12 Hillcrest Avenue
Staten Island, NY 10308BBL 5-05250-0016Map
Owner of record: Hillcrest Garden LLC
12 Hillcrest Avenue is a walk-up apartment building built in 1969 in Staten Island, 10308. It has 36 residential units across 2 floors. The owner of record is Hillcrest Garden LLC. HPD has recorded 169 housing violations here, most recently on October 2, 2026. 47 of the 50 most recent violations are still open. City tax records listed 36 rent-stabilized apartments here in 2024.
- HPD violations
- 169
- DOB violations
- 16
- ECB violations
- 7
- HPD complaints
- 351
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 169
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance door , 1st story
Oct 2, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
Oct 1, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Oct 1, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Oct 1, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story
Oct 1, 2026
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Oct 1, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east
Sep 19, 2026 · Apt 1B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east
Sep 19, 2026 · Apt 1B
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1b, 1st story, 1st apartment from north at east
Sep 19, 2026 · Apt 1B
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective counter balance upper window sash at south wall in the 3rd room from north located at apt 1b, 1st story, 1st apartment from north at east
Sep 19, 2026 · Apt 1B
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1b, 1st story, 1st apartment from north at east
Sep 19, 2026 · Apt 1B
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective glass pane at left casement window at south in the 1st room from east at south located at apt 1b, 1st story, 1st apartment from north at east
Sep 8, 2026 · Apt 1B
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 1b, 1st story, 1st apartment from north at east
Sep 8, 2026 · Apt 1B
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at north located at apt 1b, 1st story, 1st apartment from north at east
Sep 8, 2026 · Apt 1B
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 11, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 11, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 11, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 11, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 11, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 11, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 11, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 8, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 7, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building front entrance door , 1st story
Apr 16, 2026
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Apr 16, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
Apr 16, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Apr 16, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Apr 16, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story
Apr 16, 2026
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Apr 16, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 2b, 2nd story, 1st apartment from north at east
Mar 15, 2026 · Apt 2B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2b, 2nd story, 1st apartment from north at east
Mar 15, 2026 · Apt 2B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2b, 2nd story, 1st apartment from north at east
Mar 15, 2026 · Apt 2B
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective vinyl tile at floor in the kitchen located at apt 2b, 2nd story, 1st apartment from north at east
Mar 15, 2026 · Apt 2B
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east
Dec 13, 2025 · Apt 1B
Open — Nov sent out - BHazardous
Properly repair the broken or defective paving at building front yard
Dec 13, 2025
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the foyer located at apt 1b, 1st story, 1st apartment from north at east
Dec 13, 2025 · Apt 1B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east
Dec 13, 2025 · Apt 1B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east
Dec 13, 2025 · Apt 1B
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east
Dec 13, 2025 · Apt 1B
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east
Dec 13, 2025 · Apt 1B
Open — Notice of issuance sent to tenant - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar level at boiler room
Dec 13, 2025
Open — Nov sent out - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at . in the entrance located at apt 1b, 1st story, 1st apartment from north at east
Dec 13, 2025 · Apt 1B
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 1b, 1st story, 1st apartment from north at east
Dec 13, 2025 · Apt 1B
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Nov 1, 2025
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Nov 1, 2025
Open — Nov sent out - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at door in the entrance located at apt 1a, 1st story, 1st apartment from west at north
Oct 7, 2025 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 5; wg to replace = 0; wg to repair = 1; in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Oct 7, 2025 · Apt 1A
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing frame at public hall, 1st story
Sep 19, 2025
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story
Sep 19, 2025
Closed — Violation closed
DOB building violations · 16
- Construction other optional
Failure to maintain building in code compliant manner. for stress cracks along both side public hallway approx 8'x1" long. structural stability has been compromised.
Aug 16, 2023
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed
Show 6 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 8, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 4, 1993
Dob violation - dismissed
ECB violations · 7
- Class - 1
Failure to maintain building in code compliant manner. observed stress cracks along both sides of public hallway approx 8'x1" long. entry doors are inoperable something has shifted, structural stability is comp
Aug 16, 2023 · Penalty $6,250
Resolve - Class - 3
Failure to maintain bldg in code compliant manner. noted: treat at front entrance stairs cracked/loose. approx 100 ft of gutter has fallen off roof soffit at south side of bldg. yard is overgrown at same locati
Apr 3, 2009 · Penalty $500
Active - Non-hazardous
Drainage system not in accordance.w/rs-16 non hazardous witnessed two pvc pump outlets piped out from the basement of above addressed on theleft side & rear of the bldg.remedy:remove 2 pvc drains connect ( )
May 16, 2008 · Penalty $2,500
Active - Hazardous
Failure to maintain bldg.noted:stairs leading from entrance to bottom walkway are loose on various entrance ways(garden apts)& could be hazardous to public.at north east side of property fenceis collapsing also
Apr 17, 2007 · Penalty $2,500
Active - Hazardous
Failure ot maintain adequate housekeeping.noted:throughout entire garden apt complex debris scattered around-broken branches,leaves piled up(restricting flow of storm water)around fence, broken bottles scatter
Apr 17, 2007 · Penalty $1,000
Active - Non-hazardous
Failure to maintain. defect is: fence broken, leaning into property at front south side. remedy: repair and/or replace
Aug 26, 2003
Resolve - Non-hazardous
Exit door swings against the flow of egress. defect: front door, entrance door swings in blocking door to apartment north side door front. ( hallway ent) remedy: repair and/ or replace.
Aug 26, 2003
Resolve
Complaints
- Unsanitary condition
Mold
Sep 29, 2026 · Apt BASEME
Close - Unsanitary condition
Pests
Sep 29, 2026 · Apt 1A
Close - Water leak
Heavy flow
Sep 29, 2026 · Apt BASEME
Close - Unsanitary condition
Pests
Sep 29, 2026 · Apt BASEME
Close - Unsanitary condition
Sewage
Sep 29, 2026 · Apt BASEME
Close - Unsanitary condition
Pests
Sep 29, 2026 · Apt BASEME
Close - Unsanitary condition
Garbage/recycling storage
Sep 29, 2026 · Apt BASEME
Close - Unsanitary condition
Sewage
Sep 29, 2026 · Apt 1A
Close - Water leak
Heavy flow
Sep 29, 2026 · Apt 1A
Close - Paint/plaster
Ceiling
Sep 18, 2026 · Apt 1B
Close
Show 40 more ↓
- Door/window
Window frame
Sep 18, 2026 · Apt 1B
Close - Unsanitary condition
Mold
Sep 18, 2026 · Apt 1B
Close - Unsanitary condition
Mold
Sep 4, 2026 · Apt 1B
Close - Door/window
Window frame
Sep 4, 2026 · Apt 1B
Close - Paint/plaster
Ceiling
Sep 4, 2026 · Apt 1B
Close - Unsanitary condition
Mold
Feb 24, 2026 · Apt 2B
Close - Flooring/stairs
Floor
Feb 24, 2026 · Apt 2B
Close - Door/window
Window frame
Jan 18, 2026 · Apt 2A
Close - General
Cabinet
Dec 10, 2025 · Apt 1B
Open - Unsanitary condition
Pests
Dec 10, 2025 · Apt 1B
Open - Unsanitary condition
Pests
Dec 10, 2025 · Apt 1B
Open - Heat/hot water
Apartment only
Dec 10, 2025 · Apt 1B
Open - Door/window
Door frame
Dec 10, 2025 · Apt 1B
Open - Door/window
Door
Dec 10, 2025 · Apt 1B
Open - Unsanitary condition
Pests
Jul 14, 2025 · Apt 2A
Close - Door/window
Door
Apr 13, 2025 · Apt BUILDI
Close - Heat/hot water
Entire building
Apr 10, 2025 · Apt BLDG
Close - Plumbing
Water supply
Apr 10, 2025 · Apt 2B
Close - Plumbing
Water supply
Feb 3, 2025 · Apt 262B
Close - Water leak
Heavy flow
Jan 20, 2025 · Apt 1B
Close - Unsanitary condition
Pests
May 2, 2024 · Apt 1B
Close - Safety
Window guard broken/missing
May 2, 2024 · Apt 1B
Close - Door/window
Window frame
May 2, 2024 · Apt 1B
Close - Safety
Carbon monoxide detector
May 2, 2024 · Apt 1B
Close - Appliance
Electric/gas range
May 2, 2024 · Apt 1B
Close - Safety
Smoke detector
May 2, 2024 · Apt 1B
Close - Paint/plaster
Wall
May 2, 2024 · Apt 1B
Close - Water leak
Heavy flow
May 2, 2024 · Apt 1B
Close - Unsanitary condition
Mold
Apr 24, 2024 · Apt 1B
Close - Door/window
Window frame
Apr 24, 2024 · Apt 1B
Close - Unsanitary condition
Mold
Aug 25, 2023 · Apt 1A
Close - Unsanitary condition
Mold
Aug 25, 2023 · Apt 1A
Close - Plumbing
Basin/sink
Aug 25, 2023 · Apt 1A
Close - Plumbing
Toilet
Aug 25, 2023 · Apt 1A
Close - Appliance
Refrigerator
Aug 25, 2023 · Apt 1A
Close - Unsanitary condition
Pests
Jul 9, 2022 · Apt 1A
Close - Unsanitary condition
Pests
Aug 15, 2020 · Apt 2B
Close - Unsanitary condition
Pests
Aug 15, 2020 · Apt 2B
Close - Unsanitary condition
Sewage
Aug 15, 2020 · Apt 2B
Close - Plumbing
Water supply
Jan 13, 2020 · Apt 1B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C9)
- Year built
- 1969
- Floors
- 2
- Residential units
- 36
- Building area
- 26,262 ft²
- Lot area
- 63,624 ft²
- Zoning
- R3A
- Community board
- 503
- Council district
- 51
- Block / lot
- 5250 / 16
- Assessed value
- $957,150
- Landmark / historic district
- No
HPD registration #501798, last renewed Jul 9, 2026.
Questions about 12 Hillcrest Avenue
Who owns 12 Hillcrest Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Hillcrest Garden LLC.
Does 12 Hillcrest Avenue have violations?
Yes. NYC HPD has recorded 169 housing violations at this property.
Is 12 Hillcrest Avenue rent stabilized?
NYC Department of Finance tax bills listed 36 rent-stabilized units here in 2024 (about 100% of its 36 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 12 Hillcrest Avenue built?
City records list 1969 as the year it was built.
How many apartments are in 12 Hillcrest Avenue?
It has 36 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.