16 East 30 Street
Manhattan, NY 10016BBL 1-00859-0075Map
Owner of record: 16-18 East 30th Street LLC
16 East 30 Street is a hotel built in 2017 in Manhattan, 10016. The owner of record is 16-18 East 30th Street LLC. HPD has recorded 35 housing violations here, most recently on March 15, 2023.
- HPD violations
- 35
- DOB violations
- 25
- ECB violations
- 54
- HPD complaints
- 1
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 35
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 15, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 2, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 15, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 15, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 1, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 25, 2019
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 5, 2018
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 6, 2017
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 24, 2016
Closed — Violation dismissed
Show 25 more ↓
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 1, 2015
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 2, 2015
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 5w, 5th story, 1st apartment from south at west
Jan 4, 2013 · Apt 5W
Closed — Violation dismissed - CImmediately hazardous
Replace with new the missing glass lites (total 1) at ceiling skylight in the 2nd room from north located at apt 5w, 5th story, 1st apartment from south at west
Jan 4, 2013 · Apt 5W
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 5w, 5th story, 1st apartment from south at west
Jan 4, 2013 · Apt 5W
Closed — Violation dismissed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 5w, 5th story, 1st apartment from south at west
Jan 4, 2013 · Apt 5W
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system , missing sign at public hall, 1st story
Jan 4, 2013
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system ,door to boiler room locked at public hall, 1st story
Jan 4, 2013
Closed — Violation closed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts minimum
Oct 25, 1999
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system 1 sty public hall & on boiler room door.
Oct 31, 1990
Closed — Violation closed - BHazardous
Properly repair the broken or defective door frame 5 sty east apt 5e. , section '' ''
Jan 25, 1990 · Apt 5E
Closed — Violation closed - BHazardous
Properly repair the broken or defective entrance door 5 sty east apt 5e. , section '' ''
Jan 25, 1990 · Apt 5E
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of concealed leak ceiling southwest room 5 sty east apt 5e. , section '' ''
Jan 25, 1990 · Apt 5E
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak ceiling southwest room 5 sty east apt 5e. , section '' ''
Jan 25, 1990 · Apt 5E
Closed — Violation closed - CImmediately hazardous
Properly repair the broken or defective entrance door jamb lock side 3 sty apt 3e er1. , section '' ''
Dec 29, 1989 · Apt 3E
Closed — Violation closed - ANon-hazardous
Provide a lock and key to the entrance door of dwelling unit and, if a cl a multiple dwelling, also heavy duty latch set & dead bolt chain door guard 3 sty apt 3e 3 sty apy 3e. , section '' ''
Dec 29, 1989 · Apt 3E
Closed — Violation closed - ANon-hazardous
Provide a peep hole in entrance door of the dwelling unit so located so as to permit a person inside the dwelling to view any person outside entrance door 3 sty apt 3e. , section '' ''
Dec 29, 1989 · Apt 3E
Closed — Violation closed - BHazardous
Provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing 3 sty apt 3e. , section '' ''
Dec 29, 1989 · Apt 3E
Closed — Violation closed - BHazardous
Replace or repair the self-closing doors that is missing or defective entrance to 3 sty apt 3e. , section '' ''
Dec 29, 1989 · Apt 3E
Closed — Violation closed - ANon-hazardous
Refit entrance door to 3 sty apt 3e. , section '' ''
Dec 29, 1989 · Apt 3E
Closed — Violation closed - BHazardous
Replace or repair the self-closing doors that is missing or defective exit to low roof at rear room 3 sty east apt 3e. located at apt 3e
Jul 20, 1988 · Apt 3E
Closed — Violation closed - BHazardous
Properly repair the broken or defective roof at exit door from 3 sty east apt 3e so as to properly open doors from apt to roof. located at apt 3e
Jul 20, 1988 · Apt 3E
Closed — Violation closed - BHazardous
Replace or repair the self-closing doors that is missing or defective entrance to 3 sty east apt 3e. located at apt 3e
Jul 20, 1988 · Apt 3E
Closed — Violation closed - BHazardous
Replace with new the missing tile 3 sty public hall stair platform.
Jul 20, 1988
Closed — Violation closed - BHazardous
Replace with new the missing tile 2 to 3 sty public hall stair at intermediate platform.
Jul 20, 1988
Closed — Violation closed
DOB building violations · 25
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2019
Jun 29, 2020
Dob violation - dismissed - Construction other optional
Damage to have being sustained due to vehicle impacting sidewaalk shed
Sep 22, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 16, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 7, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 24, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
For failure to file annual 2011 boiler inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed
Show 15 more ↓
- Low pressure boiler boiler required
For failure to file annual 2010 boiler inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
Oct 14, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Zoning none
Z-zoning none
Jul 17, 1991
Dob violation - dismissed - Zoning none
Z-zoning none
Jul 17, 1991
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 17, 1991
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 17, 1991
Dob violation - dismissed
ECB violations · 54
- Class - 1
Wrk does not conform to approved construction docs.at time of inspections of a 20 stry nb currently at finishes stage i observed steel canopy erected at exp#1 bldg front installed on 12"x12" steel column contra
Nov 2, 2020 · Penalty $625
Resolve - Class - 1
Bc 3314.1 unsafe scaffolds.note:at time of my inspection of a 20 storynew building under interior finishing i observed supported pipe scaffold installed at expo#1 of the building used standing platform for inst
Sep 21, 2020 · Penalty $6,250
Resolve - Class - 2
Failure to maintain adequate housekeeping note:at the time of my inspection of a 20 story new building under construction i observed accumulated debris at exp#1 of the building.also observed in the lobby of the
Sep 21, 2020
Resolve - Class - 2
Site safety plan.at the time of inspection i observed active jobsite with construction activities on-going.upon review of approved ssp provide failing pipe scaffold exp#1 no worker,barricades on sidewalk and ex
Jun 29, 2020
Resolve - Class - 2
Temporary construction equipment on site-exp permit. at the time of my inspection of a proposed 20 sty,i observed a sidewalk shed at exp#1. the permit for this temporary equipment exp on 3-14-20. the permit for
Mar 27, 2020
Resolve - Class - 1
Manufacturer specification.noted:at the time of my inspection of an 20story building with work in progress.i observed at exposure one yodockbarrier fence on the street what was installed does not follow manufac
Feb 20, 2020 · Penalty $6,250
Resolve - Class - 1
Site safety coordinator/manager failed to immediately notify the department of expired elevator temporary permit.note:at the time of my inspection of a 20 story new build construction site,working with workers
Feb 20, 2020
Resolve - Class - 2
Work without permit(temporary construciton equip one site-expired permit)as at the time of my inspection of a 20 story new being used to transport workers and material from the ground floor to the 20th floor,up
Feb 20, 2020
Resolve - Class - 1
Permit holder failed to ensure workers attend preshift safety meeting.note:at the time of my inspection of a 20 story new build constructionsite,work in progress,i observed workers working.upon request for pres
Feb 20, 2020 · Penalty $5,000
Resolve - Class - 1
Failure to ensure worker receive site safety orientation.note:at the time of my inspection of a 20 story building with work in progress.uponrequest for site safety orientation for worker for operation only on o
Feb 20, 2020 · Penalty $5,000
Resolve
Show 40 more ↓
- Class - 2
Failure to maintain adequate housekeeping per section requirements. attime of inspection of an active 19 story new building jobsite i observed inadequate housekeeping throughout entire jobsite. cardboard boxes
Jan 7, 2020
Resolve - Class - 2
Bc3301.7 failure to provide p.e. design drawings for means and methodfor repairs: as noted: at time of my inspection on an active jobsite obseved concrete slab cut and exposed rebar and some of vent opening
Mar 27, 2019 · Penalty $620
Resolve - Class - 2
3307.6.5.8 no sidewalk shed 6 months periordic inspection. at tme of inspection of a 19 story building i observed sidwalk shed at exp #1 upon request for 6 months inspection the one provided is dated 6/28/18
Mar 6, 2019
Resolve - Class - 1
Housekeeping.at time of inspection of new 19 story building active jobsite building topped off observed ongoing construction work thru out jobsite.i observed on numerous floors throughout jobsite and or eyebrow
Oct 5, 2018 · Penalty $2,500
Resolve - Class - 1
3308.5-vertical safety netting systems.at time of inspection of new 19 story building active jobsite on going topped off.observed active construction work on going throughout jobsite.observed vertical netting o
Oct 5, 2018 · Penalty $2,500
Resolve - Class - 1
Guardrails(missing, inadequate)at time of inspection of new 19 story building active jobsite building topped off qith active construction wokr on going i observed inadequate guardrails at roof level and of elev
Oct 5, 2018 · Penalty $2,500
Resolve - Class - 1
3301.2-holes not covered.at time of inspection of new 19 story building active jobsite building topped off.observed on going construction work throughout jobsite.observed on numerous floors throughout jobsite h
Oct 5, 2018 · Penalty $625
Resolve - Class - 1
3301.2-handrails.at time of inspection of new 19 story building active jobsitebuilding topped off with active construction work on going.i observed in the permanent stairs inadequate handrails throughout jobsit
Oct 5, 2018
Resolve - Class - 1
3310.10.2-training osha cards.at time of inspection of new 19 story building active jobsite building topped off.observed active construction work on going.upon review of osha training cards to verify compliance
Oct 5, 2018 · Penalty $625
Resolve - Class - 2
Holes uncovered/unsecured. at time of inspection,i observed holes larger than 3" throughout the slabs on several stories where duct & pie risers were located. remedy: secure holes adequately.
Aug 2, 2018 · Penalty $5,000
Resolve - Class - 2
Sec. 3303.2.3.1 temp lighting. at time of inspection,i observed several sections of the stairwells w/dim lighting or lighting completely out. poor & low visibility at stairs creates a potential hazard for perso
Aug 2, 2018
Resolve - Class - 1
Holes not covered.at time of inspection observed active jobsite.holesare found on flr,13,14,16,17 in the slab not cover as required putting persons at risk of a tripping hazardous and putting persons on flrs be
Apr 25, 2018 · Penalty $2,500
Resolve - Class - 1
3308.5.3 cables @time of insp observed active jobsite.the cables provided for the perimeter edge of the bldg on fls (15) & some locns are inadequate & are (loose) hanging some locns.putting persons on site @ris
Apr 25, 2018 · Penalty $2,500
Resolve - Class - 1
3308.5 vertical safety netting.@time of insp observed active jobsite.the vertical safety netting has not been maintained & is found loose & hanging in some locn putting persons below @risk of being struck by fa
Apr 25, 2018 · Penalty $2,500
Resolve - Class - 2
Pedestrian protection does not meet code specs. noted: at time of inspection the gap between the top deck of the sidewalk shed & the construction fence is not enclosed w/netting. remedy: conform shed to code sp
Apr 25, 2018 · Penalty $2,400
Resolve - Class - 2
Work does not conform to approved plans. noted: at time of inspection sidewalk shed at exp#1 missing vertical posts on approx 25feet span. post shores are missing at the 9th fl level for needle beam base at exp
Apr 25, 2018
Resolve - Class - 2
Bc 3301.2 signs @time of inso observed active jobsite no smoking signshas missing fls 1st through 19th creating a hazards condition.rem:provide all signs.
Apr 25, 2018
Resolve - Class - 1
Housekeeping. at time of inspection on a active jobsite of a 19 sty bldg,observed large amounts of debris & bldg materials from 9th fl & up. dirt & rocks were also observed on permanent stairs. inadequate house
Feb 27, 2018
Resolve - Class - 1
Sec. 3303.7.2 fire extinguishers. at time of inspection on a active jobsite of a 19 sty bldg,observed that fire extinguishers were missing at some floors &/or located on the ground fire extinguishers must be
Feb 27, 2018 · Penalty $800
Resolve - Class - 1
Sec. 3304.4 sws debris. at time of inspection of a active jobsite of 19 sty bldg,observed debris of concrete operations on sws at exp#4. sws is to be maintained free of debris & material. remedy: provide & main
Feb 27, 2018
Resolve - Class - 1
Broken sidewalk at the time of my inspection of new 19 story building construction @ 12th floor level i observed that the sidewalk along thejob site entry fence was cracked/had a missing piece pit that creates
Nov 29, 2017 · Penalty $4,000
Resolve - Class - 1
No inspection log-safety straps.at the time of my inspection of new 19 story building under construction building at 12 floor i observed worker tied off to concrete safety strap.upon request for safety strap in
Nov 29, 2017 · Penalty $4,000
Resolve - Class - 1
Housekeeping.at the time of my inspection of new 19 story building under construction i observed construction material & debris on the 9th,8th,7th floor levels material & debris piled 4'high consistine of 2x4,s
Nov 29, 2017 · Penalty $6,000
Resolve - Class - 1
1905.6.3.2 failure to remove strength test cylinders for a period up to 48 hours as noted: at time of inspection on active construction site, bldg at first floor slab.observe strength test cylinders (25) at 1
Feb 27, 2017 · Penalty $400
Resolve - Class - 2
Collection & containment. note: @ time of my insp, responding to complaint# 1442491 where it was reported that during pumping operation a small amount spill out on the street. i also observed that concrete wash
Feb 1, 2017 · Penalty $1,200
Resolve - Class - 2
Failure to institute/maintain safety equipment measures & temporary construction. note: at the time of my inspection of a 19 sty bldg at foundation phase,responding to complaint #1442491 whre it was reported th
Feb 1, 2017 · Penalty $5,000
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operation. at time of inspection observed an active const site w/foundation work in progress. during inspection noted that there was missing
Oct 27, 2016 · Penalty $5,000
Resolve - Class - 1
Bc 3307.7.3 const fence-viewing panels @time of insp const fence erected w/2viewing panels.one w/out plexiglass.one w/tempered glass which allowed no view into const site.rem:replace tempered glass w/clear plex
Jun 14, 2016 · Penalty $1,630
Resolve - Class - 1
Failure to notify dob 24-48hrs of the start of excavation. at the timeof inspection there was no notification on site & excavation operationwas ongoing. remedy: officially notify dob by calling 212-393-2550 &
Apr 19, 2016 · Penalty $1,200
Resolve - Class - 2
Failure to provide approved/accepted plans construction documents at jobsite at time of the inspection. at time of inspection when asked for a copy of the most recent site safety plan for excavation phase of
Apr 9, 2016 · Penalty $250
Resolve - Class - 1
3301.1.2 failure to comply with nyc fire code.no permit for diesel fuel on site observed(2) 5 gallon can container with diesel on site and no permit.presented upon request.stop all use of diesel fuel on site
May 12, 2015 · Penalty $1,600
Resolve - Class - 1
Failure to have site safety present as required. construction activity was on going at the jobsite & the designated site safety manager was not present at the jobsite. stop work order issued pursuant to section
Feb 10, 2015 · Penalty $2,400
Resolve - Class - 2
Failure to provide approved plans at the jobsite at the time of inspection. the respondent failed to provide approved support of excavation (soe)plans at the jobsite. full stop work order issued pursuant to sec
Feb 10, 2015 · Penalty $500
Resolve - Class - 1
Waste dumpsters debris boxes and skip boxes containers containing debris or waste shall be covered at the end of the work day and at anytime when full to near the rim at time of inspection i observed a debri co
Jun 28, 2014 · Penalty $2,400
Resolve - Class - 1
Occupancy contrary to that allowed by the c of o or bldg dept records.noted: existing c of o #91518 dated jan 12, 1988 indicates a retail store at the 1st fl existing conditions at the 1st fl is a laundromat &
Jan 5, 2009
Resolve - Class - 1
Failure to provide unobstructed exit passageway. noted: at roof bulkhead landing and at the 5th flr split landing (rugs,chair; construction debris: roofing materials and glass are obstructing the stairway passa
Nov 26, 2008 · Penalty $500
Resolve - Class - 1
Failure to maintain bldg in code compliant manner: lack of emergency lighting for exits, exit discharges and public corridors per bc 1006.1;27-542. noted: from the 1st flr to the 5th flr in this loft bldg there
Nov 26, 2008 · Penalty $1,000
Resolve - Class - 2
Failure to maintain bldg in code compliant manner. noted: plaster at the stair bulkhead is separating; rear balconies and rear lower roof has misc debris scattered throughout. remedy: repair and or replace.
Nov 26, 2008 · Penalty $500
Resolve - Class - 3
Failure to maintain. defect noted: at rear of the roof the brick chimney is in danger of collapsing. chimney approx 5'x 16" x 4' hig bricks are loose, missing & mortar joints missing. at rear of bldg no
Oct 10, 2008 · Penalty $100
Resolve - Non-hazardous
Failure to maintain. noted: ceiling between 5th & 4th fl are sagging. remedy: repair & /or replace.
Apr 4, 2007 · Penalty $180
Resolve
Complaints
- Heating
Heat related
Jan 2, 2013 · Apt 5W
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Hotel (H3)
- Year built
- 2017
- Floors
- 23
- Residential units
- —
- Building area
- 50,997 ft²
- Lot area
- 3,703 ft²
- Zoning
- C5-2
- Community board
- 105
- Council district
- 2
- Block / lot
- 859 / 75
- Assessed value
- $10,354,050
- Landmark / historic district
- No
HPD registration #145198, last renewed Aug 13, 2025.
Questions about 16 East 30 Street
Who owns 16 East 30 Street?
The owner of record in NYC Department of City Planning PLUTO data is 16-18 East 30th Street LLC.
Does 16 East 30 Street have violations?
Yes. NYC HPD has recorded 35 housing violations at this property.
Is 16 East 30 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 16 East 30 Street built?
City records list 2017 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.