209 Broad Street
Staten Island, NY 10304BBL 5-00541-0018Map
Owner of record: J&M Broad Property LLC
209 Broad Street is a mixed residential and retail building built in 1931 in Staten Island, 10304. It has 4 residential units across 3 floors. The owner of record is J&M Broad Property LLC. HPD has recorded 127 housing violations here, most recently on October 8, 2026. 23 of the 50 most recent violations are still open.
- HPD violations
- 127
- DOB violations
- 22
- ECB violations
- 7
- HPD complaints
- 267
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 127
- BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at ceiling and west wall at public hall, 1st story
Oct 8, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and west wall at public hall, 1st story
Oct 8, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance door
Oct 8, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 7, 2026
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items at 3rd story balcony at fire escape at building front
Apr 26, 2026
Open — Nov sent out - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at the building entrance , 1st story
Apr 26, 2026
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household items at vestibule area , 1st story
Apr 26, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges and latch at building entrance door , 1st story
Apr 26, 2026
Open — Not complied with - CImmediately hazardous
Remove the illegal fastening double cylinder key operated locking device at building entrance door , 1st story
Apr 26, 2026
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling at vestibule area , 1st story
Apr 26, 2026
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Cleanse and disinfect to the satisfaction of this department after removing the rubbish at vestibule area , 1st story
Apr 26, 2026
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story
Jan 23, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule door , 1st story
Jan 23, 2026
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed wires at ceiling at public hall, 1st story
Jan 23, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story
Jan 23, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of construction materials and household items at public hall, 1st story
Jan 23, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective mortis lock at building front door , 1st story
Jan 23, 2026
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening slidebolt capable of padlock at building entrance door , 1st story
Sep 9, 2025
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at public hall, 3rd story
Sep 9, 2025
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over the ceiling at public hall, 3rd story
Sep 9, 2025
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling at public hall, 3rd story
Sep 9, 2025
Open — Nov sent out - BHazardous
Fire egress defective. make stationary the iron ladder leading to scuttle opening in roof at south wall at public hall, 3rd story
Sep 9, 2025
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at public hall, 1st story
Sep 9, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building., 1st story
Sep 9, 2025
Open — Nov sent out - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at building entrance door , 1st story
Sep 9, 2025
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 3rd story
Sep 9, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance door , 1st story
Sep 9, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 3f, 3rd story, 1st apartment from east at south
Sep 9, 2025 · Apt 3F
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 12, 2025
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioning unit at building front balcony at fire escape, 3rd story
Apr 10, 2025
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at north wall, east wall and at south wall in the bathroom located at apt 3f, 3rd story, 1st apartment from east at south original violation 17663940 issued 31-jan-25 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jan 31, 2025 · Apt 3F
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen located at apt 3f, 3rd story, 1st apartment from east at south
Jan 31, 2025 · Apt 3F
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at north wall, east wall and at south wall in the bathroom located at apt 3f, 3rd story, 1st apartment from east at south
Jan 31, 2025 · Apt 3F
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective base board radiator at north wall in the bathroom located at apt 3f, 3rd story, 1st apartment from east at south
Jan 31, 2025 · Apt 3F
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 16, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 29, 2023
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective counter balance lower sash, window at north wall in the 1st room from north located at apt 3r, 3rd story, 1st apartment from west at north
Sep 20, 2022 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at vestibule entrance at public hall, 1st story
Sep 20, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 8, 2022
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at ceiling in the bathroom located at apt 3r, 3rd story, 1st apartment from east at south
Jan 28, 2022 · Apt 3R
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at ceiling in the kitchen located at apt 3r, 3rd story, 1st apartment from east at south
Jan 28, 2022 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south
Jan 28, 2022 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south
Jan 28, 2022 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Jan 28, 2022
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 16, 2021
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2r, 2nd story, apartment at north
Oct 27, 2017 · Apt 2R
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 2f, 2nd story, apartment at south
Oct 27, 2017 · Apt 2F
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2f, 2nd story, apartment at south
Oct 27, 2017 · Apt 2F
Closed — Violation closed - CImmediately hazardous
Properly repair the broken or defective balance lower sash 1st window from east at south wall leading to fire escape in the kitchen located at apt 2f, 2nd story, apartment at south
Oct 27, 2017 · Apt 2F
Closed — Violation closed - BHazardous
Properly repair the broken or defective balance lower sash 2nd window from east at south wall in the kitchen located at apt 2f, 2nd story, apartment at south
Oct 27, 2017 · Apt 2F
Closed — Violation closed
DOB building violations · 22
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 8, 2017
Dob violation - dismissed
Show 12 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 4, 2016
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 9, 2011
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 9, 2011
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed
ECB violations · 7
- Class - 2
As per class 2ýb265¨ 28-303.7 failure to file a complete boiler inspection report as per dob records;correct violation and submit the certificate of correction
Jan 11, 2022 · Penalty $625
Active - Class - 2
Failure to properly connect conductors to terminals.observed at store panel branch circuit conductoers are double and triple lugged on circuit breakers,also green grounding conductors of mc type armored cable
Dec 9, 2016 · Penalty $600
Resolve - Class - 1
Electrical work without a permit.observed grd floor store has been wired for new panel.receptacle outlets,ceiling outlets and led strip fixtures prior to obtaining a permit.remedy:comply with eccode/obtain perm
Dec 9, 2016
Resolve - Class - 1
Work w/o permit. plumbing work w/o permit in cellar, and first floor time of inspection 11:25am at time of inspection i observed new copperpiping and near waste line in cellar and first flr.disconnection meter
Feb 4, 2016
Resolve - Class - 2
Failure to maintain bldg in code compliant manner: installation/maintenance of plumbing materials/equipment per pc102.3; 27-902. at time of inspection i observed pvc piping, and fernco couplings-probibited mat
Feb 4, 2016 · Penalty $250
Resolve - Class - 1
B101)installation of replacement boiler w/o plans or permits on file w/ the nyc dept of bldg.
Dec 15, 2010 · Penalty $1,600
Active - Class - 1
B154,36.
Dec 15, 2010 · Penalty $1,000
Active
Complaints
- Heat/hot water
Apartment only
Oct 6, 2026 · Apt 2R
Close - Heat/hot water
Apartment only
Sep 12, 2026 · Apt 2R
Close - Door/window
Door
Mar 30, 2026 · Apt BUILDI
Close - Paint/plaster
Ceiling
Mar 30, 2026 · Apt BUILDI
Close - Paint/plaster
Wall
Mar 30, 2026 · Apt BUILDI
Close - Door/window
Door
Mar 17, 2026 · Apt BLDG
Close - Door/window
Door
Jan 8, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jan 8, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Aug 5, 2025 · Apt 2R
Close - Safety
Fire escape
Mar 31, 2025 · Apt BLDG
Close
Show 40 more ↓
- Appliance
Refrigerator
Jan 21, 2025 · Apt 3F
Close - Paint/plaster
Wall
Jan 21, 2025 · Apt 3F
Close - Door/window
Door
Jan 21, 2025 · Apt 3F
Close - Appliance
Refrigerator
Oct 15, 2024 · Apt 3F
Close - Plumbing
Toilet
Jan 29, 2022 · Apt 3R
Close - Water leak
Damp spot
Jan 29, 2022 · Apt 3R
Close - Paint/plaster
Ceiling
Jan 29, 2022 · Apt 3R
Close - Flooring/stairs
Floor
Jan 29, 2022 · Apt 3R
Close - Heat/hot water
Apartment only
Jan 29, 2022 · Apt 3R
Close - Paint/plaster
Ceiling
Jan 27, 2022 · Apt 3R
Close - Flooring/stairs
Floor
Jan 27, 2022 · Apt 3R
Close - Plumbing
Toilet
Jan 27, 2022 · Apt 3R
Close - Heat/hot water
Apartment only
Jan 27, 2022 · Apt 3R
Close - Flooring/stairs
Floor
Jan 25, 2022 · Apt 3R
Close - Paint/plaster
Ceiling
Jan 25, 2022 · Apt 3R
Close - Plumbing
Toilet
Jan 25, 2022 · Apt 3R
Close - Heat/hot water
Apartment only
Jan 25, 2022 · Apt 3R
Close - General
Bell/buzzer/intercom
Jan 7, 2022 · Apt 3R
Close - Heat/hot water
Apartment only
Jan 7, 2022 · Apt 3R
Close - Flooring/stairs
Floor
Jan 6, 2022 · Apt 3R
Close - Paint/plaster
Ceiling
Jan 6, 2022 · Apt 3R
Close - Paint/plaster
Wall
Jan 6, 2022 · Apt 3R
Close - Paint/plaster
Ceiling
Jan 6, 2022 · Apt 3R
Close - Water leak
Damp spot
Jan 6, 2022 · Apt 3R
Close - Flooring/stairs
Floor
Jan 6, 2022 · Apt 3R
Close - Plumbing
Toilet
Jan 6, 2022 · Apt 3R
Close - Paint/plaster
Ceiling
Jan 6, 2022 · Apt 3R
Close - Heat/hot water
Apartment only
Jan 6, 2022 · Apt 3R
Close - Heat/hot water
Apartment only
Dec 17, 2021 · Apt 3R
Close - Heat/hot water
Apartment only
Dec 17, 2021 · Apt 3R
Close - Heat/hot water
Entire building
Dec 15, 2021 · Apt 3R
Close - Heat/hot water
Apartment only
Nov 9, 2021 · Apt 3R
Close - Water leak
Heavy flow
Nov 3, 2021 · Apt 3R
Close - Flooring/stairs
Floor
Nov 3, 2021 · Apt 3R
Close - Plumbing
Toilet
Nov 3, 2021 · Apt 3R
Close - Paint/plaster
Ceiling
Nov 3, 2021 · Apt 3R
Close - Flooring/stairs
Floor
Nov 3, 2021 · Apt 3R
Close - Flooring/stairs
Floor
Nov 3, 2021 · Apt 3R
Close - Heat/hot water
Entire building
Nov 3, 2021 · Apt 3R
Close - Heat/hot water
Entire building
Nov 2, 2021 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S4)
- Year built
- 1931
- Floors
- 3
- Residential units
- 4
- Building area
- 4,125 ft²
- Lot area
- 2,500 ft²
- Zoning
- R3-2
- Community board
- 501
- Council district
- 49
- Block / lot
- 541 / 18
- Assessed value
- $286,650
- Landmark / historic district
- No
HPD registration #500164, last renewed Aug 4, 2025.
Questions about 209 Broad Street
Who owns 209 Broad Street?
The owner of record in NYC Department of City Planning PLUTO data is J&M Broad Property LLC.
Does 209 Broad Street have violations?
Yes. NYC HPD has recorded 127 housing violations at this property.
Is 209 Broad Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 209 Broad Street built?
City records list 1931 as the year it was built.
How many apartments are in 209 Broad Street?
It has 4 residential units and 5 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.