roofy

411 East 90 Street

Manhattan, NY 10128BBL 1-01570-0009Map

Owner of record: Mccarthy 411 LLC

411 East 90 Street is a walk-up apartment building built in 1920 in Manhattan, 10128. It has 10 residential units across 5 floors. The owner of record is Mccarthy 411 LLC. HPD has recorded 158 housing violations here, most recently on April 29, 2026. 43 of the 50 most recent violations are still open. City tax records listed 4 rent-stabilized apartments here in 2024.

HPD violations
158
DOB violations
1
ECB violations
1
HPD complaints
232

What to know

Concern
12 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Apr 29, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
4
About 40% of the building's 10 apartments
Down from 5 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 158

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 29, 2026

    Closed — Violation dismissed
  • B

    Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.

    Jan 16, 2026

    Open — Nov sent out
  • C

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the entrance at basement

    Jan 16, 2026

    Closed — Violation dismissed
  • B

    Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.

    Sep 7, 2025

    Open — Invalid certification
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the ... at front areaway

    Sep 7, 2025

    Open — Nov sent out
  • B

    M/d law abate the nuisance consisting of ...push bar without reenter option install at fire door at bulkhead to the roof

    Sep 7, 2025

    Open — Invalid certification
  • C

    Replace or repair the self-closing doors that is missing or defective ...door and frame at bulkhead to the roof

    Sep 7, 2025

    Open — Nov certified late
  • B

    Repair or replace the carbon monoxide detecting device(s). missing located at apt 2w, 2nd story, 1st apartment from south at west

    Dec 13, 2022 · Apt 2W

    Open — Nov sent out
  • B

    Repair or replace the smoke detector missing located at apt 2w, 2nd story, 1st apartment from south at west

    Dec 13, 2022 · Apt 2W

    Open — Nov sent out
  • B

    Properly secure the loose electrical outlet at north wall in the kitchen located at apt 2w, 2nd story, 1st apartment from south at west

    Dec 13, 2022 · Apt 2W

    Open — Nov sent out
Show 40 more ↓
  • B

    Properly repair the broken or defective radiator shut off valve at south wall in the kitchen located at apt 2w, 2nd story, 1st apartment from south at west

    Dec 13, 2022 · Apt 2W

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 2w, 2nd story, 1st apartment from south at west

    Dec 13, 2022 · Apt 2W

    Open — Nov sent out
  • C

    Provide an adequate supply of gas to the fixtures at range, in the kitchen located at apt 2w, 2nd story, 1st apartment from south at west

    Dec 13, 2022 · Apt 2W

    Open — Nov sent out
  • C

    Abate the infestation consisting of rodents at building front court

    Nov 30, 2022

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 3, 2022

    Closed — Violation dismissed
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage and recycling material at front areaway

    Sep 28, 2022

    Open — Nov sent out
  • C

    Remove device preventing door from being self-closing hook and eye installed at building entrance , 1st story

    Sep 28, 2022

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective fire door at stair bulkhead to the roof , 5th story

    Sep 28, 2022

    Open — Invalid certification
  • C

    Abate the infestation consisting of rodents rats at front areaway

    Sep 28, 2022

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective at building entrance , 1st story

    Sep 28, 2022

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the 2nd room from north located at apt 2w, 2nd story, 1st apartment from south at west

    Sep 2, 2022 · Apt 2W

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from north at east wall, 1st door frame from north at east wall in the bathroom located at apt 2w, 2nd story, 1st apartment from south at west

    Sep 2, 2022 · Apt 2W

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall, 1st door frame from west at north wall in the 5th room from north located at apt 2w, 2nd story, 1st apartment from south at west

    Sep 2, 2022 · Apt 2W

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door, 1st door from north at east wall, 1st door frame from north at east wall in the 3rd room from north located at apt 2w, 2nd story, 1st apartment from south at west

    Sep 2, 2022 · Apt 2W

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 6th room from north, the foyer located at apt 2w, 2nd story, 1st apartment from south at west

    Sep 2, 2022 · Apt 2W

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling in the 3rd room from north located at apt 2w, 2nd story, 1st apartment from south at west

    Sep 2, 2022 · Apt 2W

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at 1st closet from west at north wall door, 1st window frame from south at west wall in the 5th room from north located at apt 2w, 2nd story, 1st apartment from south at west

    Sep 2, 2022 · Apt 2W

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation at 1st riser from south at west wall in the 5th room from north located at apt 2w, 2nd story, 1st apartment from south at west

    Sep 2, 2022 · Apt 2W

    Open — Nov sent out
  • B

    Properly repair the broken or defective mortise lock at door in the 5th room from north located at apt 2w, 2nd story, 1st apartment from south at west

    Sep 2, 2022 · Apt 2W

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 15, 2022

    Closed — Violation dismissed
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the yard

    Jan 1, 2022

    Open — Nov sent out
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at front areaway

    Jan 1, 2022

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door, 1st closet from east at south wall door frame, 1st door from north at east wall, 1st door frame from north at east wall, 1st window frame from south at west wall in the 3rd room from north located at apt 2w, 2nd story, 1st apartment from south at west

    Nov 22, 2021 · Apt 2W

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from north at east wall, 1st door frame from north at east wall, 1st window frame from south at west wall in the bathroom located at apt 2w, 2nd story, 1st apartment from south at west

    Nov 22, 2021 · Apt 2W

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the foyer located at apt 2w, 2nd story, 1st apartment from south at west

    Nov 22, 2021 · Apt 2W

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall, west wall in the 5th room from north located at apt 2w, 2nd story, 1st apartment from south at west

    Nov 22, 2021 · Apt 2W

    Open — Nov sent out
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the basement level floor building front

    Nov 22, 2021

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hot water fixtures, (159f found) located at apt 2w, 2nd story, 1st apartment from south at west

    Nov 22, 2021 · Apt 2W

    Closed — Violation dismissed
  • B

    Repair the broken or defective connection in waste line under sink in the kitchen located at apt 2w, 2nd story, 1st apartment from south at west

    Nov 22, 2021 · Apt 2W

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 6th room from north located at apt 2w, 2nd story, 1st apartment from south at west

    Nov 22, 2021 · Apt 2W

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 5th room from north located at apt 2w, 2nd story, 1st apartment from south at west

    Nov 22, 2021 · Apt 2W

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic tiles floor in the bathroom located at apt 2w, 2nd story, 1st apartment from south at west

    Nov 22, 2021 · Apt 2W

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the south wall, east wall in the 6th room from north located at apt 2w, 2nd story, 1st apartment from south at west

    Nov 22, 2021 · Apt 2W

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 1st riser from west at north wall in the bathroom located at apt 2w, 2nd story, 1st apartment from south at west

    Nov 22, 2021 · Apt 2W

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from west at north wall, 1st door from west at north wall, 1st closet from west at north wall door, 1st closet from west at north wall door frame in the 5th room from north located at apt 2w, 2nd story, 1st apartment from south at west

    Nov 22, 2021 · Apt 2W

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 1st riser from south at west wall in the 5th room from north located at apt 2w, 2nd story, 1st apartment from south at west

    Nov 22, 2021 · Apt 2W

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, north wall, south wall in the 5th room from north located at apt 2w, 2nd story, 1st apartment from south at west

    Nov 22, 2021 · Apt 2W

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from north located at apt 2w, 2nd story, 1st apartment from south at west

    Nov 22, 2021 · Apt 2W

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall, ceiling in the 2nd room from north located at apt 2w, 2nd story, 1st apartment from south at west

    Nov 22, 2021 · Apt 2W

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 1st riser from west at north wall in the kitchen located at apt 2w, 2nd story, 1st apartment from south at west

    Nov 22, 2021 · Apt 2W

    Open — Nov sent out

DOB building violations · 1

  • Construction other optional

    C-construction other optional

    May 3, 2001

    Vw*-violation - work w/o permit dismissed

ECB violations · 1

  • Non-hazardous

    Work without a permit.50% work completed noted:in aptse construction of new wall and partition with new 2x4 and new sheetrock without first obtaining a permit.rem:stop all work obtain all permits and approvals

    May 3, 2001

    Resolve

Complaints

  • Unsanitary condition

    Garbage/recycling storage

    Sep 24, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jun 5, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Sep 17, 2024 · Apt SIDEST

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Sep 17, 2024 · Apt SIDEST

    Close
  • Unsanitary condition

    Pests

    Sep 17, 2024 · Apt SIDEST

    Close
  • Appliance

    Electric/gas range

    Dec 4, 2022 · Apt 2W

    Close
  • Unsanitary condition

    Pests

    Nov 6, 2022 · Apt BASEME

    Close
  • Paint/plaster

    Wall

    Aug 12, 2022 · Apt 2W

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Apr 8, 2022 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Mar 23, 2022 · Apt BLDG

    Close
Show 40 more ↓
  • Unsanitary condition

    Garbage/recycling storage

    Mar 23, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 22, 2022 · Apt 2W

    Close
  • Safety

    Fire escape

    Dec 16, 2021 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Dec 16, 2021 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Dec 16, 2021 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Dec 12, 2021 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Dec 11, 2021 · Apt BLDG

    Close
  • Flooring/stairs

    Floor

    Nov 19, 2021 · Apt 2W

    Close
  • Appliance

    Electric/gas range

    Nov 19, 2021 · Apt 2W

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Sep 15, 2021 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Sep 4, 2021 · Apt BLDG

    Close
  • Paint/plaster

    Wall

    Aug 17, 2021 · Apt 2W

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Aug 17, 2021 · Apt 2W

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Feb 2, 2021 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 2, 2021 · Apt BLDG

    Close
  • Electric

    Power outage

    Feb 1, 2020 · Apt 1W

    Close
  • Electric

    Power outage

    Jan 29, 2020 · Apt 1W

    Close
  • Electric

    Power outage

    Jan 28, 2020 · Apt 1W

    Close
  • General

    Janitor/super

    Jan 26, 2020 · Apt 1W

    Close
  • Electric

    Power outage

    Jan 26, 2020 · Apt 1W

    Close
  • Paint/plaster

    Wall

    Dec 19, 2019 · Apt 2W

    Close
  • Heat/hot water

    Entire building

    Dec 19, 2019 · Apt BLDG

    Close
  • Electric

    Power outage

    Nov 18, 2019 · Apt 1W

    Close
  • Heat/hot water

    Entire building

    Nov 16, 2019 · Apt 2W

    Close
  • Electric

    Power outage

    Nov 14, 2019 · Apt 1W

    Close
  • Heat/hot water

    Entire building

    Oct 25, 2019 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Oct 25, 2019 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 19, 2019 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    May 24, 2019 · Apt 2W

    Close
  • Paint/plaster

    Wall

    May 24, 2019 · Apt 2W

    Close
  • Paint/plaster

    Wall

    May 24, 2019 · Apt 2W

    Close
  • Plumbing

    Radiator

    May 24, 2019 · Apt 2W

    Close
  • Appliance

    Electric/gas range

    May 24, 2019 · Apt 2W

    Close
  • Paint/plaster

    Wall

    May 24, 2019 · Apt 2W

    Close
  • Flooring/stairs

    Floor

    May 24, 2019 · Apt 2W

    Close
  • Flooring/stairs

    Floor

    May 24, 2019 · Apt 2W

    Close
  • Heat/hot water

    Entire building

    May 14, 2019 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    May 14, 2019 · Apt 2E

    Close
  • Heat/hot water

    Entire building

    Jan 14, 2019 · Apt 2E

    Close
  • Heat/hot water

    Entire building

    Nov 24, 2018 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C6)
Year built
1920
Floors
5
Residential units
10
Building area
9,180 ft²
Lot area
2,550 ft²
Zoning
C8-4
Community board
108
Council district
5
Block / lot
1570 / 9
Assessed value
$1,972,800
Landmark / historic district
No

HPD registration #106110, last renewed Oct 11, 2025.

Questions about 411 East 90 Street

Who owns 411 East 90 Street?

The owner of record in NYC Department of City Planning PLUTO data is Mccarthy 411 LLC.

Does 411 East 90 Street have violations?

Yes. NYC HPD has recorded 158 housing violations at this property.

Is 411 East 90 Street rent stabilized?

NYC Department of Finance tax bills listed 4 rent-stabilized units here in 2024 (about 40% of its 10 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 411 East 90 Street built?

City records list 1920 as the year it was built.

How many apartments are in 411 East 90 Street?

It has 10 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.