roofy

100 Overlook Terrace

Manhattan, NY 10040BBL 1-02180-0450Map

Owner of record: Overlook Towers Corp

100 Overlook Terrace is an elevator apartment building built in 1963 in Manhattan, 10040. It has 171 residential units across 6 floors. The owner of record is Overlook Towers Corp. HPD has recorded 69 housing violations here, most recently on August 14, 2023. 1 of the 50 most recent violations are still open. City tax records listed 7 rent-stabilized apartments here in 2024.

HPD violations
69
DOB violations
32
ECB violations
18
HPD complaints
113

Available now in this building

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Aug 14, 2023

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
7
About 4% of the building's 171 apartments
Down from 12 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 69

  • A

    Properly secure the loose radiator cover in the 2nd room from east located at apt 619, 6th story, 1st apartment from north at east

    Aug 14, 2023 · Apt 619

    Closed — Violation closed
  • B

    Provide adequate supply of hot water for the fixtures at wash basin in the 1st bathroom from east located at apt 619, 6th story, 1st apartment from north at east

    Aug 14, 2023 · Apt 619

    Closed — Violation closed
  • A

    Properly secure the loose radiator cover in the 4th room from east located at apt 619, 6th story, 1st apartment from north at east

    Aug 14, 2023 · Apt 619

    Closed — Violation closed
  • A

    Properly secure the loose radiator cover in the 3rd room from east located at apt 619, 6th story, 1st apartment from north at east

    Aug 14, 2023 · Apt 619

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 619, 6th story, 1st apartment from north at east

    Aug 14, 2023 · Apt 619

    Closed — Violation closed
  • C

    Remove device preventing door from being self-closing permanent device installed (kickstand) at public hall, 1st story

    May 30, 2023

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hopper door at compactor closet, 6th story

    May 30, 2023

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective repair hinges to make compactor closet door self closing at compactor closet, 6th story

    May 30, 2023

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective door to compactor closet at compactor closet, 1st story

    May 30, 2023

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the private hallway located at apt 619, 6th story, 1st apartment from north at east

    May 30, 2023 · Apt 619

    Closed — Violation closed
Show 40 more ↓
  • B

    Properly repair with similar material the broken or defective ceramic floor tile in the bathroom located at apt 619, 6th story, 1st apartment from north at east

    May 30, 2023 · Apt 619

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 619, 6th story, 1st apartment from north at east

    May 30, 2023 · Apt 619

    Closed — Violation closed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 619, 6th story, 1st apartment from north at east

    May 30, 2023 · Apt 619

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective gasket at refridgerator lolwer door in the kitchen located at apt 619, 6th story, 1st apartment from north at east

    May 30, 2023 · Apt 619

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 619, 6th story, 1st apartment from north at east

    Feb 20, 2023 · Apt 619

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the north wall in the 3rd room from north at east located at apt 619, 6th story, 1st apartment from north at east , section at south

    Nov 7, 2022 · Apt 619

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling in the 1st room from north located at apt 619, 6th story, 1st apartment from north at east , section at south

    Nov 7, 2022 · Apt 619

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 619, 6th story, 1st apartment from north at east , section at south

    Nov 7, 2022 · Apt 619

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Nov 7, 2022

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Nov 7, 2022

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 619, 6th story, 1st apartment from north at east , section at south

    Nov 7, 2022 · Apt 619

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the east wall in the private hallway located at apt 619, 6th story, 1st apartment from north at east , section at south

    Nov 7, 2022 · Apt 619

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the 2nd bathroom from east located at apt 619, 6th story, 1st apartment from north at east , section at south

    Nov 7, 2022 · Apt 619

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic tiles at north wall in the 2nd bathroom from east located at apt 619, 6th story, 1st apartment from north at east , section at south

    Nov 7, 2022 · Apt 619

    Closed — Violation closed
  • A

    Properly repair the broken or defective wood closet door in the 1st room from north located at apt 619, 6th story, 1st apartment from south at west

    Sep 26, 2022 · Apt 619

    Closed — Violation closed
  • A

    Replace with new the missing room's entrance door in the 2nd room from north located at apt 619, 6th story, 1st apartment from south at west

    Sep 26, 2022 · Apt 619

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 619, 6th story, 1st apartment from south at west

    Sep 26, 2022 · Apt 619

    Closed — Violation closed
  • A

    Replace with new the broken or defective sink's cabinet in the kitchen located at apt 619, 6th story, 1st apartment from south at west

    Sep 26, 2022 · Apt 619

    Closed — Violation closed
  • A

    Repair the leaky and/or defective faucets at bathtub in the 1st bathroom from north located at apt 619, 6th story, 1st apartment from south at west

    Sep 26, 2022 · Apt 619

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective rubber gasket/ seal on refrigerator's lower door in the kitchen located at apt 619, 6th story, 1st apartment from south at west

    Sep 26, 2022 · Apt 619

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at west wall in the 1st room from north located at apt 619, 6th story, 1st apartment from south at west

    Sep 26, 2022 · Apt 619

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, north and south walls in the private hallway located at apt 619, 6th story, 1st apartment from south at west

    Sep 26, 2022 · Apt 619

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the closet in the 2nd room from north located at apt 619, 6th story, 1st apartment from south at west

    Sep 26, 2022 · Apt 619

    Closed — Violation closed
  • A

    Properly secure the loose radiator cover at west wall in the 2nd room from north located at apt 619, 6th story, 1st apartment from south at west

    Sep 26, 2022 · Apt 619

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic tiles at north wall in the 1st bathroom from north located at apt 619, 6th story, 1st apartment from south at west

    Sep 26, 2022 · Apt 619

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... approx 15sqft at west wall in the closet in the 1st room from north located at apt 619, 6th story, 1st apartment from south at west

    Sep 26, 2022 · Apt 619

    Closed — Violation closed
  • A

    Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd bathroom from north located at apt 619, 6th story, 1st apartment from south at west

    Sep 26, 2022 · Apt 619

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 619, 6th story, 1st apartment from south at west

    Sep 26, 2022 · Apt 619

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceilings throughout in the entire apartment located at apt 619, 6th story, 1st apartment from south at west

    Sep 26, 2022 · Apt 619

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 9, 2018

    Closed — Violation dismissed
  • A

    Replace with new the broken or defective sink base cabinet in the kitchen located at apt 518, 5th story, 5th apartment from north at east

    Oct 31, 2016 · Apt 518

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation radiator at north wall in the kitchen located at apt 518, 5th story, 5th apartment from north at east

    Oct 31, 2016 · Apt 518

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the kitchen located at apt 518, 5th story, 5th apartment from north at east

    Oct 31, 2016 · Apt 518

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 1st room from north at west located at apt 518, 5th story, 5th apartment from north at east

    Oct 31, 2016 · Apt 518

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic tiles at south and west walls in the bathroom located at apt 518, 5th story, 5th apartment from north at east

    Oct 31, 2016 · Apt 518

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation radiator at east wall in the 1st room from north at west located at apt 518, 5th story, 5th apartment from north at east

    Oct 31, 2016 · Apt 518

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroom located at apt 518, 5th story, 5th apartment from north at east

    Oct 31, 2016 · Apt 518

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall in the 3rd room from north located at apt 518, 5th story, 5th apartment from north at east

    Oct 31, 2016 · Apt 518

    Open — Not complied with
  • A

    Repair leaky water closet flush pipe connection water closet flush pipe leaking in the bathroom located at apt 518, 5th story, 5th apartment from north at east

    Oct 31, 2016 · Apt 518

    Closed — Violation closed
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet .(water closet not flushing properly) in the bathroom located at apt 518, 5th story, 5th apartment from north at east

    Oct 31, 2016 · Apt 518

    Closed — Violation closed

DOB building violations · 32

  • Construction other optional

    Partial vacate order due to loose/cracked/spalling bricks, concrete, and mortar joints on exposure #1 south elevation of neighboring building (801 west 190th street, mn) remedy: vacate entire yard/pool area at exposure #2 north elevation due to hazardous conditions at neighboring building (801 west 190th street.)

    Oct 24, 2025

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 3, 2024

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 7, 2024

    Dob violation - dismissed
  • Construction other optional

    Emergency work order occupied parking structure spalling concrete& exposed from beam.& slab @several locations causing an immed.haz.to vehicular&pedestrian traffic,req.immed.safety measures to be implement remedy:retain nys reg.design prof.to direct&superv.immed.install.safet measure fulltime superv.of rdp prov.daily reports to parking structure

    Nov 29, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Retaining wall none

    Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09

    Dec 15, 2022

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 23, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst

    May 30, 2014

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 3, 2013

    Dob violation - resolved
Show 22 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 3, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 3, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 10, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 10, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 10, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 20, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 20, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 20, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 26, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 26, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 26, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 10, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 10, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 10, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    1p26251

    Apr 27, 2000

    Dob violation - resolved
  • Elevator elevatorrequired

    1p26252

    Apr 27, 2000

    Dob violation - resolved
  • Elevator elevatorrequired

    1p26253

    Apr 27, 2000

    Dob violation - resolved
  • Elevator elevatorrequired

    1p26251

    Apr 19, 1999

    Dob violation - resolved
  • Elevator elevatorrequired

    1p26252

    Apr 19, 1999

    Dob violation - resolved
  • Elevator elevatorrequired

    1p26253

    Apr 19, 1999

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Elevator elevatorrequired

    (15)floor numbers (17)vision guard 8th floor

    Dec 22, 1989

    Dob violation - resolved

ECB violations · 18

  • Class - 2

    1rcny 103-09(e). failure to file a retaining wall condition assessmentreport by the deadline as required by 1rcny 103-09(e)(2) and (5). to date, the department has not recieved a retaining wall condition assess

    Feb 25, 2025

    Resolve
  • Class - 1

    Unlawful acts. failure to comply with commissioner's order. note: respondent failure to comply prior summon #35679812r dated(01/12/24). at time of inspection, i observed an occupied(1) level parking structure,

    Apr 15, 2024 · Penalty $12,500

    Resolve
  • Class - 1

    Unlawful acts, failure to comply with commissioner's order. note: respondent has prior summon #35675421l dated (11/29/2023) issued to secure public safety. at time of inspection, observed no safety measure prov

    Jan 12, 2024 · Penalty $2,500

    Active
  • Class - 1

    28-323.1 failure to maintain parking structure in safe condition. note: at the time of inspection observed, spalling concrete exposed re-bar from beam and ceiling/slab of the parking garage at several locations

    Nov 29, 2023 · Penalty $2,500

    Resolve
  • Class - 1

    28-323.8 and rcny 103-13(5) failure to secure public safety and/or make the building's structure and appurtenances conform to the provisions of the administrative code after unsafe notification unps-m0003517 fi

    Nov 29, 2023 · Penalty $2,500

    Active
  • Class - 2

    3301.9.1.project infomation panel.at time of inspecton of a 6 story building with facade work being worked on,i observed sidewalk shed erected with missing information panel with name of contractor and phone nu

    Mar 10, 2021 · Penalty $6,250

    Active
  • Class - 2

    3301.9.2.6.maintance of sidewalk shed parapet panels.at time of inspection of a 6 story alt 2 facade job i observed sidewalk shed parapet paels inadequately maintained with staggering heights and some panels no

    Mar 10, 2021 · Penalty $6,250

    Active
  • Class - 2

    Phone not working

    Jan 26, 2021 · Penalty $1,562

    Resolve
  • Class - 2

    Phone not working

    Jan 26, 2021 · Penalty $1,562

    Resolve
  • Class - 3

    Work w/o a permit. noted: observed at time of inspection construced a storage facilit under the first floor staircase w/o permit. the size of the storage area apprx 11'wide 7'high 4'depth. 100% work completed

    Mar 2, 2019 · Penalty $250

    Resolve
Show 8 more ↓
  • Class - 1

    Failure to maintain building in code compliant manner. lack of a system of automatic sprinklers where required per bc 903.2; 27-954 at time of inspection at the above address on the above date i observed in bui

    Oct 23, 2018 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to submit a required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#807314. remedy: submit required technical report

    Oct 15, 2018 · Penalty $3,125

    Resolve
  • Class - 2

    42i10.11 42i10.11 relay is buzzing loud repair repair replace as neede d

    Sep 23, 2009

    Resolve
  • Non-hazardous

    28q03.38x10.64x10.08j01 28q03-provide guard for top of car operator 38x10-repair top ogf car light 64x10-repair pit light 08j01-adjust car leveling all floors

    Jan 22, 2008

    Resolve
  • Hazardous

    Work contrary to approved dob plans and applications operation of hoisting equipment in an un safe manner. multiple unsafe condition exist (1) in sufficient counter weight on outrigger beams (2) two platforms

    Oct 18, 2006 · Penalty $4,500

    Resolve
  • Non-hazardous

    74x11,22d06.74-repair fire service reset button 22-lock from top

    Sep 20, 2000

    Resolve
  • Non-hazardous

    39h,50f.

    Mar 4, 1996

    Resolve
  • Non-hazardous

    39h,46h,50f.

    Mar 4, 1996

    Resolve

Complaints

  • Flooring/stairs

    Floor

    Jul 20, 2026 · Apt 79

    Close
  • Flooring/stairs

    Floor

    Jun 24, 2026 · Apt 79

    Close
  • Flooring/stairs

    Floor

    May 13, 2026 · Apt 79

    Close
  • Heat/hot water

    Entire building

    Jan 18, 2026 · Apt 79

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jan 9, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jan 9, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Jan 9, 2026 · Apt 624

    Close
  • Heat/hot water

    Apartment only

    Dec 27, 2025 · Apt 79

    Close
  • Unsanitary condition

    Pests

    Dec 10, 2025 · Apt 314

    Close
  • Unsanitary condition

    Pests

    Dec 8, 2025 · Apt 323

    Close
Show 40 more ↓
  • Unsanitary condition

    Pests

    Oct 8, 2025 · Apt 323

    Close
  • Unsanitary condition

    Pests

    Oct 8, 2025 · Apt 323

    Close
  • Unsanitary condition

    Pests

    Sep 21, 2025 · Apt 323

    Close
  • Paint/plaster

    Ceiling

    Jul 22, 2025 · Apt 817

    Close
  • Paint/plaster

    Ceiling

    Jul 16, 2025 · Apt 817

    Close
  • Paint/plaster

    Ceiling

    May 16, 2025 · Apt 817

    Close
  • Appliance

    Electric/gas range

    Jul 10, 2024 · Apt 412

    Close
  • Flooring/stairs

    Floor

    Jul 17, 2023 · Apt 619

    Close
  • Unsanitary condition

    Pests

    Jul 17, 2023 · Apt 619

    Close
  • Appliance

    Refrigerator

    Jul 17, 2023 · Apt 619

    Close
  • Plumbing

    Basin/sink

    Nov 16, 2022 · Apt 619

    Close
  • Unsanitary condition

    Pests

    Nov 16, 2022 · Apt 619

    Close
  • Appliance

    Refrigerator

    Nov 16, 2022 · Apt 619

    Close
  • Unsanitary condition

    Pests

    Oct 26, 2022 · Apt 619

    Close
  • Paint/plaster

    Wall

    Oct 26, 2022 · Apt 619

    Close
  • Appliance

    Refrigerator

    Sep 23, 2022 · Apt 619

    Close
  • Unsanitary condition

    Mold

    Sep 23, 2022 · Apt 619

    Close
  • Paint/plaster

    Ceiling

    Sep 23, 2022 · Apt 619

    Close
  • Plumbing

    Bathtub/shower

    Jan 21, 2019 · Apt 120

    Close
  • Elevator

    Maintenance

    May 24, 2017 · Apt 4J

    Close
  • Electric

    Lighting

    May 24, 2017 · Apt 4J

    Close
  • Door/window

    Door

    May 24, 2017 · Apt 4J

    Close
  • Unsanitary condition

    Pests

    May 24, 2017 · Apt 4J

    Close
  • Unsanitary condition

    Pests

    May 24, 2017 · Apt 4J

    Close
  • Paint/plaster

    Wall

    May 24, 2017 · Apt 4J

    Close
  • Flooring/stairs

    Floor

    May 24, 2017 · Apt 4J

    Close
  • Safety

    Window guard broken/missing

    May 24, 2017 · Apt 4J

    Close
  • Paint/plaster

    Wall

    May 24, 2017 · Apt 4J

    Close
  • Paint/plaster

    Wall

    Oct 25, 2016 · Apt 518

    Close
  • Plumbing

    Radiator

    Oct 25, 2016 · Apt 518

    Close
  • Paint/plaster

    Wall

    Oct 25, 2016 · Apt 518

    Close
  • Plumbing

    Radiator

    Oct 25, 2016 · Apt 518

    Close
  • General

    Cabinet

    Oct 25, 2016 · Apt 518

    Close
  • Paint/plaster

    Ceiling

    Oct 25, 2016 · Apt 518

    Close
  • Plumbing

    Toilet

    Oct 25, 2016 · Apt 518

    Close
  • Flooring/stairs

    Floor

    Oct 25, 2016 · Apt 518

    Close
  • Plumbing

    Basin/sink

    Jan 9, 2015 · Apt 817

    Close
  • Flooring/stairs

    Floor

    Jan 9, 2015 · Apt 817

    Close
  • Heat/hot water

    Entire building

    Dec 10, 2014 · Apt 88

    Close
  • Heating

    Heat related

    Jan 20, 2014 · Apt 820

    Close

Sales history

DatePriceTypeUnits
Jun 12, 2026$480,150Coops - elevator apartments—
Jun 5, 2026Non-market transferCoops - elevator apartments—
May 5, 2026Non-market transferCoops - elevator apartments—
Apr 23, 2026Non-market transferCoops - elevator apartments—
Mar 23, 2026Non-market transferCoops - elevator apartments—
Nov 6, 2025$365,000Coops - elevator apartments—
Oct 30, 2025Non-market transferCoops - elevator apartments—
Oct 22, 2025$640,000Coops - elevator apartments—
Oct 8, 2025$710,000Coops - elevator apartments—

Building details

Building type
Elevator apartment building (D4)
Year built
1963
Floors
6
Residential units
171
Building area
142,470 ft²
Lot area
56,450 ft²
Zoning
R7-2
Community board
112
Council district
10
Block / lot
2180 / 450
Assessed value
$5,773,050
Landmark / historic district
No

HPD registration #138509, last renewed Jul 30, 2025.

Questions about 100 Overlook Terrace

Who owns 100 Overlook Terrace?

The owner of record in NYC Department of City Planning PLUTO data is Overlook Towers Corp.

Does 100 Overlook Terrace have violations?

Yes. NYC HPD has recorded 69 housing violations at this property.

Is 100 Overlook Terrace rent stabilized?

NYC Department of Finance tax bills listed 7 rent-stabilized units here in 2024 (about 4% of its 171 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 100 Overlook Terrace built?

City records list 1963 as the year it was built.

How many apartments are in 100 Overlook Terrace?

It has 171 residential units and 172 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.