roofy

109 Lyman Avenue

Staten Island, NY 10305BBL 5-03071-0015Map

Owner of record: Bridgeview Garden Apartments LLC

109 Lyman Avenue is a walk-up apartment building built in 1973 in Staten Island, 10305. It has 42 residential units across 2 floors. The owner of record is Bridgeview Garden Apartments LLC. HPD has recorded 24 housing violations here, most recently on April 3, 2025. 3 of the 24 most recent violations are still open. City tax records listed 42 rent-stabilized apartments here in 2024.

HPD violations
24
DOB violations
28
ECB violations
29
HPD complaints
107

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Apr 3, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
42
About 100% of the building's 42 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 24

  • B

    Properly repair with similar material the broken or defective uneven wood floor in the 3rd room from north at west located at apt 2b, 2nd story, 1st apartment from south at west

    Apr 3, 2025 · Apt 2B

    Closed — Violation dismissed
  • B

    Abate the nuisance consisting of pests. evidence of termites in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west

    Apr 3, 2025 · Apt 2B

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective intercom relay system from building front to east wall in the foyer located at apt 2b, 2nd story, 1st apartment from south at west

    Apr 3, 2025 · Apt 2B

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Apr 1, 2025

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Apr 1, 2025

    Closed — Violation dismissed
  • C

    Remove device preventing door from being self-closing kikickstand at building entrance door at public hall, 1st story

    Apr 1, 2025

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 16, 2024

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor [ missing frame ] at public hall, 1st story

    Sep 22, 2022

    Open — Nov certified late
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Sep 22, 2022

    Open — Nov certified late
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Sep 22, 2022

    Open — Nov certified late
Show 14 more ↓
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 8, 2022

    Closed — Violation dismissed
  • A

    Properly repair with similar material the broken or defective [ parquet ] wood floor in the private hallway located at apt 2b, 2nd story, 1st apartment from south at west , section ''109''

    Aug 11, 2021 · Apt 2B

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 25, 2018

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department ceilings and walls throughout in the entire apartment located at apt 2b, 2nd story, 1st apartment from west at north

    Jul 21, 2017 · Apt 2B

    Closed — Violation dismissed
  • A

    Properly repair with similar material the broken or defective vinyl floor tile in the kitchen located at apt 2b, 2nd story, 1st apartment from west at north

    Jul 21, 2017 · Apt 2B

    Closed — Violation dismissed
  • B

    Properly secure the loose west iron handrail front of building at stoop, section ''bldg#109''

    Jun 19, 2017

    Closed — Violation closed
  • B

    Properly repair the broken or defective bell buzzer

    Feb 4, 2013

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective 4 sq, ft, cement walkway at building 109 at front areaway

    Mar 30, 2011

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective 4 sq, ft. of cement walkway at building 115 at front areaway

    Mar 30, 2011

    Closed — Violation closed
  • B

    Provide hand rail at building 103 at stoop

    Mar 30, 2011

    Closed — Violation closed
  • B

    Provide hand rail at building 121 at stoop

    Mar 30, 2011

    Closed — Violation dismissed
  • B

    Provide hand rails at bldg. 103 at stoop, 1st story

    Oct 29, 2010

    Closed — Violation closed
  • B

    Provide adequate light of not less than 60 watts incandescent or equivalent illumination at public hall, 1st story

    Aug 12, 2005

    Closed — Violation closed
  • A

    Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration 5ftw x 8ftl x 6ft high plywood shed erected at west yard at north

    Apr 8, 2001 · Apt BLDG

    Closed — Violation closed

DOB building violations · 28

  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2021

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 2, 2021

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
Show 18 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - active
  • Construction other optional

    C-construction other optional

    Jun 14, 1994

    Vp*-violation unserved ecb- dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 8, 1994

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 4, 1993

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 4, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 4, 1993

    Dob violation - dismissed

ECB violations · 29

  • Class - 2

    At exposure 1, 3 and 4 at multiple location eroded mortar joints. front entrance stoop has horizontal crack., repair and/or replace

    Aug 3, 2021

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner.at time of inspection observed at parking lot reinforced concrete wall with cracks at several points with 1"-4" width.parking lot with settled at several a

    Jul 12, 2021

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner. noted:at the time of inspection it was observed that the rail and front step of 109 bldg was loose causing a tripping hazard to tenants in the bldg. remedy

    Jul 7, 2021

    Resolve
  • Class - 2

    15.36.50.24b.38.50a.36-hydrotherm hot water boiler model ii hc-65 is not registered,15-opening in wall into laundry room-24b missing remote control switch outside the boiler room-38-50-missing backflow prevente

    Jan 17, 2018 · Penalty $500

    Active
  • Class - 2

    36.38.50b.24b.50.36-found boiler hydrotherm model hc-65 not registered.24-b-outside the boiler room 50-missing backflow preventer 50b-missing spill switch.

    Jan 17, 2018 · Penalty $500

    Active
  • Class - 2

    36.38.50a.24b.50.36-hydrotherm model hc-65 is not registered.24b-outside the boiler room/50-missing spill switch 50a-missing backflow preventer.

    Jan 17, 2018 · Penalty $500

    Active
  • Class - 2

    36.38.50a.24b.50.36-found hydrotherm model hc65 not registered 24b-outside the boiler room/50-missing spill switch 50a-missing backflow preventer.

    Jan 17, 2018

    Resolve
  • Class - 2

    36.38.50a.24b.50.36-found hydrotherm model hc 65 not registered.24b-outside-50-missing spill switch 50a missing backflow preventer.

    Jan 17, 2018 · Penalty $500

    Active
  • Class - 2

    36.38.50a.24b.50.36-hydrotherm boiler model hc 65 is not registered 24-b-outside the boiler room 50-/missing spill switch/50a missing backflow preventer.

    Jan 17, 2018 · Penalty $500

    Active
  • Class - 2

    15.36.50.24b.38.50a.36-found hydrotherm model hc-65 not registered.24b-outside the boiler room/50-missing spill switch-50a-missing back flowpreventer.

    Jan 17, 2018 · Penalty $500

    Active
Show 19 more ↓
  • Class - 2

    36.38.50a.24b.50.36-hydrotherm boiler model hc 65 is not registered.24b-outside the boiler room/50-missing spill switch 50a-missing backflowpreventer.

    Jan 17, 2018 · Penalty $500

    Active
  • Class - 2

    Failure to maintain parking lot in a code compliant manner. noted: thecatch water drains of storm water in parking lot near by bldg #109 is sinking & clogged. both drain restore improperly pose danger to occupa

    Mar 6, 2014

    Resolve
  • Non-hazardous

    Work wihtout a permit work noted at east end of parking lot in wooded area approx 30 cubic yards of clean fill has been added to existing grade & graded to its present contour remedy:obtain a permit that reflec

    Jun 10, 2004

    Resolve
  • Non-hazardous

    32a,50.32a-exposed wires in electrical boxes and circulator pump at rear of boiler. 50-feedwater pressure line is not connected to the piping system part 4 of title 12 section 4-14.4b

    Feb 11, 2004

    Resolve
  • Non-hazardous

    32a,50. 32a-exposed wiring in electrical boxes and circulator pump at rear of boiler. 50-feedwater pressure line is not connected to the piping system prt 4 of title 12 section 4-14.b

    Feb 11, 2004

    Resolve
  • Non-hazardous

    32a,50. 32a-exposed wiring in electrical boxes and circulator pump at rear of boiler. 50-feedwater pressure line is not connected to the piping system part 4 of title 12 section 4-14.4b

    Feb 11, 2004

    Resolve
  • Non-hazardous

    32a,50.32a-exposed wiring in electrical boxes and circulator pump at rear of boiler 50-feedwater pressure line is not connected into the piping system part 4 of title 12 section 4-144b

    Feb 11, 2004

    Resolve
  • Non-hazardous

    32a,50.32a-exposed wiring in electrical boxes and circulator pump at rear of boiler. 50-feedback pressure line is not connected into the piping system-part 4 article 12 section 4-14.4b

    Feb 11, 2004

    Resolve
  • Non-hazardous

    32a,50 32a-exposed wiring in electrical boxes and circulator pump at rear of boiler.50-feedback pressure line is not connected into the piping system part 4 title 12 section 4-14.4b

    Feb 11, 2004

    Resolve
  • Hazardous

    36,4a,19b, (bq9) section (27-147) work without permit.

    Jul 23, 1998 · Penalty $180

    Resolve
  • Hazardous

    4a,19b,36 (bq9) section (27-147) work without permit.

    Jul 23, 1998 · Penalty $180

    Resolve
  • Hazardous

    4a,19b,36 (bqp) section (27-147) work without permit.

    Jul 23, 1998 · Penalty $180

    Resolve
  • Hazardous

    4a,19b,36, (bq9) section (27-147) work without permit.

    Jul 23, 1998 · Penalty $180

    Resolve
  • Non-hazardous

    4a,19b,36 (bq9) section (27-147) work without permit.

    Jul 23, 1998 · Penalty $180

    Resolve
  • Hazardous

    4a,19b,36 (bq9) section (27-147) work without permit.

    Jul 23, 1998 · Penalty $180

    Resolve
  • Hazardous

    4a,19b,36 (bq9) section (27-147) work without permit.

    Jul 23, 1998 · Penalty $180

    Resolve
  • Hazardous

    4a,19b,36 (bq9) section (27-147) work without permit.

    Jul 23, 1998 · Penalty $180

    Resolve
  • Hazardous

    4a,19b,36 (bq9) section (27-147) work without permit.

    Jul 23, 1998 · Penalty $180

    Resolve
  • Hazardous

    4a,19b,36 (bq9) code (27-147) work without permit

    Jul 23, 1998 · Penalty $800

    Resolve

Complaints

  • Paint/plaster

    Wall

    Mar 28, 2025 · Apt 2B

    Close
  • Flooring/stairs

    Floor

    Mar 28, 2025 · Apt 2B

    Close
  • Plumbing

    Bathtub/shower

    Mar 28, 2025 · Apt 2B

    Close
  • Unsanitary condition

    Pests

    Mar 28, 2025 · Apt 2B

    Close
  • Unsanitary condition

    Mold

    Mar 28, 2025 · Apt 2B

    Close
  • Electric

    Wiring

    Mar 28, 2025 · Apt 2B

    Close
  • General

    Bell/buzzer/intercom

    Mar 28, 2025 · Apt 2B

    Close
  • Unsanitary condition

    Mold

    Aug 7, 2022 · Apt 1A

    Close
  • Water leak

    Slow leak

    Aug 7, 2022 · Apt 1A

    Close
  • Outside building

    Pavement

    Jul 18, 2022 · Apt 1A

    Close
Show 40 more ↓
  • Unsanitary condition

    Mold

    Aug 25, 2021 · Apt 1C

    Close
  • Paint/plaster

    Ceiling

    Aug 25, 2021 · Apt 1C

    Close
  • Flooring/stairs

    Floor

    Aug 25, 2021 · Apt 1C

    Close
  • Flooring/stairs

    Floor

    Aug 25, 2021 · Apt 1C

    Close
  • Plumbing

    Bathtub/shower

    Aug 25, 2021 · Apt 1C

    Close
  • Flooring/stairs

    Floor

    Aug 3, 2021 · Apt 2B

    Close
  • Unsanitary condition

    Pests

    May 27, 2021 · Apt 1C

    Close
  • Electric

    Lighting

    May 23, 2018 · Apt 2A

    Close
  • Electric

    Lighting

    May 23, 2018 · Apt 2A

    Close
  • Electric

    Lighting

    May 17, 2018 · Apt 2A

    Close
  • Water leak

    Slow leak

    May 3, 2018 · Apt 1B

    Close
  • Water leak

    Slow leak

    May 3, 2018 · Apt 1B

    Close
  • Unsanitary condition

    Mold

    May 3, 2018 · Apt 1B

    Close
  • Unsanitary condition

    Mold

    May 3, 2018 · Apt 1B

    Close
  • Water leak

    Slow leak

    May 2, 2018 · Apt 1B

    Close
  • Water leak

    Slow leak

    May 2, 2018 · Apt 1B

    Close
  • Unsanitary condition

    Mold

    May 2, 2018 · Apt 1B

    Close
  • Unsanitary condition

    Mold

    May 2, 2018 · Apt 1B

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Aug 30, 2017 · Apt BLDG

    Close
  • Door/window

    Window frame

    Aug 30, 2017 · Apt 2B

    Close
  • Door/window

    Window frame

    Aug 9, 2017 · Apt 2B

    Close
  • Door/window

    Window frame

    Jul 6, 2017 · Apt 2B

    Close
  • Paint/plaster

    Ceiling

    Jun 16, 2017 · Apt 2B

    Close
  • Unsanitary condition

    Pests

    Jun 8, 2017 · Apt 2B

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jun 8, 2017 · Apt 2B

    Close
  • Flooring/stairs

    Floor

    Jun 8, 2017 · Apt 2B

    Close
  • Outside building

    Pavement

    Jun 8, 2017 · Apt 2B

    Close
  • Flooring/stairs

    Stairs

    Jun 8, 2017 · Apt 2B

    Close
  • Paint/plaster

    Wall

    Jun 8, 2017 · Apt 2B

    Close
  • Paint/plaster

    Wall

    Jun 8, 2017 · Apt 2B

    Close
  • Flooring/stairs

    Stairs

    Jun 8, 2017 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Mar 13, 2017 · Apt 1B

    Close
  • Heat/hot water

    Apartment only

    Feb 14, 2015 · Apt 2B

    Close
  • Construction

    Pavement

    Feb 11, 2014 · Apt BLDG

    Close
  • Electric

    Bell-buzzer/intercom

    Jan 26, 2013 · Apt NA

    Close
  • Electric

    Bell-buzzer/intercom

    Jan 26, 2013 · Apt NA

    Close
  • Paint/plaster

    Ceiling

    Sep 17, 2012 · Apt 1D

    Close
  • Paint/plaster

    Ceiling

    Sep 17, 2012 · Apt 1D

    Close
  • Paint/plaster

    Ceiling

    Sep 17, 2012 · Apt 1D

    Close
  • General

    Mold

    Sep 17, 2012 · Apt 1D

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C9)
Year built
1973
Floors
2
Residential units
42
Building area
31,532 ft²
Lot area
63,000 ft²
Zoning
R3-2
Community board
501
Council district
49
Block / lot
3071 / 15
Assessed value
$1,557,000
Landmark / historic district
No

HPD registration #501038, last renewed Jun 24, 2026.

Questions about 109 Lyman Avenue

Who owns 109 Lyman Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Bridgeview Garden Apartments LLC.

Does 109 Lyman Avenue have violations?

Yes. NYC HPD has recorded 24 housing violations at this property.

Is 109 Lyman Avenue rent stabilized?

NYC Department of Finance tax bills listed 42 rent-stabilized units here in 2024 (about 100% of its 42 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 109 Lyman Avenue built?

City records list 1973 as the year it was built.

How many apartments are in 109 Lyman Avenue?

It has 42 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.