4996 Broadway

Manhattan, NY 10034BBL 1-02229-0005Map

Owner of record: Broadway-Inwood Corp.

4996 Broadway is a walk-up apartment building built in 1925 in Manhattan, 10034. It has 51 residential units across 5 floors. The owner of record is Broadway-Inwood Corp.. HPD has recorded 635 housing violations here, most recently on October 2, 2026. 23 of the 50 most recent violations are still open. City tax records listed 59 rent-stabilized apartments here in 2024.

HPD violations
635
DOB violations
7
ECB violations
14
HPD complaints
921

What to know

Concern
15 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Oct 2, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
59
About 100% of the building's 51 apartments
Up from 58 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 635

  • C

    Replace or repair the self-closing doors that is missing or defective latch set at east bulkhead door to roof

    Oct 2, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective latch set at door leading to east yard at public hall, 1st story

    Oct 2, 2026

    Open — Nov sent out
  • C

    Immediately provide a fire guard as directed by the nyc dept. of housing preservation & development (hpd) and/or the nyc dept. of buildings (dob) to protect against fire hazards observed by hpd and/or dob. fire hazards observed by hpd have resulted in the following additional hpd violation(s): viol.# 19273501 in order to protect public safety against imminent fire hazards observed, a fire guard must be provided forthwith for continuous 24 hour coverage, notwithstanding the correction and certification dates set forth above (the correction and certification dates set forth above are applicable for purposes of civil penalties that may be assessed pursuant to nyc administrative code § 27-2115, but do not reflect the date by which a fire guard must be provided). a fire guard must be provided immediately due to the exigency of the dangerous fire hazard conditions observed. the violation requiring a fire guard to be provided will remain open until such time as the fire hazards resulting in the hpd violation(s) referenced above and/or the fire hazards resulting in related dob violation(s) have been dismissed.

    Oct 1, 2026

    Open — Nov sent out
  • C

    Provide a safe and adequate supply of electric service to the fixtures at all walls and ceilings throughout all stories at public hall

    Oct 1, 2026

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective latch at building entrance door

    Oct 1, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective latch at vestibule door

    Oct 1, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective latch at door leading to east yard at public hall, 1st story

    Oct 1, 2026

    Open — Nov sent out
  • A

    Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page

    Sep 1, 2026

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective heavy duty lock at the door at vestibule entrance to the building , 1st story

    Sep 1, 2026

    Open — Not complied with
  • C

    Replace or repair the self-closing doors that is missing or defective latch at building entrance , 2nd story

    Aug 17, 2026

    Closed — Violation dismissed
Show 40 more ↓
  • C

    Replace or repair the self-closing doors that is missing or defective latch at vestibule to public hall , 2nd story

    Aug 17, 2026

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective latch at vestibule door , 2nd story

    Aug 17, 2026

    Open — Not complied with
  • C

    Replace or repair the self-closing doors that is missing or defective latch set at door leading to east yard at public hall, 1st story

    Aug 16, 2026

    Open — Not complied with
  • C

    Replace or repair the self-closing doors that is missing or defective latch set at building entrance door

    Aug 16, 2026

    Open — Not complied with
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3k, 3rd story, 1st apartment from south at west

    Aug 16, 2026 · Apt 3K

    Open — First no access to re- inspect violation
  • C

    Provide ready access to buildings heating system door locked at cellar at boiler room

    Aug 16, 2026

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 4l, 4th story, 1st apartment from west at north

    Aug 16, 2026 · Apt 4L

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective latch set at vestibule door at public hall, 1st story

    Mar 25, 2026

    Open — Not complied with
  • C

    Replace or repair the self-closing doors that is missing or defective latch set at vestibule door at public hall, 1st story

    Mar 25, 2026

    Open — Not complied with
  • B

    Properly repair or replace the broken or defective latch set at building entrance door

    Mar 25, 2026

    Open — Not complied with
  • C

    Replace or repair the self-closing doors that is missing or defective latch set at building entrance door

    Mar 25, 2026

    Open — Not complied with
  • C

    Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 5m, 5th story, 2nd apartment from west at north

    Mar 25, 2026 · Apt 5M

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroom located at apt 5m, 5th story, 2nd apartment from west at north

    Mar 25, 2026 · Apt 5M

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective counter balance at upper and lower window sashes at south wall in the bathroom located at apt 5m, 5th story, 2nd apartment from west at north

    Mar 25, 2026 · Apt 5M

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 4th room from north located at apt 5m, 5th story, 2nd apartment from west at north

    Mar 25, 2026 · Apt 5M

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective counter balance at upper and lower window sashes at 1st window from west at north wall in the 2nd room from north located at apt 5m, 5th story, 2nd apartment from west at north

    Mar 25, 2026 · Apt 5M

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 2nd room from north located at apt 5m, 5th story, 2nd apartment from west at north

    Mar 25, 2026 · Apt 5M

    Open — Not complied with
  • C

    Properly repair or replace the broken or defective counter balance at upper and lower window sashes at 2nd window from west at north wall. in the 1st room from north located at apt 5m, 5th story, 2nd apartment from west at north

    Mar 25, 2026 · Apt 5M

    Open — Not complied with
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 1st room from north located at apt 5m, 5th story, 2nd apartment from west at north

    Mar 25, 2026 · Apt 5M

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective counter balance at upper and lower window sashes at 1st window from west at north wall in the 1st room from north located at apt 5m, 5th story, 2nd apartment from west at north

    Mar 25, 2026 · Apt 5M

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the foyer located at apt 5m, 5th story, 2nd apartment from west at north

    Mar 25, 2026 · Apt 5M

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the foyer located at apt 5m, 5th story, 2nd apartment from west at north

    Mar 25, 2026 · Apt 5M

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective mortise lock at entrance door in the entrance located at apt 5m, 5th story, 2nd apartment from west at north

    Mar 25, 2026 · Apt 5M

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 5m, 5th story, 2nd apartment from west at north

    Mar 25, 2026 · Apt 5M

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 5m, 5th story, 2nd apartment from west at north

    Mar 25, 2026 · Apt 5M

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 5m, 5th story, 2nd apartment from west at north

    Mar 25, 2026 · Apt 5M

    Open — Not complied with
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 5m, 5th story, 2nd apartment from west at north

    Mar 25, 2026 · Apt 5M

    Open — Not complied with
  • B

    Properly repair or replace the broken or defective outlet switch at south wall in the kitchen located at apt 5a, 5th story, 4th apartment from east at south

    Mar 7, 2026 · Apt 5A

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east at south located at apt 5a, 5th story, 4th apartment from east at south

    Mar 7, 2026 · Apt 5A

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak at ceiling in the 3rd room from east at south located at apt 5a, 5th story, 4th apartment from east at south

    Mar 7, 2026 · Apt 5A

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 1st room from east at south located at apt 5a, 5th story, 4th apartment from east at south

    Mar 7, 2026 · Apt 5A

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak at ceiling in the 1st room from east at south located at apt 5a, 5th story, 4th apartment from east at south

    Mar 7, 2026 · Apt 5A

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective latch set at vestibule door at public hall, 1st story

    Jan 19, 2026

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at apartment entrance door in the entrance located at apt 5h, 6th story, 1st apartment from south at west

    Dec 10, 2025 · Apt 5H

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 5h, 6th story, 1st apartment from south at west

    Dec 10, 2025 · Apt 5H

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 5h, 6th story, 1st apartment from south at west

    Dec 10, 2025 · Apt 5H

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor close to radiator at east in the 4th room from east located at apt 5h, 6th story, 1st apartment from south at west

    Dec 10, 2025 · Apt 5H

    Open — Not complied with
  • B

    Properly repair with similar material the broken or defective wood floor close to radiator at north in the 2nd room from east located at apt 5h, 6th story, 1st apartment from south at west

    Dec 10, 2025 · Apt 5H

    Open — Not complied with
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east located at apt 5c, 6th story, 1st apartment from north at east , section ''north''

    Dec 10, 2025 · Apt 5C

    Open — First no access to re- inspect violation
  • B

    Repair the roof so that it will not leak above the ceiling in the 3rd room from east located at apt 5c, 6th story, 1st apartment from north at east , section ''north''

    Dec 10, 2025 · Apt 5C

    Open — First no access to re- inspect violation

DOB building violations · 7

  • Retaining wall none

    Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09

    Dec 15, 2022

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Apr 29, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 17, 2019

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed

ECB violations · 14

  • Class - 2

    Failure to maintain building in code-compliant manner. as noted: at time of inspection observed retaining wall(rw) along exposure #4 of the subject address(4996 broadway). the rw was observed and measured to be

    Apr 11, 2026 · Penalty $6,250

    Active
  • Class - 2

    1rcny 103-09(e). failure to file a retaining wall condition assessmentreport by the deadline as required by 1rcny 103-09(e)(2) and (5). to date, the department has not recieved a retaining wall condition assess

    Feb 25, 2025

    Resolve
  • Class - 1

    Failure to maintain retaining wall in a safe condition.noted: at the time of inspection we noted that at the side of the bld.(along exposure #2)directly adjacent to a public school, the existing retaining wall

    Dec 6, 2018

    Resolve
  • Class - 2

    Erect wrap-around illuminated sign;12ft along west 212 st.& 12ft along broadway,w/inscription"broadway deli&grill".all work done w/o permit.rem:comply w/notice of violation.

    May 22, 2017

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliance manner. noted: at time of inspection observed eroding masonry & loose bricks at rear retaining wall. approx 20feet length & 5feet height from the top at south section

    Apr 28, 2017 · Penalty $500

    Resolve
  • Class - 2

    Work w/o a permit.work noted: having installed 3 ale split units on facade exp2 at 1st flr level (for deli and grill) w/o obtaining all approvals and permits from dept of bldg. 100% work completed.rmdy:obtain

    Jan 15, 2017

    Resolve
  • Class - 2

    Failure to maintain bldg walls noted: @ front entrance the east side of stairs wall (retaining) has loose @ north side near alley the masonry is cracked loose missing @ time of inspection. remedy: make safe mai

    Aug 13, 2010 · Penalty $500

    Resolve
  • Class - 1

    Failure to maintain building in code-compliant manner: improper exit /exit access doorway arrangement per bc 1014.2 27-361 noted: apt #4e-4th flr has blocked secondary means of egress to the fire escape stairs

    Sep 8, 2009 · Penalty $1,200

    Resolve
  • Class - 1

    Failure to provide unobstructed exit passageway noted several large cardboard cartons piled up haphazardly approx 24" dp at base of fire escape & two large containers stored directly in the exit passageway note

    Sep 4, 2009 · Penalty $1,200

    Resolve
  • Non-hazardous

    Failure to maintain exterior bldg wall.noted:at main entrance to multiple dwelling-brick masonary cracked displaced,bulged and dislodged over vault and at decorative corbel near steps at sidewalk.remedy:make

    Sep 9, 2003

    Resolve
Show 4 more ↓
  • Non-hazardous

    Use of illegal hardware. at nena restaurant. noted: drop ceiling not install as per code. ceiling is supported on wire. remedy: remove illegal hardware and install as per code.

    Feb 25, 2002 · Penalty $180

    Resolve
  • Non-hazardous

    49a / 49b/ 49a) to work on burner ( smoke) and to ajust burner 49b) to change bell & gossett pump

    Nov 13, 2001

    Resolve
  • Hazardous

    Failure to maintain exterior building wall. noted: 1) leaning & brokenparapet wall approx 50 feet at north side of bldg. at roof comenging at n/w corner. 2)leaning & broken parapet wall approx 100 feet long at

    Sep 24, 1998

    Resolve
  • Non-hazardous

    Work without a permit. work noted: complete renovation laundromat at 1st. floor with new concrete pads 10" thick 4 fl.wide 16ft long 2# for washer and for 5 new gas dryer. new suspended coiling water lines, and

    Oct 12, 1993 · Penalty $1,000

    Resolve

Complaints

  • Electric

    Power outage

    Oct 2, 2026 · Apt BLDG

    Close
  • Electric

    Power outage

    Oct 2, 2026 · Apt BLDG

    Close
  • Electric

    Power outage

    Oct 2, 2026 · Apt BLDG

    Close
  • Electric

    Power outage

    Oct 2, 2026 · Apt BLDG

    Close
  • Electric

    Power outage

    Oct 1, 2026 · Apt 3I

    Close
  • Electric

    Power outage

    Oct 1, 2026 · Apt BLDG

    Close
  • Electric

    Power outage

    Oct 1, 2026 · Apt BUILDI

    Close
  • Electric

    Power outage

    Oct 1, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 1, 2026 · Apt 3I

    Close
  • Heat/hot water

    Entire building

    Sep 13, 2026 · Apt BLDG

    Close
Show 40 more ↓
  • General

    Bell/buzzer/intercom

    Sep 8, 2026 · Apt 5H

    Close
  • Heat/hot water

    Entire building

    Aug 31, 2026 · Apt 5B

    Close
  • Door/window

    Door

    Aug 26, 2026 · Apt 5B

    Close
  • Heat/hot water

    Entire building

    Aug 17, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Aug 17, 2026 · Apt BLDG

    Close
  • Door/window

    Door

    Aug 16, 2026 · Apt 5B

    Close
  • Door/window

    Door

    Aug 16, 2026 · Apt 5B

    Close
  • Heat/hot water

    Entire building

    Aug 16, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Aug 15, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Aug 14, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Aug 6, 2026 · Apt 4K

    Open
  • Unsanitary condition

    Pests

    Jul 20, 2026 · Apt 4K

    Open
  • Heat/hot water

    Apartment only

    Apr 10, 2026 · Apt 1D

    Close
  • Heat/hot water

    Apartment only

    Apr 2, 2026 · Apt 1D

    Close
  • Heat/hot water

    Apartment only

    Mar 29, 2026 · Apt 1D

    Close
  • Heat/hot water

    Apartment only

    Mar 29, 2026 · Apt 1D

    Close
  • Heat/hot water

    Apartment only

    Mar 29, 2026 · Apt 1D

    Close
  • Heat/hot water

    Entire building

    Mar 28, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Mar 24, 2026 · Apt 1D

    Close
  • Heat/hot water

    Apartment only

    Mar 24, 2026 · Apt 1D

    Close
  • Heat/hot water

    Apartment only

    Mar 19, 2026 · Apt 1D

    Close
  • Heat/hot water

    Apartment only

    Mar 15, 2026 · Apt 1D

    Close
  • Heat/hot water

    Apartment only

    Mar 14, 2026 · Apt 1D

    Close
  • Plumbing

    Toilet

    Mar 11, 2026 · Apt 1D

    Close
  • Heat/hot water

    Apartment only

    Mar 7, 2026 · Apt 1D

    Close
  • Heat/hot water

    Apartment only

    Mar 4, 2026 · Apt 1D

    Close
  • Heat/hot water

    Apartment only

    Mar 3, 2026 · Apt 1D

    Close
  • Plumbing

    Toilet

    Mar 1, 2026 · Apt 1D

    Close
  • Plumbing

    Toilet

    Mar 1, 2026 · Apt 1D

    Close
  • Heat/hot water

    Entire building

    Feb 24, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Feb 24, 2026 · Apt 1D

    Close
  • Heat/hot water

    Entire building

    Feb 8, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 8, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 7, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 6, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 31, 2026 · Apt 1F

    Close
  • Heat/hot water

    Apartment only

    Jan 31, 2026 · Apt 1D

    Close
  • Heat/hot water

    Entire building

    Jan 31, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 30, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 30, 2026 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C7)
Year built
1925
Floors
5
Residential units
51
Building area
55,015 ft²
Lot area
14,300 ft²
Zoning
R7A
Community board
112
Council district
10
Block / lot
2229 / 5
Assessed value
$1,958,400
Landmark / historic district
No

HPD registration #104511, last renewed Jul 23, 2026.

Questions about 4996 Broadway

Who owns 4996 Broadway?

The owner of record in NYC Department of City Planning PLUTO data is Broadway-Inwood Corp..

Does 4996 Broadway have violations?

Yes. NYC HPD has recorded 635 housing violations at this property.

Is 4996 Broadway rent stabilized?

NYC Department of Finance tax bills listed 59 rent-stabilized units here in 2024 (about 100% of its 51 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 4996 Broadway built?

City records list 1925 as the year it was built.

How many apartments are in 4996 Broadway?

It has 51 residential units and 58 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.