229 East 28 Street
Manhattan, NY 10016BBL 1-00909-0015Map
Owner of record: 229 East 28 St Owners Corp
229 East 28 Street is an elevator apartment building built in 1962 in Manhattan, 10016. It has 84 residential units across 7 floors. The owner of record is 229 East 28 St Owners Corp. HPD has recorded 238 housing violations here, most recently on September 23, 2026. 38 of the 50 most recent violations are still open.
- HPD violations
- 238
- DOB violations
- 12
- ECB violations
- 11
- HPD complaints
- 353
Available now in this building
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 238
- BHazardous
Properly repair or replace the broken or defective entrance door latch set in the bathroom located at apt 1f, 1st story, 3rd apartment from east at south
Sep 23, 2026 · Apt 1F
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective bell buzzer intercom system from the building entrance door to the apartment east wall panel in the foyer located at apt 1f, 1st story, 3rd apartment from east at south
Sep 23, 2026 · Apt 1F
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1f, 1st story, 3rd apartment from east at south
Sep 23, 2026 · Apt 1F
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1f, 1st story, 3rd apartment from east at south
Sep 23, 2026 · Apt 1F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the bathroom located at apt 1f, 1st story, 3rd apartment from east at south
Sep 23, 2026 · Apt 1F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east south and west walls and ceiling in the bathroom located at apt lj, 1st story, 2nd apartment from east at south
Sep 9, 2024 · Apt LJ
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south and west walls and ceiling in the kitchen located at apt lj, 1st story, 2nd apartment from east at south
Sep 9, 2024 · Apt LJ
Open — Nov sent out - BHazardous
Repair or replace the smoke detector inoperable in the entire apartment located at apt lj, 1st story, 2nd apartment from east at south
Sep 9, 2024 · Apt LJ
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). inoperable in the entire apartment located at apt lj, 1st story, 2nd apartment from east at south
Sep 9, 2024 · Apt LJ
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bath tub in the bathroom located at apt lj, 1st story, 2nd apartment from east at south
Sep 9, 2024 · Apt LJ
Open — Nov sent out
Show 40 more ↓
- BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10sq at north wall in the bathroom located at apt lj, 1st story, 2nd apartment from east at south
Sep 9, 2024 · Apt LJ
Open — First no access to re- inspect violation - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt lj, 1st story, 2nd apartment from east at south
Sep 9, 2024 · Apt LJ
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt lj, 1st story, 5th apartment from east at south
May 3, 2023 · Apt LJ
Open — Notice of issuance sent to tenant - BHazardous
Trace and repair the source and abate the visible mold condition... at ceiling ( 8 sq ft ) and east wall ( 4 sq ft ) in the bathroom located at apt lj, 1st story, 5th apartment from east at south
May 3, 2023 · Apt LJ
Open — First no access to re- inspect violation - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt lj, 1st story, 5th apartment from east at south
May 3, 2023 · Apt LJ
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at bsmt-apt lj, 5th bsmt-apt from east at south
Mar 16, 2023 · Apt LJ
Open — Notice of issuance sent to tenant - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at bsmt-apt lj, 5th bsmt-apt from east at south
Mar 16, 2023 · Apt LJ
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at bsmt-apt lj, 5th bsmt-apt from east at south
Mar 16, 2023 · Apt LJ
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at bsmt-apt lj, 5th bsmt-apt from east at south
Mar 16, 2023 · Apt LJ
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at bsmt-apt lj, 5th bsmt-apt from east at south
Mar 16, 2023 · Apt LJ
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at bsmt-apt lj, 5th bsmt-apt from east at south
Mar 16, 2023 · Apt LJ
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and all walls in the bathroom located at apt lj, 1st story, 5th apartment from east at south
Feb 2, 2023 · Apt LJ
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at west wall in the bathroom located at apt lj, 1st story, 5th apartment from east at south
Feb 2, 2023 · Apt LJ
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective bell,return buzzer/intercome system from buildind front entrance to the panel in the foyer located at apt lj, 1st story, 5th apartment from east at south
Feb 2, 2023 · Apt LJ
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt lj, 1st story, 5th apartment from east at south
Feb 2, 2023 · Apt LJ
Open — Nov certified late - ANon-hazardous
Properly repair the broken or defective intercom bell buzzer from building entrance door to apt entrance in the entrance located at apt lj, 1st story, 5th apartment from east at south
Dec 2, 2021 · Apt LJ
Open — Nov sent out - ANon-hazardous
Repair the leaky and/or defective faucets at shower head at bathtub in the bathroom located at apt lj, 1st story, 5th apartment from east at south
Dec 2, 2021 · Apt LJ
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the kitchen located at apt lj, 1st story, 5th apartment from east at south
Dec 2, 2021 · Apt LJ
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the bathroom located at apt lj, 1st story, 5th apartment from east at south
Dec 2, 2021 · Apt LJ
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls in the kitchen located at apt lj, 1st story, 5th apartment from east at south
Aug 9, 2020 · Apt LJ
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls in the 1st room from north located at apt lj, 1st story, 5th apartment from east at south
Aug 9, 2020 · Apt LJ
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall in the bathroom located at apt lj, 1st story, 5th apartment from east at south
Aug 9, 2020 · Apt LJ
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and all walls in vestibule area at public hall, 1st story
Aug 9, 2020
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and all walls in the vestibule area at public hall, 1st story
Aug 9, 2020
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt lj, 1st story, 5th apartment from east at south
Aug 9, 2020 · Apt LJ
Open — Nov sent out - BHazardous
Provide dwelling with a janitor or responsible person or janitorial service. at public hall
Sep 3, 2019
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Sep 3, 2019
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... on the tiles at north wall at bathtub in the bathroom located at apt lj, 1st story, 5th apartment from east at south original violation 13115841 issued 10-jun-19 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jun 10, 2019 · Apt LJ
Open — First no access to re- inspect violation - ANon-hazardous
Replace the broken or defective porcelin interior finish of the bathtub in the bathroom located at apt lj, 1st story, 5th apartment from east at south
Jun 10, 2019 · Apt LJ
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the bathroom located at apt lj, 1st story, 5th apartment from east at south
Jun 10, 2019 · Apt LJ
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... on the tiles at north wall at bathtub in the bathroom located at apt lj, 1st story, 5th apartment from east at south
Jun 10, 2019 · Apt LJ
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Jun 5, 2019
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system , missing at boiler room door and improperly filled out at lobby
Jul 16, 2018
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective cement floor throughout at lobby
Jul 16, 2018
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and all walls at lobby
Jul 16, 2018
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and all walls at lobby
Jul 16, 2018
Open — Not complied with - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor , frame missing at lobby
Jul 16, 2018
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at lobby
Jul 16, 2018
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at lobby
Jul 16, 2018
Open — Not complied with - ANon-hazardous
Remove device preventing door from being self-closing at east exit door to fire passageway at cellar
Jul 16, 2018
Closed — Violation closed
DOB building violations · 12
- Elevator elevatorrequired
E-elevator elevatorrequired
Feb 26, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 17, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 15, 2012
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 1, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 7, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 6, 2008
Dob violation - resolved - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 23, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 5, 2004
Dob violation - resolved
Show 2 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Jul 8, 2003
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 1, 1994
Dob violation - dismissed
ECB violations · 11
- Class - 1
Failure to provide unobstructed exit passageway.note:at time of inspection observed at south elevation expo#1,fire escape obstructed by objects on the 6th and 7th fl.rem:remove egress obstruction
Nov 20, 2020 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35375155n issued on 02-04-19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. no compliance recorded. remedy: comply w/comm's order &/or file
Apr 5, 2019 · Penalty $625
Resolve - Class - 2
Bc 105-8.2 expired permit.note:@time of my inspection of a7 sty building with material storage in the sheet.review of the dot permit revealed that it expired on 02/15/19 & had not been renewed.rem:renew permit
Mar 11, 2019 · Penalty $620
Resolve - Class - 2
Failure to provide unobstructed exit passageway. noted: at the front, temporary construction fence and piles of masonry debris and materialsobstructs the two fire escapes drop ladders on the right
Feb 4, 2019 · Penalty $625
Resolve - Class - 2
Failure to obtain a temporary construction permit prior to installation/use of construction equpitment.note:observed construction fence is in place with no permit on file.rem:obtain construction fence permit do
Dec 10, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to maintain bldg in code compliant manner. noted: floor was removed creating uneven surface w/tripping hazards,hazardous to public. also,5 stopping removed on wall approx 10'x4'. all work performed in
Jun 28, 2018 · Penalty $625
Resolve - Class - 2
Work ew/o a permit. noted: in the lobby & public corridor on 1st fl,floor removed,fire stopping removed on a wall approx 10'x4' temporary wall erected w/2x4 & plastic blocking half of exit corridor.
Jun 28, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to submit an acceptable 6th round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the d.o.b. rules & regulation
Dec 7, 2008 · Penalty $800
Resolve - Hazardous
Plumbing work w/o a permit installed new piping for gas line to relocated stove in apt 1d approximately 6 feet of 3/4 black pipe. remedy : obtain a permit if feasible or restore to prior legal condition
Nov 30, 2005 · Penalty $800
Resolve - Non-hazardous
Work without a permit. work noted: complete renovation of bathroom flto repair plumbing drain-existing plumbing drain has been removed & replaced. bathrm plaster walls are being removed to facilitate repairs
Feb 2, 1998
Resolve
Show 1 more ↓
- Non-hazardous
25l,15l,5l.
Jan 21, 1993
Resolve
Complaints
- Paint/plaster
Ceiling
Sep 21, 2026 · Apt 1F
Close - Water leak
Slow leak
Sep 21, 2026 · Apt 1F
Close - Paint/plaster
Ceiling
Jun 22, 2026 · Apt 1F
Close - General
Bell/buzzer/intercom
Jun 22, 2026 · Apt 1F
Close - Paint/plaster
Ceiling
Apr 2, 2026 · Apt 1F
Close - General
Bell/buzzer/intercom
Apr 2, 2026 · Apt 1F
Close - Electric
Outlet/switch
Apr 2, 2026 · Apt 1F
Close - Heat/hot water
Apartment only
Jan 16, 2026 · Apt LJ
Close - Plumbing
Basin/sink
Sep 4, 2025 · Apt LJ
Close - Door/window
Window pane
Jul 17, 2025 · Apt 1A
Close
Show 40 more ↓
- Heat/hot water
Entire building
Dec 22, 2024 · Apt BLDG
Close - Unsanitary condition
Pests
Aug 30, 2024 · Apt LJ
Close - Unsanitary condition
Pests
Apr 18, 2023 · Apt LJ
Close - Unsanitary condition
Pests
Apr 18, 2023 · Apt LJ
Close - Unsanitary condition
Pests
Mar 6, 2023 · Apt LJ
Close - Unsanitary condition
Pests
Mar 6, 2023 · Apt LJ
Close - Plumbing
Bathtub/shower
Mar 6, 2023 · Apt LJ
Close - Plumbing
Toilet
Mar 6, 2023 · Apt LJ
Close - Unsanitary condition
Pests
Mar 6, 2023 · Apt LJ
Close - Water leak
Slow leak
Jan 19, 2023 · Apt LJ
Close - General
Bell/buzzer/intercom
Jan 19, 2023 · Apt LJ
Close - Unsanitary condition
Pests
Jan 19, 2023 · Apt LJ
Close - General
Bell/buzzer/intercom
Dec 16, 2022 · Apt 3C
Close - Flooring/stairs
Floor
Dec 13, 2022 · Apt LJ
Close - Paint/plaster
Wall
Dec 13, 2022 · Apt LJ
Close - Electric
Outlet/switch
Dec 13, 2022 · Apt LJ
Close - Plumbing
Bathtub/shower
Dec 13, 2022 · Apt LJ
Close - Door/window
Door
Dec 13, 2022 · Apt LJ
Close - Unsanitary condition
Pests
Dec 13, 2022 · Apt LJ
Close - General
Bell/buzzer/intercom
Nov 26, 2021 · Apt LJ
Close - Plumbing
Bathtub/shower
Nov 23, 2021 · Apt LJ
Close - Flooring/stairs
Floor
Nov 23, 2021 · Apt LJ
Close - Water leak
Slow leak
Nov 23, 2021 · Apt LJ
Close - Paint/plaster
Wall
Nov 23, 2021 · Apt LJ
Close - Flooring/stairs
Floor
Feb 19, 2021 · Apt LJ
Close - Plumbing
Bathtub/shower
Jul 22, 2020 · Apt LJ
Close - Plumbing
Bathtub/shower
Mar 8, 2020 · Apt 6K
Close - General
Signage missing
Aug 27, 2019 · Apt BLDG
Close - Unsanitary condition
Mold
Jun 3, 2019 · Apt LJ
Close - Plumbing
Bathtub/shower
May 20, 2019 · Apt LJ
Close - Plumbing
Toilet
May 20, 2019 · Apt LJ
Close - Water leak
Slow leak
Nov 26, 2018 · Apt 6M
Close - Electric
No lighting
Jul 12, 2018 · Apt LA
Close - Flooring/stairs
Stairs
Jul 7, 2018 · Apt LA
Close - Flooring/stairs
Floor
Jul 7, 2018 · Apt LA
Close - Heat/hot water
Entire building
Nov 1, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 1, 2017 · Apt 4K
Close - Unsanitary condition
Pests
Dec 28, 2016 · Apt LJ
Close - Heat/hot water
Entire building
Nov 11, 2016 · Apt 5H
Close - Safety
Fire escape
Jul 8, 2016 · Apt BLDG
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Aug 5, 2026 | $380,000 | Coops - elevator apartments | — |
| Jul 16, 2026 | $350,000 | Coops - elevator apartments | — |
| Jun 17, 2026 | $365,000 | Coops - elevator apartments | — |
| Apr 15, 2026 | $364,000 | Coops - elevator apartments | — |
Building details
- Building type
- Elevator apartment building (D4)
- Year built
- 1962
- Floors
- 7
- Residential units
- 84
- Building area
- 44,912 ft²
- Lot area
- 9,875 ft²
- Zoning
- R8B
- Community board
- 106
- Council district
- 2
- Block / lot
- 909 / 15
- Assessed value
- $6,571,350
- Landmark / historic district
- No
HPD registration #138444, last renewed Aug 30, 2025.
Questions about 229 East 28 Street
Who owns 229 East 28 Street?
The owner of record in NYC Department of City Planning PLUTO data is 229 East 28 St Owners Corp.
Does 229 East 28 Street have violations?
Yes. NYC HPD has recorded 238 housing violations at this property.
Is 229 East 28 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 229 East 28 Street built?
City records list 1962 as the year it was built.
How many apartments are in 229 East 28 Street?
It has 84 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.

