531 West 211 Street
Manhattan, NY 10034BBL 1-02229-0046Map
Owner of record: Champ Inwood Co
531 West 211 Street is a walk-up apartment building built in 1926 in Manhattan, 10034. It has 42 residential units across 5 floors. The owner of record is Champ Inwood Co. HPD has recorded 629 housing violations here, most recently on September 30, 2026. 24 of the 50 most recent violations are still open. City tax records listed 41 rent-stabilized apartments here in 2024.
- HPD violations
- 629
- DOB violations
- 4
- ECB violations
- 5
- HPD complaints
- 1,164
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 629
- BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at vestibule , 1st story
Sep 30, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 21a, 2nd story, 2nd apartment from south at west
Sep 30, 2026 · Apt 21A
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... observed less then 10 square feet at ceiling in the bathroom located at apt 21a, 2nd story, 2nd apartment from south at west
Sep 30, 2026 · Apt 21A
Open — Notice of issuance sent to tenant - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the bathroom located at apt 21a, 2nd story, 2nd apartment from south at west
Sep 30, 2026 · Apt 21A
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 52a, 5th story, 1st apartment from south at west
Aug 1, 2026 · Apt 52A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 2nd closet from north at east wall door in the private hallway located at apt 52a, 5th story, 1st apartment from south at west
Aug 1, 2026 · Apt 52A
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the bathroom located at apt 52a, 5th story, 1st apartment from south at west
Aug 1, 2026 · Apt 52A
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the kitchen located at apt 52a, 5th story, 1st apartment from south at west
Aug 1, 2026 · Apt 52A
Open — Certification postponment granted - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead paint that is xrf tested inconclusive at 0.5 mg/cm2 (28 rcny §11-07(b)) from required window and/or door friction surfaces and make floors smooth and cleanable, in an apartment with a child under six located at apt 52a, 5th story, 1st apartment from south at west
Aug 1, 2026 · Apt 52A
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the 1st room from north at east located at apt 52a, 5th story, 1st apartment from south at west
Aug 1, 2026 · Apt 52A
Open — Certification postponment granted
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from north located at apt 52a, 5th story, 1st apartment from south at west
Aug 1, 2026 · Apt 52A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at east wall, baseboard at west wall in the foyer located at apt 52a, 5th story, 1st apartment from south at west
Aug 1, 2026 · Apt 52A
Open — Certification postponment granted - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st riser from north at east wall in the kitchen located at apt 52a, 5th story, 1st apartment from south at west
Aug 1, 2026 · Apt 52A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st closet from north at east wall door frame, 1st closet from north at east wall door, 2nd closet from north at east wall door frame in the private hallway located at apt 52a, 5th story, 1st apartment from south at west
Aug 1, 2026 · Apt 52A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the bathroom located at apt 52a, 5th story, 1st apartment from south at west
Aug 1, 2026 · Apt 52A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door frame from north at east wall in the bathroom located at apt 52a, 5th story, 1st apartment from south at west
Aug 1, 2026 · Apt 52A
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st riser from north at east wall in the bathroom located at apt 52a, 5th story, 1st apartment from south at west
Aug 1, 2026 · Apt 52A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 51b, 5th story, 1st apartment from east at south
Jul 29, 2026 · Apt 51B
Open — Civ14 mailed - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at throughout yard
Jul 29, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 51b, 5th story, 1st apartment from east at south
Jul 29, 2026 · Apt 51B
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 22a, 2nd story, 1st apartment from south at west
Jul 29, 2026 · Apt 22A
Open — Notice of issuance sent to tenant - BHazardous
M/d law abate the nuisance consisting of air conditioner at egress window leading to fire escape 1st window from east at south wall in the 3rd room from north at west located at apt 2a, 1st story, 1st apartment from east at south
Jul 29, 2026 · Apt 2A
Open — Civ14 mailed - ANon-hazardous
Properly repair or replace the broken or defective rubber gaskets at upper and lower refrigerator doors in the kitchen located at apt 21a, 2nd story, 1st apartment from south at west
Jun 23, 2026 · Apt 21A
Closed — Violation closed - ANon-hazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 21a, 2nd story, 1st apartment from south at west
Jun 23, 2026 · Apt 21A
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hydraulic door closer at front entrance door to building
May 16, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building front entrance door , 1st story
May 2, 2026
Closed — Violation closed - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
May 2, 2026
Closed — Violation closed - BHazardous
Repair the broken or defective connection at basin sink in the bathroom located at apt 21a, 2nd story, 1st apartment from south at west
Apr 15, 2026 · Apt 21A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at cejiling in the bathroom located at apt 21a, 2nd story, 1st apartment from south at west
Apr 15, 2026 · Apt 21A
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 21a, 2nd story, 1st apartment from south at west
Apr 15, 2026 · Apt 21A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 21a, 2nd story, 1st apartment from south at west
Apr 15, 2026 · Apt 21A
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 21a, 2nd story, 1st apartment from south at west
Apr 15, 2026 · Apt 21A
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective electrical outlet at north in the kitchen located at apt 21a, 2nd story, 1st apartment from south at west
Apr 15, 2026 · Apt 21A
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set at vestibule door at public hall, 1st story
Mar 27, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at vestibule door at public hall, 1st story
Mar 27, 2026
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at east yard
Mar 13, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance door
Mar 10, 2026
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at vestibule door to public hall
Mar 10, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance door
Mar 4, 2026
Open — Not complied with - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 34b, 3rd story, 1st apartment from north at east
Mar 1, 2026 · Apt 34B
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 34b, 3rd story, 1st apartment from north at east
Mar 1, 2026 · Apt 34B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 34b, 3rd story, 1st apartment from north at east
Mar 1, 2026 · Apt 34B
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 31, 3rd story, 1st apartment from east at south
Feb 13, 2026 · Apt 31
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 52a, 5th story, 1st apartment from south at west
Feb 13, 2026 · Apt 52A
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 52a, 5th story, 1st apartment from south at west
Feb 13, 2026 · Apt 52A
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Feb 13, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 31, 3rd story, 1st apartment from east at south
Feb 13, 2026 · Apt 31
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules inoperable in the entire apartment located at apt 32a, 3rd story, 1st apartment from south at west , section at east
Jan 17, 2026 · Apt 32A
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations inoperable in the entire apartment located at apt 32a, 3rd story, 1st apartment from south at west , section at east
Jan 17, 2026 · Apt 32A
Closed — Violation closed - BHazardous
Properly secure the loose mortise lock at door in the entrance located at apt 32a, 3rd story, 1st apartment from south at west , section at east
Jan 17, 2026 · Apt 32A
Closed — Violation closed
DOB building violations · 4
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2024
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2023
Dob violation - active - Construction other optional
Failure to maintain, observed severe fire damage in apt. 3-a and apt. 1-2 b
Oct 2, 2023
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - active
ECB violations · 5
- Class - 2
Failure to maintain bldg in code compliant manner. noted: at time of inspection observed eroding masonry & loose bricks at rear retaining wall approx 20feet length x approx 5feet height from the top at north
Apr 28, 2017 · Penalty $530
Resolve - Class - 2
Failure to maintain bldg in code-compliant manner. defects noted: at time of inspection retaining wall has large pieces of stone missing from wall at base of large tree,tree limbs are leaning/brown by fire esca
Dec 27, 2012 · Penalty $2,500
Resolve - Class - 3
B354/16/32a/50a/15/21a/34b/50a-remove all storage from boiler room
Jun 27, 2011 · Penalty $500
Resolve - Class - 2
Failure to maintain defect:concrete coping stone above parapet @ frontof bldg are cracked, broken and deteriorating.eroded brick mortar joints @ various locations.rem:immediately repair defects
Apr 28, 2011 · Penalty $500
Active - Non-hazardous
Failure top maintain exterior building wall defect isw brick parapet is out of plumb and leaning inward approx 6" located at the roof level front east and entrance courtyard west wall remedy make all repairs to
Jan 18, 1989 · Penalty $250
Resolve
Complaints
- Heat/hot water
Entire building
Oct 19, 2026 · Apt BLDG
Open - Unsanitary condition
Mold
Sep 14, 2026 · Apt 21A
Close - Water leak
Damp spot
Sep 14, 2026 · Apt 21A
Close - Heat/hot water
Apartment only
Jul 29, 2026 · Apt 32A
Close - Heat/hot water
Entire building
Jul 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 21, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Jun 5, 2026 · Apt 34B
Close - Plumbing
Bathtub/shower
Jun 5, 2026 · Apt 34B
Close - Water leak
Damp spot
May 8, 2026 · Apt 32A
Close - Water leak
Slow leak
May 8, 2026 · Apt 32A
Close
Show 40 more ↓
- Plumbing
Basin/sink
Apr 3, 2026 · Apt 21A
Close - Paint/plaster
Ceiling
Apr 3, 2026 · Apt 21A
Close - Plumbing
Bathtub/shower
Apr 3, 2026 · Apt 21A
Close - Paint/plaster
Window/frame
Apr 3, 2026 · Apt 21A
Close - Plumbing
Toilet
Apr 3, 2026 · Apt 21A
Close - Water leak
Damp spot
Apr 3, 2026 · Apt 21A
Close - Unsanitary condition
Mold
Apr 3, 2026 · Apt 21A
Close - Water leak
Slow leak
Apr 3, 2026 · Apt 21A
Close - Heat/hot water
Entire building
Mar 26, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 26, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Mar 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 12, 2026 · Apt BLDG
Close - Electric
Power outage
Feb 19, 2026 · Apt 34B
Close - Unsanitary condition
Pests
Feb 19, 2026 · Apt 34B
Close - Flooring/stairs
Floor
Feb 18, 2026 · Apt 43B
Close - Flooring/stairs
Floor
Feb 18, 2026 · Apt 43B
Close - Plumbing
Basin/sink
Feb 18, 2026 · Apt 43B
Close - Plumbing
Bathtub/shower
Feb 18, 2026 · Apt 43B
Close - Water leak
Slow leak
Feb 18, 2026 · Apt 43B
Close - Heat/hot water
Entire building
Feb 16, 2026 · Apt 23B
Close - Heat/hot water
Entire building
Feb 16, 2026 · Apt 31A
Close - Heat/hot water
Entire building
Feb 16, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 16, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 14, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 14, 2026 · Apt 22A
Close - Heat/hot water
Entire building
Feb 14, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 14, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 14, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 14, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 13, 2026 · Apt 43B
Close - Heat/hot water
Apartment only
Feb 13, 2026 · Apt 22A
Close - Heat/hot water
Apartment only
Feb 13, 2026 · Apt 42B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1926
- Floors
- 5
- Residential units
- 42
- Building area
- 25,315 ft²
- Lot area
- 7,494 ft²
- Zoning
- R7A
- Community board
- 112
- Council district
- 10
- Block / lot
- 2229 / 46
- Assessed value
- $832,050
- Landmark / historic district
- No
HPD registration #105849, last renewed Jul 29, 2025.
Questions about 531 West 211 Street
Who owns 531 West 211 Street?
The owner of record in NYC Department of City Planning PLUTO data is Champ Inwood Co.
Does 531 West 211 Street have violations?
Yes. NYC HPD has recorded 629 housing violations at this property.
Is 531 West 211 Street rent stabilized?
NYC Department of Finance tax bills listed 41 rent-stabilized units here in 2024 (about 98% of its 42 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 531 West 211 Street built?
City records list 1926 as the year it was built.
How many apartments are in 531 West 211 Street?
It has 42 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.