109 Lyman Avenue
Staten Island, NY 10305BBL 5-03071-0015Map
Owner of record: Bridgeview Garden Apartments LLC
109 Lyman Avenue is a walk-up apartment building built in 1973 in Staten Island, 10305. It has 42 residential units across 2 floors. The owner of record is Bridgeview Garden Apartments LLC. HPD has recorded 24 housing violations here, most recently on April 3, 2025. 3 of the 24 most recent violations are still open. City tax records listed 42 rent-stabilized apartments here in 2024.
- HPD violations
- 24
- DOB violations
- 28
- ECB violations
- 29
- HPD complaints
- 107
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 24
- BHazardous
Properly repair with similar material the broken or defective uneven wood floor in the 3rd room from north at west located at apt 2b, 2nd story, 1st apartment from south at west
Apr 3, 2025 · Apt 2B
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of pests. evidence of termites in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west
Apr 3, 2025 · Apt 2B
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective intercom relay system from building front to east wall in the foyer located at apt 2b, 2nd story, 1st apartment from south at west
Apr 3, 2025 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Apr 1, 2025
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Apr 1, 2025
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing kikickstand at building entrance door at public hall, 1st story
Apr 1, 2025
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 16, 2024
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor [ missing frame ] at public hall, 1st story
Sep 22, 2022
Open — Nov certified late - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Sep 22, 2022
Open — Nov certified late - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Sep 22, 2022
Open — Nov certified late
Show 14 more ↓
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 8, 2022
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective [ parquet ] wood floor in the private hallway located at apt 2b, 2nd story, 1st apartment from south at west , section ''109''
Aug 11, 2021 · Apt 2B
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 25, 2018
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceilings and walls throughout in the entire apartment located at apt 2b, 2nd story, 1st apartment from west at north
Jul 21, 2017 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective vinyl floor tile in the kitchen located at apt 2b, 2nd story, 1st apartment from west at north
Jul 21, 2017 · Apt 2B
Closed — Violation dismissed - BHazardous
Properly secure the loose west iron handrail front of building at stoop, section ''bldg#109''
Jun 19, 2017
Closed — Violation closed - BHazardous
Properly repair the broken or defective bell buzzer
Feb 4, 2013
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective 4 sq, ft, cement walkway at building 109 at front areaway
Mar 30, 2011
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective 4 sq, ft. of cement walkway at building 115 at front areaway
Mar 30, 2011
Closed — Violation closed - BHazardous
Provide hand rail at building 103 at stoop
Mar 30, 2011
Closed — Violation closed - BHazardous
Provide hand rail at building 121 at stoop
Mar 30, 2011
Closed — Violation dismissed - BHazardous
Provide hand rails at bldg. 103 at stoop, 1st story
Oct 29, 2010
Closed — Violation closed - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination at public hall, 1st story
Aug 12, 2005
Closed — Violation closed - ANon-hazardous
Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration 5ftw x 8ftl x 6ft high plywood shed erected at west yard at north
Apr 8, 2001 · Apt BLDG
Closed — Violation closed
DOB building violations · 28
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2021
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed
Show 18 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Construction other optional
C-construction other optional
Jun 14, 1994
Vp*-violation unserved ecb- dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 8, 1994
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 4, 1993
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 4, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 4, 1993
Dob violation - dismissed
ECB violations · 29
- Class - 2
At exposure 1, 3 and 4 at multiple location eroded mortar joints. front entrance stoop has horizontal crack., repair and/or replace
Aug 3, 2021
Resolve - Class - 2
Failure to maintain building in code compliant manner.at time of inspection observed at parking lot reinforced concrete wall with cracks at several points with 1"-4" width.parking lot with settled at several a
Jul 12, 2021
Resolve - Class - 2
Failure to maintain building in code compliant manner. noted:at the time of inspection it was observed that the rail and front step of 109 bldg was loose causing a tripping hazard to tenants in the bldg. remedy
Jul 7, 2021
Resolve - Class - 2
15.36.50.24b.38.50a.36-hydrotherm hot water boiler model ii hc-65 is not registered,15-opening in wall into laundry room-24b missing remote control switch outside the boiler room-38-50-missing backflow prevente
Jan 17, 2018 · Penalty $500
Active - Class - 2
36.38.50b.24b.50.36-found boiler hydrotherm model hc-65 not registered.24-b-outside the boiler room 50-missing backflow preventer 50b-missing spill switch.
Jan 17, 2018 · Penalty $500
Active - Class - 2
36.38.50a.24b.50.36-hydrotherm model hc-65 is not registered.24b-outside the boiler room/50-missing spill switch 50a-missing backflow preventer.
Jan 17, 2018 · Penalty $500
Active - Class - 2
36.38.50a.24b.50.36-found hydrotherm model hc65 not registered 24b-outside the boiler room/50-missing spill switch 50a-missing backflow preventer.
Jan 17, 2018
Resolve - Class - 2
36.38.50a.24b.50.36-found hydrotherm model hc 65 not registered.24b-outside-50-missing spill switch 50a missing backflow preventer.
Jan 17, 2018 · Penalty $500
Active - Class - 2
36.38.50a.24b.50.36-hydrotherm boiler model hc 65 is not registered 24-b-outside the boiler room 50-/missing spill switch/50a missing backflow preventer.
Jan 17, 2018 · Penalty $500
Active - Class - 2
15.36.50.24b.38.50a.36-found hydrotherm model hc-65 not registered.24b-outside the boiler room/50-missing spill switch-50a-missing back flowpreventer.
Jan 17, 2018 · Penalty $500
Active
Show 19 more ↓
- Class - 2
36.38.50a.24b.50.36-hydrotherm boiler model hc 65 is not registered.24b-outside the boiler room/50-missing spill switch 50a-missing backflowpreventer.
Jan 17, 2018 · Penalty $500
Active - Class - 2
Failure to maintain parking lot in a code compliant manner. noted: thecatch water drains of storm water in parking lot near by bldg #109 is sinking & clogged. both drain restore improperly pose danger to occupa
Mar 6, 2014
Resolve - Non-hazardous
Work wihtout a permit work noted at east end of parking lot in wooded area approx 30 cubic yards of clean fill has been added to existing grade & graded to its present contour remedy:obtain a permit that reflec
Jun 10, 2004
Resolve - Non-hazardous
32a,50.32a-exposed wires in electrical boxes and circulator pump at rear of boiler. 50-feedwater pressure line is not connected to the piping system part 4 of title 12 section 4-14.4b
Feb 11, 2004
Resolve - Non-hazardous
32a,50. 32a-exposed wiring in electrical boxes and circulator pump at rear of boiler. 50-feedwater pressure line is not connected to the piping system prt 4 of title 12 section 4-14.b
Feb 11, 2004
Resolve - Non-hazardous
32a,50. 32a-exposed wiring in electrical boxes and circulator pump at rear of boiler. 50-feedwater pressure line is not connected to the piping system part 4 of title 12 section 4-14.4b
Feb 11, 2004
Resolve - Non-hazardous
32a,50.32a-exposed wiring in electrical boxes and circulator pump at rear of boiler 50-feedwater pressure line is not connected into the piping system part 4 of title 12 section 4-144b
Feb 11, 2004
Resolve - Non-hazardous
32a,50.32a-exposed wiring in electrical boxes and circulator pump at rear of boiler. 50-feedback pressure line is not connected into the piping system-part 4 article 12 section 4-14.4b
Feb 11, 2004
Resolve - Non-hazardous
32a,50 32a-exposed wiring in electrical boxes and circulator pump at rear of boiler.50-feedback pressure line is not connected into the piping system part 4 title 12 section 4-14.4b
Feb 11, 2004
Resolve - Hazardous
36,4a,19b, (bq9) section (27-147) work without permit.
Jul 23, 1998 · Penalty $180
Resolve - Hazardous
4a,19b,36 (bq9) section (27-147) work without permit.
Jul 23, 1998 · Penalty $180
Resolve - Hazardous
4a,19b,36 (bqp) section (27-147) work without permit.
Jul 23, 1998 · Penalty $180
Resolve - Hazardous
4a,19b,36, (bq9) section (27-147) work without permit.
Jul 23, 1998 · Penalty $180
Resolve - Non-hazardous
4a,19b,36 (bq9) section (27-147) work without permit.
Jul 23, 1998 · Penalty $180
Resolve - Hazardous
4a,19b,36 (bq9) section (27-147) work without permit.
Jul 23, 1998 · Penalty $180
Resolve - Hazardous
4a,19b,36 (bq9) section (27-147) work without permit.
Jul 23, 1998 · Penalty $180
Resolve - Hazardous
4a,19b,36 (bq9) section (27-147) work without permit.
Jul 23, 1998 · Penalty $180
Resolve - Hazardous
4a,19b,36 (bq9) section (27-147) work without permit.
Jul 23, 1998 · Penalty $180
Resolve - Hazardous
4a,19b,36 (bq9) code (27-147) work without permit
Jul 23, 1998 · Penalty $800
Resolve
Complaints
- Paint/plaster
Wall
Mar 28, 2025 · Apt 2B
Close - Flooring/stairs
Floor
Mar 28, 2025 · Apt 2B
Close - Plumbing
Bathtub/shower
Mar 28, 2025 · Apt 2B
Close - Unsanitary condition
Pests
Mar 28, 2025 · Apt 2B
Close - Unsanitary condition
Mold
Mar 28, 2025 · Apt 2B
Close - Electric
Wiring
Mar 28, 2025 · Apt 2B
Close - General
Bell/buzzer/intercom
Mar 28, 2025 · Apt 2B
Close - Unsanitary condition
Mold
Aug 7, 2022 · Apt 1A
Close - Water leak
Slow leak
Aug 7, 2022 · Apt 1A
Close - Outside building
Pavement
Jul 18, 2022 · Apt 1A
Close
Show 40 more ↓
- Unsanitary condition
Mold
Aug 25, 2021 · Apt 1C
Close - Paint/plaster
Ceiling
Aug 25, 2021 · Apt 1C
Close - Flooring/stairs
Floor
Aug 25, 2021 · Apt 1C
Close - Flooring/stairs
Floor
Aug 25, 2021 · Apt 1C
Close - Plumbing
Bathtub/shower
Aug 25, 2021 · Apt 1C
Close - Flooring/stairs
Floor
Aug 3, 2021 · Apt 2B
Close - Unsanitary condition
Pests
May 27, 2021 · Apt 1C
Close - Electric
Lighting
May 23, 2018 · Apt 2A
Close - Electric
Lighting
May 23, 2018 · Apt 2A
Close - Electric
Lighting
May 17, 2018 · Apt 2A
Close - Water leak
Slow leak
May 3, 2018 · Apt 1B
Close - Water leak
Slow leak
May 3, 2018 · Apt 1B
Close - Unsanitary condition
Mold
May 3, 2018 · Apt 1B
Close - Unsanitary condition
Mold
May 3, 2018 · Apt 1B
Close - Water leak
Slow leak
May 2, 2018 · Apt 1B
Close - Water leak
Slow leak
May 2, 2018 · Apt 1B
Close - Unsanitary condition
Mold
May 2, 2018 · Apt 1B
Close - Unsanitary condition
Mold
May 2, 2018 · Apt 1B
Close - Unsanitary condition
Garbage/recycling storage
Aug 30, 2017 · Apt BLDG
Close - Door/window
Window frame
Aug 30, 2017 · Apt 2B
Close - Door/window
Window frame
Aug 9, 2017 · Apt 2B
Close - Door/window
Window frame
Jul 6, 2017 · Apt 2B
Close - Paint/plaster
Ceiling
Jun 16, 2017 · Apt 2B
Close - Unsanitary condition
Pests
Jun 8, 2017 · Apt 2B
Close - Unsanitary condition
Garbage/recycling storage
Jun 8, 2017 · Apt 2B
Close - Flooring/stairs
Floor
Jun 8, 2017 · Apt 2B
Close - Outside building
Pavement
Jun 8, 2017 · Apt 2B
Close - Flooring/stairs
Stairs
Jun 8, 2017 · Apt 2B
Close - Paint/plaster
Wall
Jun 8, 2017 · Apt 2B
Close - Paint/plaster
Wall
Jun 8, 2017 · Apt 2B
Close - Flooring/stairs
Stairs
Jun 8, 2017 · Apt 2B
Close - Heat/hot water
Apartment only
Mar 13, 2017 · Apt 1B
Close - Heat/hot water
Apartment only
Feb 14, 2015 · Apt 2B
Close - Construction
Pavement
Feb 11, 2014 · Apt BLDG
Close - Electric
Bell-buzzer/intercom
Jan 26, 2013 · Apt NA
Close - Electric
Bell-buzzer/intercom
Jan 26, 2013 · Apt NA
Close - Paint/plaster
Ceiling
Sep 17, 2012 · Apt 1D
Close - Paint/plaster
Ceiling
Sep 17, 2012 · Apt 1D
Close - Paint/plaster
Ceiling
Sep 17, 2012 · Apt 1D
Close - General
Mold
Sep 17, 2012 · Apt 1D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C9)
- Year built
- 1973
- Floors
- 2
- Residential units
- 42
- Building area
- 31,532 ft²
- Lot area
- 63,000 ft²
- Zoning
- R3-2
- Community board
- 501
- Council district
- 49
- Block / lot
- 3071 / 15
- Assessed value
- $1,557,000
- Landmark / historic district
- No
HPD registration #501038, last renewed Jun 24, 2026.
Questions about 109 Lyman Avenue
Who owns 109 Lyman Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Bridgeview Garden Apartments LLC.
Does 109 Lyman Avenue have violations?
Yes. NYC HPD has recorded 24 housing violations at this property.
Is 109 Lyman Avenue rent stabilized?
NYC Department of Finance tax bills listed 42 rent-stabilized units here in 2024 (about 100% of its 42 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 109 Lyman Avenue built?
City records list 1973 as the year it was built.
How many apartments are in 109 Lyman Avenue?
It has 42 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.