roofy

229 East 28 Street

Manhattan, NY 10016BBL 1-00909-0015Map

Owner of record: 229 East 28 St Owners Corp

229 East 28 Street is an elevator apartment building built in 1962 in Manhattan, 10016. It has 84 residential units across 7 floors. The owner of record is 229 East 28 St Owners Corp. HPD has recorded 238 housing violations here, most recently on September 23, 2026. 38 of the 50 most recent violations are still open.

HPD violations
238
DOB violations
12
ECB violations
11
HPD complaints
353

Available now in this building

What to know

Concern
6 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 23, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 238

  • B

    Properly repair or replace the broken or defective entrance door latch set in the bathroom located at apt 1f, 1st story, 3rd apartment from east at south

    Sep 23, 2026 · Apt 1F

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective bell buzzer intercom system from the building entrance door to the apartment east wall panel in the foyer located at apt 1f, 1st story, 3rd apartment from east at south

    Sep 23, 2026 · Apt 1F

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1f, 1st story, 3rd apartment from east at south

    Sep 23, 2026 · Apt 1F

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1f, 1st story, 3rd apartment from east at south

    Sep 23, 2026 · Apt 1F

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the bathroom located at apt 1f, 1st story, 3rd apartment from east at south

    Sep 23, 2026 · Apt 1F

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the east south and west walls and ceiling in the bathroom located at apt lj, 1st story, 2nd apartment from east at south

    Sep 9, 2024 · Apt LJ

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the south and west walls and ceiling in the kitchen located at apt lj, 1st story, 2nd apartment from east at south

    Sep 9, 2024 · Apt LJ

    Open — Nov sent out
  • B

    Repair or replace the smoke detector inoperable in the entire apartment located at apt lj, 1st story, 2nd apartment from east at south

    Sep 9, 2024 · Apt LJ

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). inoperable in the entire apartment located at apt lj, 1st story, 2nd apartment from east at south

    Sep 9, 2024 · Apt LJ

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at bath tub in the bathroom located at apt lj, 1st story, 2nd apartment from east at south

    Sep 9, 2024 · Apt LJ

    Open — Nov sent out
Show 40 more ↓
  • B

    Trace and repair the source and abate the visible mold condition... greater than 10sq at north wall in the bathroom located at apt lj, 1st story, 2nd apartment from east at south

    Sep 9, 2024 · Apt LJ

    Open — First no access to re- inspect violation
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt lj, 1st story, 2nd apartment from east at south

    Sep 9, 2024 · Apt LJ

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt lj, 1st story, 5th apartment from east at south

    May 3, 2023 · Apt LJ

    Open — Notice of issuance sent to tenant
  • B

    Trace and repair the source and abate the visible mold condition... at ceiling ( 8 sq ft ) and east wall ( 4 sq ft ) in the bathroom located at apt lj, 1st story, 5th apartment from east at south

    May 3, 2023 · Apt LJ

    Open — First no access to re- inspect violation
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt lj, 1st story, 5th apartment from east at south

    May 3, 2023 · Apt LJ

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of mice in the entire apartment located at bsmt-apt lj, 5th bsmt-apt from east at south

    Mar 16, 2023 · Apt LJ

    Open — Notice of issuance sent to tenant
  • B

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at bsmt-apt lj, 5th bsmt-apt from east at south

    Mar 16, 2023 · Apt LJ

    Open — Nov sent out
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at bsmt-apt lj, 5th bsmt-apt from east at south

    Mar 16, 2023 · Apt LJ

    Open — Nov sent out
  • B

    Repair or replace the smoke detector defective in the entire apartment located at bsmt-apt lj, 5th bsmt-apt from east at south

    Mar 16, 2023 · Apt LJ

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at bsmt-apt lj, 5th bsmt-apt from east at south

    Mar 16, 2023 · Apt LJ

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at bsmt-apt lj, 5th bsmt-apt from east at south

    Mar 16, 2023 · Apt LJ

    Open — Notice of issuance sent to tenant
  • A

    Paint with light colored paint to the satisfaction of this department ceiling and all walls in the bathroom located at apt lj, 1st story, 5th apartment from east at south

    Feb 2, 2023 · Apt LJ

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at west wall in the bathroom located at apt lj, 1st story, 5th apartment from east at south

    Feb 2, 2023 · Apt LJ

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective bell,return buzzer/intercome system from buildind front entrance to the panel in the foyer located at apt lj, 1st story, 5th apartment from east at south

    Feb 2, 2023 · Apt LJ

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt lj, 1st story, 5th apartment from east at south

    Feb 2, 2023 · Apt LJ

    Open — Nov certified late
  • A

    Properly repair the broken or defective intercom bell buzzer from building entrance door to apt entrance in the entrance located at apt lj, 1st story, 5th apartment from east at south

    Dec 2, 2021 · Apt LJ

    Open — Nov sent out
  • A

    Repair the leaky and/or defective faucets at shower head at bathtub in the bathroom located at apt lj, 1st story, 5th apartment from east at south

    Dec 2, 2021 · Apt LJ

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceiling in the kitchen located at apt lj, 1st story, 5th apartment from east at south

    Dec 2, 2021 · Apt LJ

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceiling in the bathroom located at apt lj, 1st story, 5th apartment from east at south

    Dec 2, 2021 · Apt LJ

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all walls in the kitchen located at apt lj, 1st story, 5th apartment from east at south

    Aug 9, 2020 · Apt LJ

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all walls in the 1st room from north located at apt lj, 1st story, 5th apartment from east at south

    Aug 9, 2020 · Apt LJ

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at east wall in the bathroom located at apt lj, 1st story, 5th apartment from east at south

    Aug 9, 2020 · Apt LJ

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling and all walls in vestibule area at public hall, 1st story

    Aug 9, 2020

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling and all walls in the vestibule area at public hall, 1st story

    Aug 9, 2020

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt lj, 1st story, 5th apartment from east at south

    Aug 9, 2020 · Apt LJ

    Open — Nov sent out
  • B

    Provide dwelling with a janitor or responsible person or janitorial service. at public hall

    Sep 3, 2019

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall

    Sep 3, 2019

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... on the tiles at north wall at bathtub in the bathroom located at apt lj, 1st story, 5th apartment from east at south original violation 13115841 issued 10-jun-19 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Jun 10, 2019 · Apt LJ

    Open — First no access to re- inspect violation
  • A

    Replace the broken or defective porcelin interior finish of the bathtub in the bathroom located at apt lj, 1st story, 5th apartment from east at south

    Jun 10, 2019 · Apt LJ

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the bathroom located at apt lj, 1st story, 5th apartment from east at south

    Jun 10, 2019 · Apt LJ

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... on the tiles at north wall at bathtub in the bathroom located at apt lj, 1st story, 5th apartment from east at south

    Jun 10, 2019 · Apt LJ

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story

    Jun 5, 2019

    Closed — Violation dismissed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system , missing at boiler room door and improperly filled out at lobby

    Jul 16, 2018

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective cement floor throughout at lobby

    Jul 16, 2018

    Open — Not complied with
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling and all walls at lobby

    Jul 16, 2018

    Open — Not complied with
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling and all walls at lobby

    Jul 16, 2018

    Open — Not complied with
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor , frame missing at lobby

    Jul 16, 2018

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at lobby

    Jul 16, 2018

    Closed — Violation closed
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at lobby

    Jul 16, 2018

    Open — Not complied with
  • A

    Remove device preventing door from being self-closing at east exit door to fire passageway at cellar

    Jul 16, 2018

    Closed — Violation closed

DOB building violations · 12

  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 26, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 17, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 15, 2012

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 1, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 7, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 6, 2008

    Dob violation - resolved
  • Facade facade optional

    Ll1198-local law 11/98 - facade facade optional

    Nov 30, 2007

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 23, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 5, 2004

    Dob violation - resolved
Show 2 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 8, 2003

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 1, 1994

    Dob violation - dismissed

ECB violations · 11

  • Class - 1

    Failure to provide unobstructed exit passageway.note:at time of inspection observed at south elevation expo#1,fire escape obstructed by objects on the 6th and 7th fl.rem:remove egress obstruction

    Nov 20, 2020 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#35375155n issued on 02-04-19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. no compliance recorded. remedy: comply w/comm's order &/or file

    Apr 5, 2019 · Penalty $625

    Resolve
  • Class - 2

    Bc 105-8.2 expired permit.note:@time of my inspection of a7 sty building with material storage in the sheet.review of the dot permit revealed that it expired on 02/15/19 & had not been renewed.rem:renew permit

    Mar 11, 2019 · Penalty $620

    Resolve
  • Class - 2

    Failure to provide unobstructed exit passageway. noted: at the front, temporary construction fence and piles of masonry debris and materialsobstructs the two fire escapes drop ladders on the right

    Feb 4, 2019 · Penalty $625

    Resolve
  • Class - 2

    Failure to obtain a temporary construction permit prior to installation/use of construction equpitment.note:observed construction fence is in place with no permit on file.rem:obtain construction fence permit do

    Dec 10, 2018 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner. noted: floor was removed creating uneven surface w/tripping hazards,hazardous to public. also,5 stopping removed on wall approx 10'x4'. all work performed in

    Jun 28, 2018 · Penalty $625

    Resolve
  • Class - 2

    Work ew/o a permit. noted: in the lobby & public corridor on 1st fl,floor removed,fire stopping removed on a wall approx 10'x4' temporary wall erected w/2x4 & plastic blocking half of exit corridor.

    Jun 28, 2018 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit an acceptable 6th round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the d.o.b. rules & regulation

    Dec 7, 2008 · Penalty $800

    Resolve
  • Hazardous

    Plumbing work w/o a permit installed new piping for gas line to relocated stove in apt 1d approximately 6 feet of 3/4 black pipe. remedy : obtain a permit if feasible or restore to prior legal condition

    Nov 30, 2005 · Penalty $800

    Resolve
  • Non-hazardous

    Work without a permit. work noted: complete renovation of bathroom flto repair plumbing drain-existing plumbing drain has been removed & replaced. bathrm plaster walls are being removed to facilitate repairs

    Feb 2, 1998

    Resolve
Show 1 more ↓
  • Non-hazardous

    25l,15l,5l.

    Jan 21, 1993

    Resolve

Complaints

  • Paint/plaster

    Ceiling

    Sep 21, 2026 · Apt 1F

    Close
  • Water leak

    Slow leak

    Sep 21, 2026 · Apt 1F

    Close
  • Paint/plaster

    Ceiling

    Jun 22, 2026 · Apt 1F

    Close
  • General

    Bell/buzzer/intercom

    Jun 22, 2026 · Apt 1F

    Close
  • Paint/plaster

    Ceiling

    Apr 2, 2026 · Apt 1F

    Close
  • General

    Bell/buzzer/intercom

    Apr 2, 2026 · Apt 1F

    Close
  • Electric

    Outlet/switch

    Apr 2, 2026 · Apt 1F

    Close
  • Heat/hot water

    Apartment only

    Jan 16, 2026 · Apt LJ

    Close
  • Plumbing

    Basin/sink

    Sep 4, 2025 · Apt LJ

    Close
  • Door/window

    Window pane

    Jul 17, 2025 · Apt 1A

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Dec 22, 2024 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Aug 30, 2024 · Apt LJ

    Close
  • Unsanitary condition

    Pests

    Apr 18, 2023 · Apt LJ

    Close
  • Unsanitary condition

    Pests

    Apr 18, 2023 · Apt LJ

    Close
  • Unsanitary condition

    Pests

    Mar 6, 2023 · Apt LJ

    Close
  • Unsanitary condition

    Pests

    Mar 6, 2023 · Apt LJ

    Close
  • Plumbing

    Bathtub/shower

    Mar 6, 2023 · Apt LJ

    Close
  • Plumbing

    Toilet

    Mar 6, 2023 · Apt LJ

    Close
  • Unsanitary condition

    Pests

    Mar 6, 2023 · Apt LJ

    Close
  • Water leak

    Slow leak

    Jan 19, 2023 · Apt LJ

    Close
  • General

    Bell/buzzer/intercom

    Jan 19, 2023 · Apt LJ

    Close
  • Unsanitary condition

    Pests

    Jan 19, 2023 · Apt LJ

    Close
  • General

    Bell/buzzer/intercom

    Dec 16, 2022 · Apt 3C

    Close
  • Flooring/stairs

    Floor

    Dec 13, 2022 · Apt LJ

    Close
  • Paint/plaster

    Wall

    Dec 13, 2022 · Apt LJ

    Close
  • Electric

    Outlet/switch

    Dec 13, 2022 · Apt LJ

    Close
  • Plumbing

    Bathtub/shower

    Dec 13, 2022 · Apt LJ

    Close
  • Door/window

    Door

    Dec 13, 2022 · Apt LJ

    Close
  • Unsanitary condition

    Pests

    Dec 13, 2022 · Apt LJ

    Close
  • General

    Bell/buzzer/intercom

    Nov 26, 2021 · Apt LJ

    Close
  • Plumbing

    Bathtub/shower

    Nov 23, 2021 · Apt LJ

    Close
  • Flooring/stairs

    Floor

    Nov 23, 2021 · Apt LJ

    Close
  • Water leak

    Slow leak

    Nov 23, 2021 · Apt LJ

    Close
  • Paint/plaster

    Wall

    Nov 23, 2021 · Apt LJ

    Close
  • Flooring/stairs

    Floor

    Feb 19, 2021 · Apt LJ

    Close
  • Plumbing

    Bathtub/shower

    Jul 22, 2020 · Apt LJ

    Close
  • Plumbing

    Bathtub/shower

    Mar 8, 2020 · Apt 6K

    Close
  • General

    Signage missing

    Aug 27, 2019 · Apt BLDG

    Close
  • Unsanitary condition

    Mold

    Jun 3, 2019 · Apt LJ

    Close
  • Plumbing

    Bathtub/shower

    May 20, 2019 · Apt LJ

    Close
  • Plumbing

    Toilet

    May 20, 2019 · Apt LJ

    Close
  • Water leak

    Slow leak

    Nov 26, 2018 · Apt 6M

    Close
  • Electric

    No lighting

    Jul 12, 2018 · Apt LA

    Close
  • Flooring/stairs

    Stairs

    Jul 7, 2018 · Apt LA

    Close
  • Flooring/stairs

    Floor

    Jul 7, 2018 · Apt LA

    Close
  • Heat/hot water

    Entire building

    Nov 1, 2017 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 1, 2017 · Apt 4K

    Close
  • Unsanitary condition

    Pests

    Dec 28, 2016 · Apt LJ

    Close
  • Heat/hot water

    Entire building

    Nov 11, 2016 · Apt 5H

    Close
  • Safety

    Fire escape

    Jul 8, 2016 · Apt BLDG

    Close

Sales history

DatePriceTypeUnits
Aug 5, 2026$380,000Coops - elevator apartments—
Jul 16, 2026$350,000Coops - elevator apartments—
Jun 17, 2026$365,000Coops - elevator apartments—
Apr 15, 2026$364,000Coops - elevator apartments—

Building details

Building type
Elevator apartment building (D4)
Year built
1962
Floors
7
Residential units
84
Building area
44,912 ft²
Lot area
9,875 ft²
Zoning
R8B
Community board
106
Council district
2
Block / lot
909 / 15
Assessed value
$6,571,350
Landmark / historic district
No

HPD registration #138444, last renewed Aug 30, 2025.

Questions about 229 East 28 Street

Who owns 229 East 28 Street?

The owner of record in NYC Department of City Planning PLUTO data is 229 East 28 St Owners Corp.

Does 229 East 28 Street have violations?

Yes. NYC HPD has recorded 238 housing violations at this property.

Is 229 East 28 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 229 East 28 Street built?

City records list 1962 as the year it was built.

How many apartments are in 229 East 28 Street?

It has 84 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.