roofy

Violations at 48 Grissom Avenue

Staten Island, NY 10314 · BBL 5-02015-7501 · Back to the property

HPD housing violations

25 HPD violations, newest first.

  • ANon-hazardous

    Trace and repair the source and abate the visible mold condition... greater than 10sq ft on wood baseboard at east and west walls inside laundry room at cellar

    Aug 6, 2026

    Open — Nov sent out
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Mar 28, 2022

    Open — Info nov sent out
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1fl, 1st story, 1st apartment from south at west

    Mar 25, 2022 · Apt 1FL

    Closed — Violation dismissed
  • CImmediately hazardous

    Repair the broken or defective connection waste pipe under the sink in the kitchen located at apt 1fl, 1st story, 1st apartment from south at west

    Mar 25, 2022 · Apt 1FL

    Closed — Violation closed
  • ANon-hazardous

    Cleanse to the satisfaction of this department the visible evidence of mold grout east, south, and west walls at bathtub in the bathroom located at apt 1, 1st story, 1st apartment from south at west

    Jan 7, 2022 · Apt 1

    Closed — Violation dismissed
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1, 1st story, 1st apartment from south at west

    Jan 7, 2022 · Apt 1

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective wood flooring in the 1st room from east located at apt 1, 1st story, 1st apartment from south at west

    Jan 7, 2022 · Apt 1

    Open — Nov sent out
  • ANon-hazardous

    Trace and repair the source and abate the visible mold condition... west wall under sink in the kitchen located at apt 1, 1st story, 1st apartment from south at west

    Jan 7, 2022 · Apt 1

    Closed — Violation dismissed
  • BHazardous

    Properly repair with similar material the broken or defective vinyl floor in the 1st room from east located at apt a, 1st story, 1st apartment from south at west

    Jan 3, 2022 · Apt A

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from east located at apt 1floor, 1st story, 1st apartment from south at west

    Dec 8, 2021 · Apt 1FLOOR

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling and east wall in the 1st room from east located at apt 1floor, 1st story, 1st apartment from south at west

    Dec 8, 2021 · Apt 1FLOOR

    Closed — Violation dismissed
  • BHazardous

    Repair the roof so that it will not leak over the ceiling in the 1st room from east located at apt 1floor, 1st story, 1st apartment from south at west

    Dec 8, 2021 · Apt 1FLOOR

    Closed — Violation dismissed
  • ANon-hazardous

    Refit entrance door at the upper level in the 1st room from north located at apt 1floor, 1st story, 1st apartment from south at west

    Dec 8, 2021 · Apt 1FLOOR

    Closed — Violation dismissed
  • BHazardous

    Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt 1floor, 1st story, 1st apartment from south at west

    Dec 8, 2021 · Apt 1FLOOR

    Closed — Violation dismissed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 7, 2019

    Closed — Violation dismissed
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1, 1st story

    Dec 12, 2017 · Apt 1

    Closed — Violation closed
  • ANon-hazardous

    Replace with new the missing wood saddle at entrance in the kitchen located at apt 1, 1st story

    Dec 12, 2017 · Apt 1

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 1st room from east located at apt 1 upper level, 1st story

    Dec 12, 2017 · Apt 1

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 2nd room from east located at apt 1 upper level, 1st story

    Dec 12, 2017 · Apt 1

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the bathroom located at apt 1 upper level, 1st story

    Dec 12, 2017 · Apt 1

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color east wall in the 1st room from east located at apt 1, 1st story

    Dec 12, 2017 · Apt 1

    Closed — Violation closed
  • BHazardous

    Repair the roof so that it will not leak at ceiling in the 2nd room from north located at apt 1 mid level, 1st story

    Mar 11, 2016 · Apt 1

    Open — Nov sent out
  • ANon-hazardous

    Refit entrance door to apt in the entrance located at apt 1, 1st story

    Jan 26, 2014 · Apt 1

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in uniform color ceilings in the entire apartment located at apt 1, 2nd story

    Jan 26, 2014 · Apt 1

    Open — Nov sent out
  • CImmediately hazardous

    Repair the roof so that it will not leak roof in the entire apartment located at apt 1, 2nd story

    Jan 26, 2014 · Apt 1

    Closed — Violation closed

DOB building violations

No DOB violations on record

ECB violations

19 ECB violations, newest first.

  • Class - 2

    Failure to maintain: at roof level multiple leaks at skylight and party wall noted. remedy: repair/and or/replace.

    Oct 8, 2023 · Penalty $3,125

    Active
  • Non-hazardous

    Work does not confrom to approved plans non conforming work noted at front of premises erected wood deck apprx 10'x 10'18' off ground nb/43482 no deck present remedy:conform to approved plans or obtain permit

    Aug 25, 2005

    Resolve
  • Non-hazardous

    Work does not conform to approved plans non conforming work noted n/b 43482 indicates no deck at front of premises now erected (1)10'x10' wood deck 18'off ground approx remedy:conform to approved plans /or obta

    Aug 25, 2005

    Resolve
  • Non-hazardous

    Work does not conform to approved plans non conforming work noted nb 43482 indicates no deck at front yard now erected (1) 10'x 10' wood deck 18" off ground approx.remedy:conform to approved plans/or obtain

    Aug 25, 2005 · Penalty $130

    Resolve
  • Hazardous

    Work does not confrom to approved plans non conforming work noted at front of prmises erected deck approx 10'x 10' approx 18'' off ground all presure treated decking wood and railings remedy:confrom to approve

    Aug 25, 2005

    Resolve
  • Hazardous

    Work without a permit work noted a wood permit work noted a wood deck of appoximately 8'x 10' has been illegally on the front of the house remedy:obtain permit or restore to prior legal condition

    Aug 24, 2005

    Resolve
  • Non-hazardous

    Work w/o a permit work noted: in that at front of bldg a large wooden deck was constructed w/o approvals and permits. remedy: obtain approvals and permits if feasible or restore to prior legal condition.

    Aug 23, 2005

    Resolve
  • Non-hazardous

    Work w/o a permit work noted; in that at front of bldg a large wooden deck was constructed w/o approvals and permits. remedy: obtain approvals and permits if feasible or restore to prior legal condition.

    Aug 23, 2005

    Resolve
  • Non-hazardous

    Work w/o a permit work noted: in that at front of bldg a large wooden deck was constructed w/o approvals and permits. remedy: obtain approvals and permits if feasible or restore to prior legal condition.

    Aug 23, 2005

    Resolve
  • Non-hazardous

    Work w/o a permit work noted: in that at front of bldg large wooden deck was constructed w/o approvals and permits. remedy: obtain approvalsand permits if feasible or restore to prior legal condition.

    Aug 23, 2005 · Penalty $250

    Resolve
  • Non-hazardous

    Work w/o a permit work noted: in that at front of bldg a large wooden deck was constructed w/o approvals and permits. remedy: obtain approvals and permits if feasible or restore to prior legal condition.

    Aug 23, 2005

    Resolve
  • Non-hazardous

    Work w/o a permit work noted: in that at front of bldg a large wooden deck was constructed w/o approvals and permits. remedy: obtain approvals and permits if feasible or restore to prior legal condition.

    Aug 23, 2005 · Penalty $250

    Resolve
  • Non-hazardous

    Work w/o a permit work noted: in that at front of bldg a large wooden deck was constructed w/o approvals and permits. remedy: obtain approvals and permits if feasible or restore to prior legal condition.

    Aug 23, 2005

    Resolve
  • Non-hazardous

    Work w/o a permit work noted: in that at front of bldg a large wooden deck was constructed w/o approvals and permits. remedy: obtain approvals and permits if feasible or restore to prior legal condition.

    Aug 23, 2005 · Penalty $250

    Resolve
  • Non-hazardous

    Work w/o a permit work noted: in that at front of bldg a large wooden deck was constructed w/o approvals and permits. remedy: obtain approvals and permits if feasible or restore to prior legal condition.

    Aug 23, 2005

    Resolve
  • Non-hazardous

    Work w/o a permit work noted: in that at front of bldg a large wooden deck was constructed w/o approvals and permits. remedy: obtain approvals and permits if feasible or restore to prior legal condition.

    Aug 23, 2005 · Penalty $250

    Active
  • Non-hazardous

    Work w/o a permit work noted: in that at front of bldg a large wooden deck was constructed w/o approvals and permits. remedy: obtain approvals and permits if feasible or restore to prior legal condition.

    Aug 23, 2005

    Resolve
  • Unknown

    Work w/o a permit work noted: in that at front of bldg a large wooden deck was constructed w/o approvals and permits. remedy: obtain approvals and permits if feasible or restore to prior legal condition.

    Aug 23, 2005

    Resolve
  • Non-hazardous

    Work w/o a permit. work noted: in that at side of bldg a large wooden deck was constructed w/o approvals and permits. remedy: obtain approvals and permits if feasible or restore to prior legal condition.

    Aug 16, 2005 · Penalty $250

    Active