217 Broad Street
Staten Island, NY 10304BBL 5-00541-0021Map
Owner of record: Afonda, Paul
217 Broad Street is a mixed residential and retail building built in 1931 in Staten Island, 10304. It has 2 residential units across 3 floors. The owner of record is Afonda, Paul. HPD has recorded 27 housing violations here, most recently on October 2, 2019. 24 of the 27 most recent violations are still open.
- HPD violations
- 27
- DOB violations
- 20
- ECB violations
- 0
- HPD complaints
- 55
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 27
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls & ceilings in the entire apartment located at apt 2, 2nd story
Oct 2, 2019 · Apt 2
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective outer glass pane at lower window sash in the kitchen located at apt 2, 2nd story
Oct 2, 2019 · Apt 2
Open — Nov certified late - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story
Oct 2, 2019 · Apt 2
Closed — Violation dismissed - BHazardous
Properly secure the loose 1st wood tread from bottom at vestibule at public hall, 1st story
Oct 2, 2019
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective wall outlets in the entire apartment located at apt 1, 2nd story
Sep 30, 2013 · Apt 1
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective north wall tiles in the bathroom located at apt 1, 2nd story
Sep 30, 2013 · Apt 1
Open — Nov sent out - ANon-hazardous
Refit door in the bathroom located at apt 1, 2nd story
Sep 30, 2013 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the broken or defective north window counter balance in the 1st room from east located at apt 1, 2nd story
Sep 30, 2013 · Apt 1
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets bathtub hot water in the bathroom located at apt 1, 2nd story
Sep 30, 2013 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the broken or defective bathtub shower head in the bathroom located at apt 1, 2nd story
Sep 30, 2013 · Apt 1
Open — Nov sent out
Show 17 more ↓
- BHazardous
Properly repair the broken or defective shower door in the bathroom located at apt 1, 2nd story
Sep 30, 2013 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the broken or defective ceiling light fixture above sink in the kitchen located at apt 1, 2nd story
Sep 30, 2013 · Apt 1
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 3, 3rd story
Jan 13, 2012 · Apt 3
Open — Nov sent out - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 3, 3rd story
Jan 13, 2012 · Apt 3
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor under radiator in the kitchen located at apt 3, 3rd story
Jan 13, 2012 · Apt 3
Open — Nov sent out - BHazardous
Repair the broken or defective connection wasteline leaking at sink in the kitchen located at apt 3, 3rd story
Jan 13, 2012 · Apt 3
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor inside base cabinets at sink in the kitchen located at apt 3, 3rd story
Jan 13, 2012 · Apt 3
Open — Nov sent out - BHazardous
Properly secure the loose electrical outlet at lower west wall in the kitchen located at apt 3, 3rd story
Jan 13, 2012 · Apt 3
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 3, 3rd story
Dec 7, 2011 · Apt 3
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective wood cabinets at east wall in the kitchen located at apt 3, 3rd story
Dec 7, 2011 · Apt 3
Open — Not complied with - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 3, 3rd story
Dec 7, 2011 · Apt 3
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color north wall in the kitchen located at apt 3, 3rd story
Dec 7, 2011 · Apt 3
Open — Not complied with - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 3, 3rd story
Dec 7, 2011 · Apt 3
Open — Not complied with - ANon-hazardous
Refit entrance door in the 2nd room from east located at apt 3, 3rd story
Dec 7, 2011 · Apt 3
Open — Nov sent out - BHazardous
Properly repair the broken or defective light fixture at ceiling in the private hallway located at apt 3, 3rd story
Dec 7, 2011 · Apt 3
Open — Not complied with - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 3, 3rd story
Dec 7, 2011 · Apt 3
Open — Not complied with - BHazardous
Properly repair the broken or defective door bell at public hall, 1st story
Dec 7, 2011
Open — Nov sent out
DOB building violations · 20
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active
Show 10 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 8, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 4, 1993
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Heat/hot water
Apartment only
Dec 4, 2020 · Apt 1
Close - Paint/plaster
Wall
Jan 6, 2020 · Apt 2
Close - Paint/plaster
Door/frame
Jan 6, 2020 · Apt 2
Close - Paint/plaster
Ceiling
Jan 6, 2020 · Apt 2
Close - Flooring/stairs
Stairs
Sep 24, 2019 · Apt 2
Close - Door/window
Window pane
Sep 24, 2019 · Apt 2
Close - Paint/plaster
Wall
Sep 24, 2019 · Apt 2
Close - Paint/plaster
Ceiling
Sep 24, 2019 · Apt 2
Close - Flooring/stairs
Stairs
Sep 24, 2019 · Apt 2
Close - General
Windows
Sep 23, 2013 · Apt 1
Close
Show 40 more ↓
- General
Doors
Sep 23, 2013 · Apt 1
Close - Plumbing
Shower-stall
Sep 23, 2013 · Apt 1
Close - Paint/plaster
Wall
Sep 23, 2013 · Apt 1
Close - Paint/plaster
Wall
Sep 23, 2013 · Apt 1
Close - Electric
Wiring
Sep 23, 2013 · Apt 1
Close - Electric
Bell-buzzer/intercom
Sep 23, 2013 · Apt 1
Close - Nonconst
Vermin
Sep 23, 2013 · Apt 1
Close - Plumbing
Bathtub/shower
Sep 23, 2013 · Apt 1
Close - General
Ceramic-tile
Sep 23, 2013 · Apt 1
Close - Heating
Heat related
Jan 12, 2012 · Apt 3
Close - Plumbing
Basin/sink
Jan 12, 2012 · Apt 3
Close - Electric
Electric-supply
Jan 12, 2012 · Apt 3
Close - Electric
Wiring
Jan 12, 2012 · Apt 3
Close - General
Cabinet
Jan 12, 2012 · Apt 3
Close - Heating
Heat related
Jan 12, 2012 · Apt 3
Close - Heating
Heat related
Jan 12, 2012 · Apt 3
Close - Plumbing
Radiator
Jan 12, 2012 · Apt 3
Close - Nonconst
Vermin
Jan 12, 2012 · Apt 3
Close - Nonconst
Vermin
Jan 12, 2012 · Apt 3
Close - General
Floor
Jan 12, 2012 · Apt 3
Close - General
Ceramic-tile
Dec 7, 2011 · Apt 3
Close - Heating
Heat related
Nov 22, 2011 · Apt 3
Close - General
Ceramic-tile
Oct 28, 2011 · Apt 3
Close - General
Floor
Oct 28, 2011 · Apt 3
Close - Plumbing
Radiator
Oct 28, 2011 · Apt 3
Close - General
Ceramic-tile
Oct 28, 2011 · Apt 3
Close - General
Window guards
Oct 28, 2011 · Apt 3
Close - Electric
Lighting
Oct 28, 2011 · Apt 3
Close - General
Doors
Oct 28, 2011 · Apt 3
Close - Paint/plaster
Ceiling
Oct 28, 2011 · Apt 3
Close - Nonconst
Vermin
Oct 28, 2011 · Apt 3
Close - Electric
Lighting
Oct 28, 2011 · Apt 3
Close - General
Floor
Oct 28, 2011 · Apt 3
Close - Appliance
Refrigerator
Oct 28, 2011 · Apt 3
Close - General
Cabinet
Oct 28, 2011 · Apt 3
Close - General
Floor
Oct 28, 2011 · Apt 3
Close - Plumbing
Basin/sink
Oct 28, 2011 · Apt 3
Close - Plumbing
Radiator
Oct 28, 2011 · Apt 3
Close - Electric
Bell-buzzer/intercom
Oct 28, 2011 · Apt 3
Close - General
Floor
Oct 28, 2011 · Apt 3
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S2)
- Year built
- 1931
- Floors
- 3
- Residential units
- 2
- Building area
- 2,400 ft²
- Lot area
- 2,500 ft²
- Zoning
- R3-2
- Community board
- 501
- Council district
- 49
- Block / lot
- 541 / 21
- Assessed value
- $42,960
- Landmark / historic district
- No
Questions about 217 Broad Street
Who owns 217 Broad Street?
The owner of record in NYC Department of City Planning PLUTO data is Afonda, Paul.
Does 217 Broad Street have violations?
Yes. NYC HPD has recorded 27 housing violations at this property.
Is 217 Broad Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 217 Broad Street built?
City records list 1931 as the year it was built.
How many apartments are in 217 Broad Street?
It has 2 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.