    Replace with new the broken or defective ....glass pane at upper sash 2nd window from east at south in the kitchen located at apt 2fl, 2nd story, 1st apartment from north at east

    Mar 24, 2017 · Apt 2FL

    Closed — Violation dismissed
  • B

    Abate the nuisance consisting of mice in the entire apartment located at apt 2fl, 2nd story, 1st apartment from north at east

    Mar 24, 2017 · Apt 2FL

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 0; wg to repair = 0; throughout in the entire apartment located at apt 2fl, 2nd story, 1st apartment from north at east

    Mar 24, 2017 · Apt 2FL

    Closed — Violation closed
  • B

    Abate the nuisance consisting of bedbugs in the entire apartment located at apt 2fl, 2nd story, 1st apartment from north at east

    Mar 24, 2017 · Apt 2FL

    Closed — Violation dismissed

DOB building violations · 9

  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 13, 2022

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 2, 2022

    Dob violation - dismissed
  • Immediate emergency anythingoptional

    Erect approximately 35 linear feet of sidewalk along exposure #01 to safeguard the public and property

    Dec 6, 2021

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boiler boiler optional

    B-boiler boiler optional

    Mar 29, 1989

    Dob violation - dismissed

ECB violations · 28

  • Class - 2

    3303.3 watchperson. at a 10 story new building building approximately 16,656 square feet. site closed and there were no construction activity. upon shouting at perimeter and banging on fence and door to alert

    Aug 23, 2025 · Penalty $2,500

    Resolve
  • Class - 1

    At time of my inspection i observed a closed 10 story building jobsite.i noticed on street yodak barrier not comply to manufacture specification, i noticed detached and not filled half way with sand or water.th

    Jul 5, 2025 · Penalty $2,500

    Resolve
  • Class - 2

    3303.3.watchperson.at a proposed 10 story building closed jobsite with building footprint of 16,656.i shouted into jobsite, knocked on door multiple times.no was made available or present onsite.as per code foo

    Jul 5, 2025 · Penalty $2,500

    Resolve
  • Class - 2

    At a closed padlocked 10 story building i noticed a storage zone with excavator and material adjacent to sidewalk shed inadequate 4ft barrier as per code section3307.4.7 work or storage zones.this creates a uns

    Jul 5, 2025 · Penalty $2,400

    Resolve
  • Class - 2

    Construction fence swing gate exp3 swings into public space hazard to pedestrians leads to injuries or fatal,bc3307.7.2 stipulates swing gate shall not swing into areas accessible to the public. maintain constr

    Jun 7, 2025

    Resolve
  • Class - 2

    At time of inspection observed active suspended scaffolds. upon inspecting platform configuration for both altrex and skyclimber observed platforms that fail to conform with manufacture configurations. three pl

    Jan 2, 2025 · Penalty $1,250

    Resolve
  • Class - 2

    At time of inspection observed active suspended scaffolds. upon inspecting suspended scaffold drawings notice discrepancies. on the layout it shows outrigger beam installed only on top of one bulkhead but it is

    Jan 2, 2025

    Resolve
  • Class - 2

    A 10 story active site. observed work contrary to site safety plans ssp- 104.00. observed adjoining property roof protection was inadequate not fully protected missing protection on parapet wall coping stones o

    Nov 26, 2024

    Resolve
  • Class - 2

    A 10 story active site. observed work contrary to site safety plans ssp- 104.00. sidewalk shed not in place on sidewalk. shed re located inisde of jobsite approximately 50 linear feet at exp#1 of tower b. contr

    Nov 26, 2024

    Resolve
  • Class - 2

    A 10 story active site. observed construction equipment onsite. 1st floor tower b chain material hoist in place attached to concrete ceiling with steel angle. also observed makeshift platform in elevator shaft

    Nov 26, 2024 · Penalty $1,250

    Resolve
Show 18 more ↓
  • Class - 2

    10 story active site. observed active work on suspended scaffolds at exp#1 onsite of tower b.inspection of roof observed 3 scaffolding walk thru frames on roof & bulkhead with additional frame on bulkhead. upon

    Nov 26, 2024

    Resolve
  • Class - 1

    10 story active site. observed active work on suspended scaffolds at exp#1 onsite of tower b. upon request for supervisor onsite for worker's on suspended scaffolds. kivie a vega only had 40 hour site safety tr

    Nov 26, 2024

    Resolve
  • Class - 2

    10 story active site. observed active work on suspended scaffolds at exp#1 onsite of tower b.upon inspection of all suspended scaffolds onsite.outrigger beams not installed according to code 3314.6.3 wire ropes

    Nov 26, 2024 · Penalty $2,500

    Resolve
  • Class - 1

    At time of inspection, observed two towers under same permit number both currently actively working. upon inspecting unenclosed perimeter notice inadequate guardrail cable system on multiple floors on both towe

    Sep 13, 2024 · Penalty $5,000

    Resolve
  • Class - 2

    A proposed 10 story active site 4 floor working deck. observed structural work being performed. with no active structural permit in dobnow/bis records. upon request to general contractor for structural permit n

    May 21, 2024

    Resolve
  • Class - 1

    10 story nb active site. observed shed in place at exp#1 in front of jobsite extended 20 ft to the front of an occupied building at 288 east 149 street. overhead protection shed at rear of occupied building at

    May 21, 2024 · Penalty $5,000

    Resolve
  • Class - 1

    Proposed 10 story nb active site at 4 floor level. observed multiple worker's performing rebar/structural work. worker's were tied off to rebars w/o proper anchorage points. guardrails were also inadequate work

    May 21, 2024 · Penalty $5,000

    Resolve
  • Class - 1

    A proposed 10 story nb active site at 4 floor working deck. observed active work at exp#2,4. worker's performing structural work/rebar at leading edges. adjoining properties windows were not protected bc3309.14

    May 21, 2024 · Penalty $5,000

    Resolve
  • Class - 2

    Bc3307.2.1 observed office trailer @ exposure 3 entrance of jobsite at roadway of 148th street. upon review of documents, no department of transportation(d.o.t) permit to place office trailer on 148th street r

    Mar 15, 2024 · Penalty $2,500

    Resolve
  • Class - 1

    3310-02 concrete safety managers-concrete safety manger not present onsite during ongoing concrete operations taking place consisting of setting steel for foundation, form work and installation of stay-form. re

    Jan 10, 2024 · Penalty $2,500

    Resolve
  • Class - 1

    Ongoing concrete operations @expo1 with openings to adjacent properties @expo 2&4. expo 4 deliveries taking place street level and concrete washout with other materials street level not enclosed.review of site

    Jan 10, 2024 · Penalty $2,500

    Resolve
  • Class - 1

    Miscellaneous violation. 28-110.2 phased site safety plaans-observed ongoing concrete operations at exposure one of jobsite consisting of rebar and stay-form installation. adjacent properties at exposure 2 and

    Jan 10, 2024 · Penalty $5,000

    Resolve
  • Class - 1

    Observed workers setting steel and installing stay-form/form work, all related to concrete operations. reviewed daily pre shift meeting stating and confirming the scope of work taking place. review of bis show

    Jan 10, 2024 · Penalty $12,500

    Resolve
  • Class - 1

    Failure to provide protection at sides of excavation. at time of inspection observed two workers in excavation approx. 8 feet no support at sides of excavation no eggress ladder observed. as well as no eggress

    Oct 23, 2023 · Penalty $5,000

    Resolve
  • Class - 2

    Temporary construction fencing dob permit# x00699016 expired on 04/20/2023. no active permit on file., renew permit

    Jun 28, 2023

    Resolve
  • Class - 2

    Temporary construction fencing at exposure#1 broken back bracing. fencing is leaning towards sidewalk., comply with code

    Jun 28, 2023

    Resolve
  • Class - 1

    Failure to maintain building in code compliant manner.noted at time ofmy inspection i observed at exp1 at roof level the parapet roof above approx 25ft of parapet line in state of disrepair condition with missi

    Jan 19, 2022 · Penalty $3,125

    Resolve
  • Class - 1

    At time of inspection observed approx. 25'-0" roof parapet line instate of disrepair conditions with missing & loose parapet siding and exposed interior framing at expo # 01 over the pedestrians sidewalk. also

    Dec 3, 2021 · Penalty $3,125

    Resolve

Complaints

  • Water leak

    Heavy flow

    Feb 17, 2021 · Apt BLDG

    Close
  • Safety

    Window guard broken/missing

    Mar 17, 2017 · Apt 2FL

    Close
  • Unsanitary condition

    Pests

    Mar 17, 2017 · Apt 2FL

    Close
  • Door/window

    Window frame

    Mar 17, 2017 · Apt 2FL

    Close
  • Unsanitary condition

    Pests

    Mar 17, 2017 · Apt 2FL

    Close
  • Paint/plaster

    Ceiling

    Mar 17, 2017 · Apt 2FL

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D7)
Year built
2024
Floors
—
Residential units
164
Building area
126,216 ft²
Lot area
25,625 ft²
Zoning
C4-4
Community board
201
Council district
17
Block / lot
2330 / 16
Assessed value
$9,175,050
Landmark / historic district
No

HPD registration #229504, last renewed Jun 5, 2026.

Questions about 290 East 149th Street

Who owns 290 East 149th Street?

The owner of record in NYC Department of City Planning PLUTO data is Hp 292 East 149th Street Housing Develop Ment Fund.

Does 290 East 149th Street have violations?

Yes. NYC HPD has recorded 10 housing violations at this property.

Is 290 East 149th Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 290 East 149th Street built?

City records list 2024 as the year it was built.

How many apartments are in 290 East 149th Street?

It has 164 residential units and 165 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.