200 Bennett Avenue
Manhattan, NY 10040BBL 1-02180-0474Map
Owner of record: Unavailable Owner
200 Bennett Avenue is an elevator apartment building built in 1950 in Manhattan, 10040. It has 49 residential units across 6 floors. The owner of record is Unavailable Owner. HPD has recorded 7 housing violations here, most recently on February 15, 2022. 2 of the 7 most recent violations are still open. City tax records listed 47 rent-stabilized apartments here in 2024.
- HPD violations
- 7
- DOB violations
- 10
- ECB violations
- 4
- HPD complaints
- 27
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 7
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 15, 2022
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the 2nd room from east located at apt 6g, 6th story, 1st apartment from south at west
Jan 8, 2020 · Apt 6G
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department south & east walls in the 2nd room from east located at apt 6g, 6th story, 1st apartment from south at west
Jan 8, 2020 · Apt 6G
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 6g, 6th story, 1st apartment from south at west
Jan 8, 2020 · Apt 6G
Closed — Violation dismissed - ANon-hazardous
Properly repair the broken or defective wood cabinet at east wall in the kitchen located at apt 6g, 6th story, 1st apartment from south at west
Jan 8, 2020 · Apt 6G
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color bathroom ceiling shower stall 5 sty northeast apt 5c. , section '' ''
Sep 5, 1989 · Apt 5C
Open — Nov certified late - BHazardous
Repair or replace the smoke detector defective 5 sty northeast apt 5c devereux. , section '' ''
Sep 5, 1989 · Apt 5C
Open — Nov certified late
DOB building violations · 10
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 27, 2013
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 1, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 10, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 20, 2004
Dob violation - resolved - Elevator elevatorrequired
1p8228
Apr 27, 2000
Dob violation - resolved - Elevator elevatorrequired
(03)handrails.(31)wiring for leveling unit.(35)window.(53)ungroud ed coming from main disconnect switch
Dec 28, 1989
Dob violation - resolved - Elevator elevatorrequired
(3)grilk (51)remove temporary wiring on each light (52)repair or renew motor room door and provide lock with available key (53) restore light in motor room
Jun 8, 1989
Dob violation - resolved - Elevator elevatorrequired
Properly tag governor after conducting 2yr safety test.properly wire car light.provide proper light in motor room. properly enclose wires on top of car. eliminate noise in shaft as car travels shaft
Sep 7, 1988
Dob violation - resolved
ECB violations · 4
- Class - 2
At time of inspection, failure to post tpp, and permits for job# m01240576-1i, ip8228. ada-non compliant. tpp should be posted prior to commencement of work to allow tenants to make arrangements, and inform mea
Sep 11, 2025 · Penalty $5,000
Resolve - Non-hazardous
66o02.64x10.20i10.38o02.85bb05.86bb05 66o02-clean dirty pit 64x10-repair pit light 20i10-repair basement vision panel 38o02-clean car top 85bb05-5 yr tag exp.08.02 86bb05-2 yr tag exp.05.01
Jan 23, 2008 · Penalty $350
Resolve - Non-hazardous
55i11,57o2,74m7,31a11,3m3,75u5,35p17. 3-cover off top of car 4x4 box.74-provide missing toe guard-removed. 31-electrical wiring to top of car run box provide proper repair.
Apr 8, 1999 · Penalty $180
Resolve - Non-hazardous
14q,35i,74d,31q. 35 wall and roof 74 work light.
Mar 11, 1994 · Penalty $200
Resolve
Complaints
- Heat/hot water
Apartment only
Oct 20, 2026 · Apt 2B
Open - Heat/hot water
Entire building
Mar 29, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 15, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 11, 2025 · Apt 6H
Close - Heat/hot water
Entire building
Feb 4, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 20, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 12, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
May 16, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 11, 2024 · Apt BLDG
Close - Plumbing
Toilet
Apr 24, 2023 · Apt 20B
Close
Show 17 more ↓
- Unsanitary condition
Pests
Apr 24, 2023 · Apt 2B
Close - Heat/hot water
Entire building
Mar 3, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 10, 2023 · Apt BLDG
Close - Unsanitary condition
Mold
Oct 31, 2022 · Apt 1B
Close - Heat/hot water
Entire building
Mar 23, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 13, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 18, 2020 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 1, 2019 · Apt BLDG
Close - Water leak
Damp spot
Oct 23, 2019 · Apt 6G
Close - Heat/hot water
Entire building
Oct 17, 2019 · Apt BLDG
Close - Heating
Heat related
Oct 26, 2013 · Apt 4D
Close - Heating
Heat related
Oct 29, 2012 · Apt 2H
Close - Plumbing
Water supply
Dec 19, 2011 · Apt 5G
Close - Plumbing
Bathtub/shower
Dec 19, 2011 · Apt 5G
Close - Heating
Heat related
Apr 28, 2010 · Apt 1A
Close - Nonconst
Rubbish
Jun 11, 2008 · Apt BUILD
Close - Heating
Heat related
Nov 9, 2004 · Apt APT6C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1950
- Floors
- 6
- Residential units
- 49
- Building area
- 55,505 ft²
- Lot area
- 17,150 ft²
- Zoning
- R7-2
- Community board
- 112
- Council district
- 10
- Block / lot
- 2180 / 474
- Assessed value
- $2,189,250
- Landmark / historic district
- No
HPD registration #100734, last renewed Aug 27, 2025.
Questions about 200 Bennett Avenue
Who owns 200 Bennett Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.
Does 200 Bennett Avenue have violations?
Yes. NYC HPD has recorded 7 housing violations at this property.
Is 200 Bennett Avenue rent stabilized?
NYC Department of Finance tax bills listed 47 rent-stabilized units here in 2024 (about 96% of its 49 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 200 Bennett Avenue built?
City records list 1950 as the year it was built.
How many apartments are in 200 Bennett Avenue?
It has 49 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.