7 East 30 Street
Manhattan, NY 10016BBL 1-00860-0008Map
Owner of record: Crp Nomad Owner LLC
7 East 30 Street is an elevator apartment building built in 2020 in Manhattan, 10016. It has 49 residential units across 24 floors. The owner of record is Crp Nomad Owner LLC. HPD has recorded 10 housing violations here, most recently on February 16, 2026. City tax records listed 15 rent-stabilized apartments here in 2024.
- HPD violations
- 10
- DOB violations
- 7
- ECB violations
- 21
- HPD complaints
- 26
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 10
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2a, 2nd story, 1st apartment from north at east
Feb 16, 2026 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2a, 2nd story, 1st apartment from north at east
Feb 16, 2026 · Apt 2A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective hvac system at east wall in the 2nd room from north located at apt 2b, 2nd story, 2nd apartment from north at east
Jan 21, 2026 · Apt 2B
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective hvac system at east wall in the 3rd room from north located at apt 2b, 2nd story, 2nd apartment from north at east
Jan 21, 2026 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 10b, 10th story, 2nd apartment from north at east
Apr 1, 2024 · Apt 10B
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
Apr 1, 2024
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story
Apr 1, 2024
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Apr 1, 2024
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3a, 3rd story, 1st apartment from south at west
Mar 31, 2024 · Apt 3A
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 31, 2023
Closed — Violation dismissed
DOB building violations · 7
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2024
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 9, 2020
Dob violation - dismissed - Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
Feb 19, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed
ECB violations · 21
- Class - 2
Work does not conform to approved construction documents &/or approvedamendments.note:at time of inspection an open active job site i observed suspended scaffold at expo #3.upon review construction documents cd
Nov 4, 2021 · Penalty $625
Resolve - Class - 2
Failure to notify dept prior to installation or removal of suspended scf atoi of active 27stynb i observed chooks&suspended scf w/outriggersin place on rooftop.requested for notification for both chooks&outrigg
Jun 11, 2021 · Penalty $2,500
Resolve - Class - 2
Docs to be kept on file atoi of active 27stynb i observed overhead protection in place@exp1 9sty setback requested for design drawings none was provided/onsite.drawings shall be kept onsite&provided upon reques
Jun 11, 2021
Resolve - Class - 2
Expired permit/expired approved cd15 atoi of active 27stynb i observedsupported pipe scf w/outriggers for suspended scf on roof level.requested for cd5.cd5 provided but expired4/30/21 temp const equipment onsit
Jun 11, 2021 · Penalty $625
Resolve - Class - 1
Bc3314.3.3 drawings/inadequate chooks drawings atoi of active 27stynb i observed chooks in place roof level parapet wall for suspended scf.requested for drawing.drawing provided but not adequate.plans shall@min
Jun 11, 2021 · Penalty $2,500
Resolve - Class - 1
Work doesnt conform to approved plans-cd5 @time of my insp@24stybldg under const i observed suspended scf in place@exp4&facade work in progress.upon rev of cd5 outrigger beam was missing vert post as cd5 approv
Mar 17, 2021 · Penalty $2,500
Resolve - Class - 1
28-110.2 unphased site safety plan @time of my insp@14stybldg under const i observed const operation 1fl-roof.upon rev of site safety plan outrigger beams@roof level@exp4missing from site safety plan.also overh
Mar 17, 2021 · Penalty $2,500
Resolve - Class - 1
Work doesnt conform to approved plan supported scf @time of my insp@24stybldg under const i observed supported scf in [email protected] rev ofsupported scf approved drawings supported scf was fully planked instea
Mar 17, 2021 · Penalty $625
Resolve - Class - 1
Work doesnt conform to approved plan-sws @time of my insp@24stybldg under cosnt i observed sidewalk shed in [email protected] rev of sws approved drawings,sidewalk shed missing vert post&cross braces as approved
Mar 17, 2021 · Penalty $625
Resolve - Class - 2
Provision of law:bc28-116.23.failure to provide an adequate inspectionprogram tr3.as noted:at time of inspection at an active construction site failure to provide or file with dob tr3 tech report for 8000 psi c
Sep 16, 2020 · Penalty $625
Resolve
Show 11 more ↓
- Class - 1
Provision of law:bc1906.6.1.2.failure to secure reshores in proxmity to the leading edge:as noted:at time of inspection at an active construction site observed at many floors at expo#1,3,4.failure to secure res
Sep 16, 2020 · Penalty $2,500
Resolve - Class - 2
Failure to provide safety measures during const operations. noted: @time of inspection form work fir the second floor lvl overhangs above the construction fence into the public way all exp#1. this condition
May 19, 2020 · Penalty $5,000
Resolve - Class - 1
Unsafe storage of combustible material and equipment.noted:at time of my inspection of a new 24storie building,construction in progress.at the ground floor level.i observed 3 seperate gasoline containers left o
May 11, 2020 · Penalty $2,500
Resolve - Class - 1
Unsafe storage of combustible material and equipment.noted:at time of my inspection of a new 24 story but loing at exacavation phase upon entering the excavated area of the site i observed cylinders of oxygen a
Nov 7, 2019
Resolve - Class - 2
Bc330721-fialure to comply with d.o.t regulations as per 34 rcny2-05 and admin code provisions 19-107,19-108 or 19-121.noted:at time of my inspection of a new 24 story building at excavation phase i observed up
Nov 7, 2019
Resolve - Class - 2
Expired fence prmit.as noted:at time of inspection construction site was closed.observed construction fence permit has expd on 10/18/16.permit #122225546-01-eq-fn
Oct 5, 2017
Resolve - Class - 2
Job site super silt fence not pursuant to subsection.as noted:at time of inspection-construction site was closed-observed at exp#1,super silt fence leaning inward and outward endangering the public.super silt
Oct 5, 2017
Resolve - Class - 1
Work w.o permit. upon inspection at above location bldg demo to groundlevel & site graded w.o first obtaining permit & site surrounded with chain link fence there is no permit available as per dob record for wo
Apr 4, 2009 · Penalty $1,600
Resolve - Class - 1
Failure to maintain bldg walls defect noted approx 6'round section of wall on the north east side of bldg has collapsed loose plaster and brick remaining in danger of falling masonry wall approx 50'deep rem: ma
Feb 18, 2009 · Penalty $1,000
Resolve - Non-hazardous
Work w/o a permit. shoring the east side 2nd floor level (approx. 10 columns). remedy: obtain permit.
Dec 14, 2004 · Penalty $250
Resolve - Non-hazardous
Failure to maintain. defect is party wall of 7 e 30 st. and 9 e 30 st. collapsed at middle top area. remedy: repair defect.
Dec 8, 2004
Resolve
Complaints
- Heat/hot water
Entire building
Feb 13, 2026 · Apt 2A
Close - Heat/hot water
Entire building
Feb 3, 2026 · Apt 2A
Close - Heat/hot water
Entire building
Jan 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 18, 2026 · Apt 2B
Close - Heat/hot water
Entire building
Dec 23, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 16, 2024 · Apt 2B
Close - Heat/hot water
Entire building
Apr 1, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 1, 2024 · Apt 2B
Close - Heat/hot water
Entire building
Mar 31, 2024 · Apt 2B
Close - Heat/hot water
Entire building
Mar 31, 2024 · Apt BLDG
Close
Show 16 more ↓
- Heat/hot water
Entire building
Mar 31, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 31, 2024 · Apt 11A
Close - Heat/hot water
Entire building
Mar 31, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 29, 2024 · Apt 2A
Close - Heat/hot water
Entire building
Nov 8, 2023 · Apt 2B
Close - Heat/hot water
Entire building
Oct 6, 2023 · Apt 14A
Close - Heat/hot water
Entire building
Oct 5, 2023 · Apt 2B
Close - Plumbing
Water-leaks
May 12, 2013 · Apt 4
Close - Paint/plaster
Ceiling
May 12, 2013 · Apt 4
Close - General
Mold
May 12, 2013 · Apt 4
Close - General
Mold
May 12, 2013 · Apt 4
Close - Electric
Bell-buzzer/intercom
May 12, 2013 · Apt 4
Close - Paint/plaster
Wall
May 12, 2013 · Apt 4
Close - Paint/plaster
Wall
May 12, 2013 · Apt 4
Close - Paint/plaster
Ceiling
May 12, 2013 · Apt 4
Close - General
Mold
May 12, 2013 · Apt 4
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2020
- Floors
- 24
- Residential units
- 49
- Building area
- 41,820 ft²
- Lot area
- 3,523 ft²
- Zoning
- C5-2
- Community board
- 105
- Council district
- 2
- Block / lot
- 860 / 8
- Assessed value
- $6,198,300
- Landmark / historic district
- No
HPD registration #145062, last renewed Jul 21, 2025.
Questions about 7 East 30 Street
Who owns 7 East 30 Street?
The owner of record in NYC Department of City Planning PLUTO data is Crp Nomad Owner LLC.
Does 7 East 30 Street have violations?
Yes. NYC HPD has recorded 10 housing violations at this property.
Is 7 East 30 Street rent stabilized?
NYC Department of Finance tax bills listed 15 rent-stabilized units here in 2024 (about 31% of its 49 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 7 East 30 Street built?
City records list 2020 as the year it was built.
How many apartments are in 7 East 30 Street?
It has 49 residential units and 50 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.