230 East 29 Street
Manhattan, NY 10016BBL 1-00909-0038Map
Owner of record: Rss Group, LLC
230 East 29 Street is a walk-up apartment building built in 1920 in Manhattan, 10016. It has 25 residential units across 6 floors. The owner of record is Rss Group, LLC. HPD has recorded 186 housing violations here, most recently on February 22, 2023. 14 of the 50 most recent violations are still open. City tax records listed 12 rent-stabilized apartments here in 2024.
- HPD violations
- 186
- DOB violations
- 20
- ECB violations
- 12
- HPD complaints
- 146
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 186
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door leading to west court at public hall, 1st story
Feb 22, 2023
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door at the building entrance , 1st story
Jun 11, 2022
Closed — Violation closed - ANon-hazardous
Provide approved metal screen below bulkhead skylight at roof
Jul 20, 2021
Open — Nov sent out - BHazardous
Provide security in event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at the building entrance door
Jul 20, 2021
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at the building entrance door
Jul 20, 2021
Open — Nov sent out - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder at fire escape building front
Jul 20, 2021
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 5th story balcony at fire escape building front
Jul 20, 2021
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 1, 1st story, 2nd apartment from east at south
Jun 17, 2021 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the foyer located at apt 1, 1st story, 2nd apartment from east at south
Jun 17, 2021 · Apt 1
Open — Nov certified late - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st door frame from west at north wall, 1st door from west at north wall in the foyer located at apt 1, 1st story, 2nd apartment from east at south
Jun 17, 2021 · Apt 1
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 1, 1st story, 2nd apartment from east at south
Jun 17, 2021 · Apt 1
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 1, 1st story, 2nd apartment from east at south
Jun 17, 2021 · Apt 1
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the kitchen located at apt 1, 1st story, 2nd apartment from east at south
Jun 17, 2021 · Apt 1
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling at bulkhead to roof at public hall stairs, 6th story
Jun 5, 2021
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and all walls at bulkhead to roof at public hall stairs, 6th story
Jun 5, 2021
Open — Invalid certification - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder at building front at fire escape
Jun 5, 2021
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall in the 1st room from north at west located at apt 25, 6th story, 1st apartment from west at north
Jun 5, 2021 · Apt 25
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from north at east located at apt 25, 6th story, 1st apartment from west at north
Jun 5, 2021 · Apt 25
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from north at east located at apt 25, 6th story, 1st apartment from west at north
Jun 5, 2021 · Apt 25
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at east located at apt 25, 6th story, 1st apartment from west at north
Jun 5, 2021 · Apt 25
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... at north wall (10 sq. ft.) in the 1st room from north at east located at apt 25, 6th story, 1st apartment from west at north
Jun 5, 2021 · Apt 25
Open — First no access to re- inspect violation - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from north at west located at apt 25, 6th story, 1st apartment from west at north
Jun 5, 2021 · Apt 25
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective mortise lock on door at building entrance , 1st story
Jun 4, 2021
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 5 sty balcony, front stack at fire escape
Jan 2, 2021
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of air conditioner obstructing egress to fire escape window in the 3rd room from north at east located at apt 2, 2nd story, 2nd apartment from east at south
Jan 2, 2021 · Apt 2
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2, 2nd story, 2nd apartment from east at south
Jan 2, 2021 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape window in the 3rd room from north at west located at apt 17, 5th story, 1st apartment from east at south
Jan 2, 2021 · Apt 17
Closed — Violation dismissed - CImmediately hazardous
Arrange and make self-closing the doors . in the entrance located at apt 17, 5th story, 1st apartment from east at south
Jan 2, 2021 · Apt 17
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the kitchen located at apt 17, 5th story, 1st apartment from east at south
Jan 2, 2021 · Apt 17
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the bathroom located at apt 17, 5th story, 1st apartment from east at south
Jan 2, 2021 · Apt 17
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 17, 5th story, 1st apartment from east at south
Jan 2, 2021 · Apt 17
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and all walls in the bathroom located at apt 8, 3rd story, 1st apartment from north at east
Dec 6, 2020 · Apt 8
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at east window approx 2 sq ft in the bathroom located at apt 8, 3rd story, 1st apartment from north at east
Dec 6, 2020 · Apt 8
Closed — Violation dismissed - BHazardous
Fire escape defective. properly secure the shoe at drop ladder at building front at fire escape
Nov 19, 2020
Open — Nov sent out - CImmediately hazardous
Replace with new the broken or defective shut off valve at radiator at west wall at public hall, 1st story
Nov 19, 2020
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 22, 6th story, 1st apartment from east at south
Nov 18, 2020 · Apt 22
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 22, 6th story, 1st apartment from east at south
Nov 18, 2020 · Apt 22
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape window in the 3rd room from north at west located at apt 22, 6th story, 1st apartment from east at south
Nov 18, 2020 · Apt 22
Closed — Violation dismissed - CImmediately hazardous
Arrange and make self-closing the doors . in the entrance located at apt 22, 6th story, 1st apartment from east at south
Nov 18, 2020 · Apt 22
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 22, 6th story, 1st apartment from east at south
Nov 18, 2020 · Apt 22
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 22, 6th story, 1st apartment from east at south
Nov 18, 2020 · Apt 22
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective electrical switch at west wall in the bathroom located at apt 22, 6th story, 1st apartment from east at south
Nov 18, 2020 · Apt 22
Closed — Violation dismissed - ANon-hazardous
Provide approved metal screen below bulkhead skylight at roof
Nov 18, 2019
Open — Nov sent out - BHazardous
Provide security in event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at the vestibule door , 1st story
Nov 18, 2019
Open — Nov sent out - BHazardous
Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at the vestibule door , 1st story
Nov 18, 2019
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 25, 6th story, 1st apartment from west at north
Nov 18, 2019 · Apt 25
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 25, 6th story, 1st apartment from west at north
Nov 18, 2019 · Apt 25
Closed — Violation dismissed - CImmediately hazardous
Arrange and make self-closing the doors ... in the entrance located at apt 25, 6th story, 1st apartment from west at north
Nov 18, 2019 · Apt 25
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 6, 3rd story, 2nd apartment from east at south
Nov 15, 2019 · Apt 6
Closed — Violation dismissed
DOB building violations · 20
- Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 3, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 19, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 19, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Construction other optional
C-construction other optional
May 11, 2006
Dob violation - active - Zoning none
Z-zoning none
May 11, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed
Show 10 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 8, 1994
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
Jul 8, 1994
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
Jul 8, 1994
Dob violation - active - Construction other optional
C-construction other optional
Jul 8, 1994
Dob violation - active - Construction other optional
C-construction other optional
Jul 8, 1994
Dob violation - active - Construction other optional
C-construction other optional
Jul 8, 1994
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 12
- Class - 2
Occupancy contrary to that allowed by the department of building records. unable to gain access, certificate of correction has not been obtained for class 1 occupancy contrary, violation #35677000m issued on 05
Oct 6, 2025
Resolve - Class - 1
Occupancy contrary to that allowed by the department of building records.illegal occupancy noted:at 1st floor converted/occupied as lavenderbody work spa with 4 massage rooms,massage tables,oils & tower & towel
May 1, 2024
Resolve - Class - 2
Illegal use in a residential district.unlicensed physical treatment establishment,a prohibited use per zr 12-10,operating in a r & b district on 1st floor level noted:a masseuse offered to perform a full body m
May 1, 2024
Resolve - Class - 1
Work without a permit.work noted at 1st floor erected partition walls creating 4 rooms.rem:obtain permit.
May 1, 2024 · Penalty $2,500
Active - Class - 2
Work without a permit. noted: at exposure #2 at second floor level is an erected wooden structure attached to building over the 1st floor roof behind restaurant. wood enclosing structure is in disrepair and war
Oct 2, 2023 · Penalty $620
Resolve - Class - 2
At time of inspection observed water leak, stain and damaged on wall and ceiling in apt # 25 at 6th floor level. also observed temporary plastic tarp covering on roof over the leaking area of apt # 25., repair
Jun 4, 2021
Resolve - Class - 1
Failure to maintain building in code-complaint manner i observed on third floor in apartment 8 in the kitchen area gas valve is not directly behind stove and gas flex hose going threw cabinet., repair and/repla
Dec 11, 2020 · Penalty $1,250
Resolve - Class - 1
No fire door-no hw gage-no covering over boiler-h'ford loop pipe metal not code-no insul. on piping-boiler room not fire rated-no anti siphon on oil line-no fixed vent-no manuf. plate-no cleanout at chimney-exc
Nov 20, 2019 · Penalty $1,250
Resolve - Class - 1
As per one cast iron, five section, oil fired boiler in cellar of said address./ao smith, gas, hwh. serial# 191911483015. built: 05/09/2019. work w/o a permit., obtain permit; apply for proper permits, correct
Nov 20, 2019 · Penalty $2,500
Resolve - Class - 2
Failure to comply with the commissioners'order contained in summons/violation #35376006y issued on 3/1/19 & to file a cert. of correction pursuant to 28-201.1 &1rcny 102-01.no c of o on file.rem:comply with com
Apr 28, 2019 · Penalty $625
Resolve
Show 2 more ↓
- Class - 1
Failure to maintain unobstructed passageway.at time of inspection note couch,sink,ladder and debris blocking egress at 6th floor level in main stairwell .failure to maintain unobstructed passageway creates a ha
Mar 1, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to maintain building wall(s) or appurtenances.noted:at exp1, front facade of bldg (northside) 2 pcs of mortar joints pull from parapet wall located below ornamental stone across parapet and above 2nd
Dec 9, 2015 · Penalty $250
Active
Complaints
- Unsanitary condition
Pests
Mar 10, 2025 · Apt 21
Close - Unsanitary condition
Garbage/recycling storage
Mar 10, 2025 · Apt 21
Close - Plumbing
Water supply
Jan 14, 2024 · Apt 10
Close - Heat/hot water
Entire building
Jan 6, 2024 · Apt 24
Close - Heat/hot water
Apartment only
Jan 5, 2024 · Apt 20
Close - Plumbing
Basin/sink
Feb 21, 2023 · Apt 2
Close - Paint/plaster
Ceiling
Feb 21, 2023 · Apt 2
Close - Paint/plaster
Ceiling
Feb 21, 2023 · Apt 2
Close - Paint/plaster
Ceiling
Feb 21, 2023 · Apt 2
Close - Unsanitary condition
Mold
Feb 21, 2023 · Apt 2
Close
Show 40 more ↓
- Unsanitary condition
Mold
Jan 3, 2023 · Apt 16
Close - Water leak
Damp spot
Jan 3, 2023 · Apt 16
Close - Plumbing
Water supply
Jan 3, 2023 · Apt 16
Close - Door/window
Door
Jan 3, 2023 · Apt 16
Close - Plumbing
Radiator
Dec 29, 2021 · Apt 17
Close - Flooring/stairs
Floor
Dec 29, 2021 · Apt 17
Close - Water leak
Heavy flow
Dec 29, 2021 · Apt 17
Close - Paint/plaster
Wall
Jun 2, 2021 · Apt 25
Close - Paint/plaster
Ceiling
Jun 2, 2021 · Apt 25
Close - Unsanitary condition
Mold
Jun 2, 2021 · Apt 25
Close - Paint/plaster
Ceiling
Jun 2, 2021 · Apt 25
Close - Unsanitary condition
Pests
May 27, 2021 · Apt 1
Close - Flooring/stairs
Floor
May 27, 2021 · Apt 1
Close - Flooring/stairs
Floor
May 27, 2021 · Apt 1
Close - Paint/plaster
Ceiling
Jan 1, 2021 · Apt 2
Close - Water leak
Slow leak
Jan 1, 2021 · Apt 2
Close - Water leak
Heavy flow
Jan 1, 2021 · Apt 2
Close - Plumbing
Toilet
Dec 5, 2020 · Apt 8
Close - Door/window
Window frame
Dec 5, 2020 · Apt 8
Close - Unsanitary condition
Sewage
Dec 5, 2020 · Apt 8
Close - Plumbing
Radiator
Nov 17, 2020 · Apt 2
Close - Water leak
Damp spot
Nov 17, 2020 · Apt 2
Close - Plumbing
Basin/sink
Nov 1, 2020 · Apt 22
Close - Plumbing
Basin/sink
Nov 1, 2020 · Apt 22
Close - Plumbing
Basin/sink
Nov 1, 2020 · Apt 22
Close - Plumbing
Bathtub/shower
Nov 1, 2020 · Apt 22
Close - Electric
Outlet/switch
Oct 26, 2020 · Apt 22
Close - Plumbing
Basin/sink
Oct 26, 2020 · Apt 22
Close - Plumbing
Bathtub/shower
Oct 26, 2020 · Apt 22
Close - Plumbing
Water supply
Sep 22, 2020 · Apt 25
Close - Plumbing
Basin/sink
Aug 1, 2020 · Apt 25
Close - Plumbing
Bathtub/shower
Aug 1, 2020 · Apt 25
Close - Plumbing
Water supply
May 20, 2020 · Apt 25
Close - Unsanitary condition
Pests
May 20, 2020 · Apt 25
Close - Plumbing
Boiler
Jan 27, 2020 · Apt 1A
Close - Heat/hot water
Entire building
Jan 27, 2020 · Apt 1A
Close - Safety
Fire escape
Jan 20, 2020 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 20, 2019 · Apt BUILDI
Close - Heat/hot water
Entire building
Nov 17, 2019 · Apt 8
Close - Heat/hot water
Entire building
Nov 17, 2019 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1920
- Floors
- 6
- Residential units
- 25
- Building area
- 16,257 ft²
- Lot area
- 3,956 ft²
- Zoning
- R8B
- Community board
- 106
- Council district
- 2
- Block / lot
- 909 / 38
- Assessed value
- $1,012,500
- Landmark / historic district
- No
HPD registration #137082, last renewed Jun 8, 2026.
Questions about 230 East 29 Street
Who owns 230 East 29 Street?
The owner of record in NYC Department of City Planning PLUTO data is Rss Group, LLC.
Does 230 East 29 Street have violations?
Yes. NYC HPD has recorded 186 housing violations at this property.
Is 230 East 29 Street rent stabilized?
NYC Department of Finance tax bills listed 12 rent-stabilized units here in 2024 (about 48% of its 25 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 230 East 29 Street built?
City records list 1920 as the year it was built.
How many apartments are in 230 East 29 Street?
It has 25 residential units and 27 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.