800 Victory Boulevard
Staten Island, NY 10301BBL 5-00593-0001Map
Owner of record: Si Victory LLC
800 Victory Boulevard is an elevator apartment building built in 1961 in Staten Island, 10301. It has 150 residential units across 7 floors. The owner of record is Si Victory LLC. HPD has recorded 184 housing violations here, most recently on October 11, 2026. 16 of the 50 most recent violations are still open. City tax records listed 150 rent-stabilized apartments here in 2024.
- HPD violations
- 184
- DOB violations
- 47
- ECB violations
- 32
- HPD complaints
- 985
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 184
- ANon-hazardous
Replace with new the missing safety caps at electrical outlet at north wall section a-m at public hall, 5th story
Oct 11, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective concrete floor at cellar level section a-m at public hall
Oct 11, 2026
Open — Nov sent out - CImmediately hazardous
Remove device preventing door from being self-closing hook and eye at 1st door from east at south at cellar level at building front
Oct 6, 2026
Open — Violation will be reinspected - CImmediately hazardous
Remove device preventing door from being self-closing hook and eye at 1st fire door at west at cellar level section west at garage
Oct 6, 2026
Open — Violation will be reinspected - BHazardous
Install and maintain sufficient light or lights of at least 100 watts incandescent or equivalent each, to light adequately from sunset to sunrise the east yard
Oct 6, 2026
Open — Nov certified on time - BHazardous
Install and maintain sufficient light or lights of at least 100 watts incandescent or equivalent each, to light adequately from sunset to sunrise the south yard
Oct 6, 2026
Open — Nov certified on time - ANon-hazardous
Replace with new the missing safety caps at electrical outlet at west wall at cellar level at public hall, section ''a-m''
Oct 6, 2026
Open — Nov certified on time - ANon-hazardous
Replace with new the missing safety caps at 1st electrical outlet from west at north wall at cellar level section east at garage
Oct 6, 2026
Open — Nov certified on time - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall in the 2nd bathroom from east located at apt 3m, 3rd story, 6th apartment from west at north
May 20, 2026 · Apt 3M
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic wall tiles at west wall in the 2nd bathroom from east located at apt 3m, 3rd story, 6th apartment from west at north
May 20, 2026 · Apt 3M
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3m, 3rd story, 6th apartment from west at north
May 20, 2026 · Apt 3M
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door leading to section west( section n-z) at cellar
May 5, 2026
Closed — Violation closed - BHazardous
Refit door at building entrance at cellar
May 5, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 7th room from north located at apt 3m, 3rd story, 6th apartment from west at north , section ''west''
Apr 22, 2026 · Apt 3M
Closed — Violation closed - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at secondary egress at north in the 7th room from north located at apt 3m, 3rd story, 6th apartment from west at north , section ''west''
Apr 22, 2026 · Apt 3M
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt 3m, 3rd story, 6th apartment from west at north , section ''west''
Apr 22, 2026 · Apt 3M
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at secondary egress door at north in the 7th room from north located at apt 3m, 3rd story, 6th apartment from west at north , section ''west''
Apr 22, 2026 · Apt 3M
Closed — Violation closed - BHazardous
Abate the nuisance consisting of pests. evidence of flies at cellar level in the entire apartment located at cellar apt lx, 1st cellar apt from west at north , section ''n-z''
Apr 21, 2026 · Apt LX
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from east located at cellar apt lx, 1st cellar apt from west at north , section ''n-z''
Apr 21, 2026 · Apt LX
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from east located at cellar apt lx, 1st cellar apt from west at north , section ''n-z''
Apr 21, 2026 · Apt LX
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at cellar apt lx, 1st cellar apt from west at north , section ''n-z''
Apr 21, 2026 · Apt LX
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt lx, 1st story, 1st apartment from south at west , section ''n-z''
Apr 15, 2026 · Apt LX
Open — Not complied with - BHazardous
Abate the nuisance consisting of pests. evidence of flies in the entire apartment located at apt lx, 1st story, 1st apartment from south at west , section ''n-z''
Apr 15, 2026 · Apt LX
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north wall in the 2nd room from north at west located at apt lx, 1st story, 1st apartment from south at west , section ''n-z''
Apr 15, 2026 · Apt LX
Open — Not complied with - BHazardous
Abate the nuisance consisting of pests. evidence of flies in the entire apartment located at apt lx, 1st apartment from west at north , section ''east''
Apr 4, 2026 · Apt LX
Open — Not complied with - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt lx, 1st apartment from west at north , section ''east''
Apr 4, 2026 · Apt LX
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2n, 2nd story, 1st apartment from east at south , section ''east''
Feb 1, 2026 · Apt 2N
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door leading to boiler room at north at cellar
Jan 16, 2026
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over the ceiling in the foyer located at apt 6t, 6th story, 6th apartment from east at south , section ''n-z''
Dec 11, 2025 · Apt 6T
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the foyer located at apt 6t, 6th story, 6th apartment from east at south , section ''n-z''
Dec 11, 2025 · Apt 6T
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over the ceiling in the 4th room from east located at apt 6t, 6th story, 6th apartment from east at south , section ''n-z''
Dec 11, 2025 · Apt 6T
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from east located at apt 6t, 6th story, 6th apartment from east at south , section ''n-z''
Dec 11, 2025 · Apt 6T
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 4th room from east located at apt 6t, 6th story, 6th apartment from east at south , section ''n-z''
Dec 11, 2025 · Apt 6T
Open — Not complied with - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2t, 2nd story, 5th apartment from east at south
Dec 8, 2025 · Apt 2T
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked door at basement at basement
Dec 8, 2025
Closed — Violation closed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate in the entire apartment located at apt 3v, 3rd story, 2nd apartment from south at west , section ''n-z''
Dec 7, 2025 · Apt 3V
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroom located at apt 2d, 2nd story, 4th apartment from east at south , section ''a-m''
Dec 1, 2025 · Apt 2D
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective lower sash counter balance at 1st window from east at south in the 1st room from east located at apt 2d, 2nd story, 4th apartment from east at south , section ''a-m''
Dec 1, 2025 · Apt 2D
Closed — Violation dismissed - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at fire door at stair b at public hall, 2nd story, section ''a-m''
Dec 1, 2025
Closed — Violation dismissed - BHazardous
Refit door in the entrance located at apt 2d, 2nd story, 4th apartment from east at south , section ''a-m''
Dec 1, 2025 · Apt 2D
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 2d, 2nd story, 4th apartment from east at south , section ''a-m''
Dec 1, 2025 · Apt 2D
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2d, 2nd story, 4th apartment from east at south , section ''a-m''
Dec 1, 2025 · Apt 2D
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective upper sash counter balance at 2nd window from north at east in the kitchen located at apt 2t, 2nd story, 5th apartment from east at south , section ''east''
Nov 14, 2025 · Apt 2T
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective lower sash counter balance at 1st window from north at east in the kitchen located at apt 2t, 2nd story, 5th apartment from east at south , section ''east''
Nov 14, 2025 · Apt 2T
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective lower sash counter balance at 2nd window from north at east in the kitchen located at apt 2t, 2nd story, 5th apartment from east at south , section ''east''
Nov 14, 2025 · Apt 2T
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall at public hall, 2nd story, section ''east''
Nov 14, 2025
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at east wall at public hall, 2nd story, section ''east''
Nov 14, 2025
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective upper sash counter balance at 1st window from north at east in the kitchen located at apt 2t, 2nd story, 5th apartment from east at south , section ''east''
Nov 14, 2025 · Apt 2T
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective lower sash counter balance at 2nd window from south at west in the 4th room from east located at apt 2t, 2nd story, 5th apartment from east at south , section ''east''
Nov 14, 2025 · Apt 2T
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective lower sash counter balance at 1st window from south at west in the 4th room from east located at apt 2t, 2nd story, 5th apartment from east at south , section ''east''
Nov 14, 2025 · Apt 2T
Closed — Violation dismissed
DOB building violations · 47
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 24, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 5, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 5, 2020
Dob violation - resolved - Retaining wall none
Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09
Oct 1, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 29, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 29, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 16, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 16, 2018
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2017
Dob violation - dismissed
Show 37 more ↓
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 7, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 7, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 12, 2015
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2015
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 6, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 8, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 8, 2014
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 3, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 22, 2013
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - dismissed - Facade facade optional
Unsafe report filed
Apr 11, 2012
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 14, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 17, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 28, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 8, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 8, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 16, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 16, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 18, 2006
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Oct 1, 2005
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 2, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 2, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 8, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 4, 2003
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 4, 2003
Dob violation - resolved - Elevator elevatorrequired
5p215
Aug 15, 2002
Dob violation - resolved - Elevator elevatorrequired
#73-restore elevator to service
May 1, 1990
Dob violation - resolved - Elevator elevatorrequired
(51) clean installation (52) repair motor room (water leak) (11 & 12) repair bells
Mar 21, 1989
Dob violation - resolved - Elevator elevatorrequired
(51) clean installation (52) lock down smoke hole grating (53) tag governor after 5yr safety test (54) repair work lights
Feb 16, 1989
Dob violation - resolved - Elevator elevatorrequired
(51) clean installation (52)repair cab fan (53) lock down smoke hole grating (54) tag governor after 5yr safety test (55) repair work lights
Feb 16, 1989
Dob violation - resolved - Elevator elevatorrequired
15)provide.plexiglass for inspection frame provide set screw for.same.51)repair.motor.room.wall.52).repair.on.replace.cab.flooring 53)conduct.of.inspection.from.the.dept.the following.test full.load lift,black.load,tact.speed,file.application.for.change.of operation
Jul 22, 1988
Dob violation - resolved - Elevator elevatorrequired
(16)provide plexiglass and set screw for same.(33) clean and adjust all hoistway door tracks, rollers , and properly lubricate where required
Jul 22, 1988
Dob violation - resolved - Elevator elevatorrequired
(15)provide plexi glass for inspection frame ,provide set screw for same.(51)repair motor room wall(52)repair or replace cab flooring (53)conduct in presence of inspector from this dept.the following test (full load lift, blanck load,tact speed, file application for change of operator
Jul 22, 1988
Dob violation - resolved - Elevator elevatorrequired
(12)bell (21)clean (28,29)noise (51)clean installation (52)repair cab fan (53)lock down smoke hole grating (54)tyag governor after 5 yr safety test (55)repair work lights
Feb 16, 1988
Dob violation - active
ECB violations · 32
- Class - 2
1) the door operator chain is slack (8.11.2.1.1). 2) the door restrictor needs adjustment (the lack can go under the roller)(8.11.2.1.1). 3) the handrail on the steps going to the motor-room is damage (8.11.2.1
Sep 1, 2026 · Penalty $625
Active - Class - 2
Failure to maintain buildings exterior facade and/or appurtenances.at time of inspection i observed the following conditions building#1(westbuilding).deteriorated/detaching mortar joints under the windowsills a
Feb 7, 2024 · Penalty $620
Resolve - Class - 1
3314.8 supported scaffold does not meet bldg code specifications,stop all work.noted:@ time of insp.pipe scaffold was installed around the balconies(4)on exp.#1.the guard rail system is inadequate the following
May 30, 2014 · Penalty $1,600
Resolve - Class - 1
3314.15.4 bridging. noted: at time of inspection 2 suspended scaffoldson exposure #2 were connected together in order to make one platform. designated foreman had workers dismantle/remove 3rd platform before in
Aug 6, 2013 · Penalty $1,600
Resolve - Class - 1
3314.6.3 ifeline and tiebacks. noted: at time of inspection 1 outrigger tiebacks and 1 line was secure at the same point of anchorage.(3lines)all lines and tie backs are to be attached independent of one anothe
Aug 6, 2013 · Penalty $1,600
Resolve - Class - 1
No special rigger's license. noted: as of inspection suspended scaffold's (3) were hanging on exposure#3.supervision/use of rigging equipment w/o a riggers license.workers dismantled all 3 scaffolds prior to my
Dec 12, 2012 · Penalty $4,800
Resolve - Class - 2
Noted at the time of insp observed in the living room area the ceilingarea had fallen the area is appx 5ft wide by 10ft long area is exposedand the insulation is exposed also the hallway on the 6fl hallway has
Sep 1, 2011 · Penalty $250
Resolve - Class - 1
Installation of boiler & storage tanks w/o plan or permits on file w/ the nyc dob
Mar 17, 2010 · Penalty $1,600
Resolve - Class - 1
36
Mar 17, 2010
Resolve - Class - 3
70o02,81m07,69m07.
Feb 2, 2010 · Penalty $200
Resolve
Show 22 more ↓
- Class - 2
08v01,11x10,03h11,70o02,81m07,40i11,42g11,69m07. 11x-car station door closing button 03h-car door saddle 40i-mach room window 42g-wrong sizefuses & cannot read.
Feb 2, 2010 · Penalty $500
Resolve - Class - 2
16t07,08a01,42g11,56y13,56o02,97h11,100h11. 16)number all hoistway doors 08)adjust leveling 42)replace time delay fuses 56) oil leak main machine 56)clean main machine 97)car saddle worn 100)mo rollers worn rep
Dec 15, 2009 · Penalty $500
Resolve - Class - 2
70o02,16t07,42g,1110m07,08a01,24l11. 70)clean pit 16)number all hoist way doors 42)replace all time delay fuses 10)provide second gib 08)adjust leveling 24)p i's hallways bulbs out.
Dec 15, 2009 · Penalty $500
Resolve - Class - 1
Installation of new boiler w/o plans or permits on file with the nyc dept. of bldg.
Sep 2, 2009 · Penalty $800
Resolve - Class - 2
36 boiler not registered
Sep 2, 2009 · Penalty $500
Resolve - Non-hazardous
55-y-13,86-u-05,64-q-03,71-q-03,03-d-06,67-o-02,68-o-02,16-o-02,38-o-02,41-g-11,34-q-03/55-oil leak main machine/86-2 yr test/63-nyc device # main line/64-pit light unguarded/71-under car light/67-clean car
Jul 21, 2006
Resolve - Non-hazardous
O8v01/05m07/17m07/62o02/32b06/37p17. 05m 2nd gib missing. 17m lobby door 2nd gib. 32b wiring open to cab lights provide greenfield.
Feb 4, 2003 · Penalty $180
Resolve - Non-hazardous
Work without a permit.work noted approx.20 metal cylendere filled with concrete have been cut into sheet.also note 2-25 foot bars have been installed to stop cars from parking on weekends.barracade can prevent
Nov 1, 2002 · Penalty $800
Resolve - Non-hazardous
08v11,15l11,16m07,15b11,35p17.15l-excessive clearance of between hoistway door 5 inclosure.15b-hoistway door have to be self closing.
Jul 22, 2000
Resolve - Non-hazardous
35i11,53m07,57o02. 35- motor room window 53- provide light and switch
Mar 1, 2000 · Penalty $350
Resolve - Non-hazardous
16m,16h,35i. 5 floor broken window.
May 6, 1999 · Penalty $350
Resolve - Non-hazardous
3h,16h, worn floor covering.
May 6, 1999 · Penalty $350
Resolve - Non-hazardous
07l15b28e 07-door opening button not working 15-1st floor door not opening sufficient 28-guide shoes rubbing oil rail.
May 22, 1998
Resolve - Non-hazardous
07l37g08v 07-open door button not working 37-remove wire from fuse holder. 08-adjust floor stop.
May 22, 1998
Resolve - Non-hazardous
46h47h35o30o74d22b61o23o74l50o73o 74-0-02-clean car top 22-b-07-removebolts from emrg. exit provide proper locks 74-l-11-repair car top light
Apr 11, 1998 · Penalty $180
Resolve - Non-hazardous
50l47l35o52b14m61o23o55l30o 50-l-12-hoist machine very noisy-repair.
Apr 11, 1998
Resolve - Non-hazardous
21l,74#,46l,35l,73#. 21 hall. 74 adjust floor stops. 46 renew or cleancables for forthwith inspection. 35 window. 73 perform 5yr. test properly tag device and file elev. 3 form.
Sep 30, 1992
Resolve - Non-hazardous
74#,35y,50l,46m,733. 74 adjust floor stops. 35 clean or repair . 50 noise. 46 cable guard . 73 5yr. test perform, properly tag device and file elv. 3 form for elev./
Sep 30, 1992
Resolve - Non-hazardous
28l 74# 74a# 46o 50y 14m 74 adjust floor stops 74a secure smoke hole grating to motor room floor 46 clean for futher inspection 14 provide insp card in elev cab
Jun 6, 1991
Resolve - Non-hazardous
14m 57o 35l 46i 74# 74#a 14 provide 1wsp card in fram 35 light 74 secure smoke file grating to motor rm floor 74a provide all elec covers for installation
Jun 6, 1991
Resolve - Non-hazardous
14m7, 73o2, 50y11,52m6,74##, 11l11, 74a## #11 permanent lighting #74 adjust floor steps #52 elec covers. #74a repair work lights.
Mar 13, 1991
Resolve - Non-hazardous
14m7, 73o02, 50y11, 11;11, 52m6,74##, 74a## #74 adjust floor stops #11 permanent lighting #52 elec cover. #74a repair work lights.
Mar 13, 1991
Resolve
Complaints
- Heat/hot water
Entire building
Oct 17, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 11, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 6, 2026 · Apt BLDG
Close - Unsanitary condition
Sewage
Aug 20, 2026 · Apt LOBBYA
Close - Outside building
Gutter/leader
Aug 20, 2026 · Apt LOBBYA
Close - Water leak
Heavy flow
Aug 20, 2026 · Apt LOBBYA
Close - Heat/hot water
Entire building
May 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 23, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
May 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 23, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
May 23, 2026 · Apt 6H
Close - Plumbing
Water supply
May 23, 2026 · Apt 6H
Close - Plumbing
Water supply
May 23, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
May 3, 2026 · Apt LX
Close - Heat/hot water
Entire building
Apr 21, 2026 · Apt 3M
Close - Heat/hot water
Entire building
Apr 21, 2026 · Apt LX
Close - Unsanitary condition
Pests
Apr 19, 2026 · Apt LX
Close - Heat/hot water
Entire building
Apr 19, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Apr 16, 2026 · Apt LX
Close - Heat/hot water
Entire building
Apr 11, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 11, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 11, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 11, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 11, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 11, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 11, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 11, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 11, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 11, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 11, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 11, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 10, 2026 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1961
- Floors
- 7
- Residential units
- 150
- Building area
- 143,419 ft²
- Lot area
- 79,290 ft²
- Zoning
- R1-2
- Community board
- 501
- Council district
- 49
- Block / lot
- 593 / 1
- Assessed value
- $3,613,050
- Landmark / historic district
- No
HPD registration #500880, last renewed Aug 29, 2025.
Questions about 800 Victory Boulevard
Who owns 800 Victory Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is Si Victory LLC.
Does 800 Victory Boulevard have violations?
Yes. NYC HPD has recorded 184 housing violations at this property.
Is 800 Victory Boulevard rent stabilized?
NYC Department of Finance tax bills listed 150 rent-stabilized units here in 2024 (about 100% of its 150 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 800 Victory Boulevard built?
City records list 1961 as the year it was built.
How many apartments are in 800 Victory Boulevard?
It has 150 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.