290 East 149th Street
Bronx, NY 10451BBL 2-02330-0016Map
Owner of record: Hp 292 East 149th Street Housing Develop Ment Fund
290 East 149th Street is an elevator apartment building built in 2024 in Bronx, 10451. It has 164 residential units. The owner of record is Hp 292 East 149th Street Housing Develop Ment Fund. HPD has recorded 10 housing violations here, most recently on May 11, 2026.
- HPD violations
- 10
- DOB violations
- 9
- ECB violations
- 28
- HPD complaints
- 6
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 10
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 11, 2026
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 27, 2017
Closed — Violation closed - ANon-hazardous
Replace with new the missing ....eletrical outlet cover at south wall in the 1st room from north located at apt 2fl, 2nd story, 1st apartment from north at east
Mar 24, 2017 · Apt 2FL
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color ...north wall in the 1st room from north located at apt 2fl, 2nd story, 1st apartment from north at east
Mar 24, 2017 · Apt 2FL
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective ...wood floor in the 1st room from north located at apt 2fl, 2nd story, 1st apartment from north at east
Mar 24, 2017 · Apt 2FL
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color ......ceiling in the bathroom located at apt 2fl, 2nd story, 1st apartment from north at east
Mar 24, 2017 · Apt 2FL
Closed — Violation closed - BHazardous
Replace with new the broken or defective ....glass pane at upper sash 2nd window from east at south in the kitchen located at apt 2fl, 2nd story, 1st apartment from north at east
Mar 24, 2017 · Apt 2FL
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 2fl, 2nd story, 1st apartment from north at east
Mar 24, 2017 · Apt 2FL
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 0; wg to repair = 0; throughout in the entire apartment located at apt 2fl, 2nd story, 1st apartment from north at east
Mar 24, 2017 · Apt 2FL
Closed — Violation closed - BHazardous
Abate the nuisance consisting of bedbugs in the entire apartment located at apt 2fl, 2nd story, 1st apartment from north at east
Mar 24, 2017 · Apt 2FL
Closed — Violation dismissed
DOB building violations · 9
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 13, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 2, 2022
Dob violation - dismissed - Immediate emergency anythingoptional
Erect approximately 35 linear feet of sidewalk along exposure #01 to safeguard the public and property
Dec 6, 2021
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boiler boiler optional
B-boiler boiler optional
Mar 29, 1989
Dob violation - dismissed
ECB violations · 28
- Class - 2
3303.3 watchperson. at a 10 story new building building approximately 16,656 square feet. site closed and there were no construction activity. upon shouting at perimeter and banging on fence and door to alert
Aug 23, 2025 · Penalty $2,500
Resolve - Class - 1
At time of my inspection i observed a closed 10 story building jobsite.i noticed on street yodak barrier not comply to manufacture specification, i noticed detached and not filled half way with sand or water.th
Jul 5, 2025 · Penalty $2,500
Resolve - Class - 2
3303.3.watchperson.at a proposed 10 story building closed jobsite with building footprint of 16,656.i shouted into jobsite, knocked on door multiple times.no was made available or present onsite.as per code foo
Jul 5, 2025 · Penalty $2,500
Resolve - Class - 2
At a closed padlocked 10 story building i noticed a storage zone with excavator and material adjacent to sidewalk shed inadequate 4ft barrier as per code section3307.4.7 work or storage zones.this creates a uns
Jul 5, 2025 · Penalty $2,400
Resolve - Class - 2
Construction fence swing gate exp3 swings into public space hazard to pedestrians leads to injuries or fatal,bc3307.7.2 stipulates swing gate shall not swing into areas accessible to the public. maintain constr
Jun 7, 2025
Resolve - Class - 2
At time of inspection observed active suspended scaffolds. upon inspecting platform configuration for both altrex and skyclimber observed platforms that fail to conform with manufacture configurations. three pl
Jan 2, 2025 · Penalty $1,250
Resolve - Class - 2
At time of inspection observed active suspended scaffolds. upon inspecting suspended scaffold drawings notice discrepancies. on the layout it shows outrigger beam installed only on top of one bulkhead but it is
Jan 2, 2025
Resolve - Class - 2
A 10 story active site. observed work contrary to site safety plans ssp- 104.00. observed adjoining property roof protection was inadequate not fully protected missing protection on parapet wall coping stones o
Nov 26, 2024
Resolve - Class - 2
A 10 story active site. observed work contrary to site safety plans ssp- 104.00. sidewalk shed not in place on sidewalk. shed re located inisde of jobsite approximately 50 linear feet at exp#1 of tower b. contr
Nov 26, 2024
Resolve - Class - 2
A 10 story active site. observed construction equipment onsite. 1st floor tower b chain material hoist in place attached to concrete ceiling with steel angle. also observed makeshift platform in elevator shaft
Nov 26, 2024 · Penalty $1,250
Resolve
Show 18 more ↓
- Class - 2
10 story active site. observed active work on suspended scaffolds at exp#1 onsite of tower b.inspection of roof observed 3 scaffolding walk thru frames on roof & bulkhead with additional frame on bulkhead. upon
Nov 26, 2024
Resolve - Class - 1
10 story active site. observed active work on suspended scaffolds at exp#1 onsite of tower b. upon request for supervisor onsite for worker's on suspended scaffolds. kivie a vega only had 40 hour site safety tr
Nov 26, 2024
Resolve - Class - 2
10 story active site. observed active work on suspended scaffolds at exp#1 onsite of tower b.upon inspection of all suspended scaffolds onsite.outrigger beams not installed according to code 3314.6.3 wire ropes
Nov 26, 2024 · Penalty $2,500
Resolve - Class - 1
At time of inspection, observed two towers under same permit number both currently actively working. upon inspecting unenclosed perimeter notice inadequate guardrail cable system on multiple floors on both towe
Sep 13, 2024 · Penalty $5,000
Resolve - Class - 2
A proposed 10 story active site 4 floor working deck. observed structural work being performed. with no active structural permit in dobnow/bis records. upon request to general contractor for structural permit n
May 21, 2024
Resolve - Class - 1
10 story nb active site. observed shed in place at exp#1 in front of jobsite extended 20 ft to the front of an occupied building at 288 east 149 street. overhead protection shed at rear of occupied building at
May 21, 2024 · Penalty $5,000
Resolve - Class - 1
Proposed 10 story nb active site at 4 floor level. observed multiple worker's performing rebar/structural work. worker's were tied off to rebars w/o proper anchorage points. guardrails were also inadequate work
May 21, 2024 · Penalty $5,000
Resolve - Class - 1
A proposed 10 story nb active site at 4 floor working deck. observed active work at exp#2,4. worker's performing structural work/rebar at leading edges. adjoining properties windows were not protected bc3309.14
May 21, 2024 · Penalty $5,000
Resolve - Class - 2
Bc3307.2.1 observed office trailer @ exposure 3 entrance of jobsite at roadway of 148th street. upon review of documents, no department of transportation(d.o.t) permit to place office trailer on 148th street r
Mar 15, 2024 · Penalty $2,500
Resolve - Class - 1
3310-02 concrete safety managers-concrete safety manger not present onsite during ongoing concrete operations taking place consisting of setting steel for foundation, form work and installation of stay-form. re
Jan 10, 2024 · Penalty $2,500
Resolve - Class - 1
Ongoing concrete operations @expo1 with openings to adjacent properties @expo 2&4. expo 4 deliveries taking place street level and concrete washout with other materials street level not enclosed.review of site
Jan 10, 2024 · Penalty $2,500
Resolve - Class - 1
Miscellaneous violation. 28-110.2 phased site safety plaans-observed ongoing concrete operations at exposure one of jobsite consisting of rebar and stay-form installation. adjacent properties at exposure 2 and
Jan 10, 2024 · Penalty $5,000
Resolve - Class - 1
Observed workers setting steel and installing stay-form/form work, all related to concrete operations. reviewed daily pre shift meeting stating and confirming the scope of work taking place. review of bis show
Jan 10, 2024 · Penalty $12,500
Resolve - Class - 1
Failure to provide protection at sides of excavation. at time of inspection observed two workers in excavation approx. 8 feet no support at sides of excavation no eggress ladder observed. as well as no eggress
Oct 23, 2023 · Penalty $5,000
Resolve - Class - 2
Temporary construction fencing dob permit# x00699016 expired on 04/20/2023. no active permit on file., renew permit
Jun 28, 2023
Resolve - Class - 2
Temporary construction fencing at exposure#1 broken back bracing. fencing is leaning towards sidewalk., comply with code
Jun 28, 2023
Resolve - Class - 1
Failure to maintain building in code compliant manner.noted at time ofmy inspection i observed at exp1 at roof level the parapet roof above approx 25ft of parapet line in state of disrepair condition with missi
Jan 19, 2022 · Penalty $3,125
Resolve - Class - 1
At time of inspection observed approx. 25'-0" roof parapet line instate of disrepair conditions with missing & loose parapet siding and exposed interior framing at expo # 01 over the pedestrians sidewalk. also
Dec 3, 2021 · Penalty $3,125
Resolve
Complaints
- Water leak
Heavy flow
Feb 17, 2021 · Apt BLDG
Close - Safety
Window guard broken/missing
Mar 17, 2017 · Apt 2FL
Close - Unsanitary condition
Pests
Mar 17, 2017 · Apt 2FL
Close - Door/window
Window frame
Mar 17, 2017 · Apt 2FL
Close - Unsanitary condition
Pests
Mar 17, 2017 · Apt 2FL
Close - Paint/plaster
Ceiling
Mar 17, 2017 · Apt 2FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 2024
- Floors
- —
- Residential units
- 164
- Building area
- 126,216 ft²
- Lot area
- 25,625 ft²
- Zoning
- C4-4
- Community board
- 201
- Council district
- 17
- Block / lot
- 2330 / 16
- Assessed value
- $9,175,050
- Landmark / historic district
- No
HPD registration #229504, last renewed Jun 5, 2026.
Questions about 290 East 149th Street
Who owns 290 East 149th Street?
The owner of record in NYC Department of City Planning PLUTO data is Hp 292 East 149th Street Housing Develop Ment Fund.
Does 290 East 149th Street have violations?
Yes. NYC HPD has recorded 10 housing violations at this property.
Is 290 East 149th Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 290 East 149th Street built?
City records list 2024 as the year it was built.
How many apartments are in 290 East 149th Street?
It has 164 residential units and 165 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.