roofy

1-50 Beach 81 Street

Queens, NY 11693BBL 4-16130-0001Map

Owner of record: Dayton Beach Park 1 Corp

1-50 Beach 81 Street is an elevator apartment building built in 1963 in Queens, 11693. It has 458 residential units across 13 floors. The owner of record is Dayton Beach Park 1 Corp. HPD has recorded 257 housing violations here, most recently on October 14, 2026. 47 of the 50 most recent violations are still open.

HPD violations
257
DOB violations
163
ECB violations
78
HPD complaints
515

What to know

Concern
15 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Oct 14, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 257

  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1d, 1st story, 1st apartment from west at north , section ''a-j'', at north

    Oct 14, 2026 · Apt 1D

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling at basement

    Oct 14, 2026

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective fire retardant materials at ceiling at basement

    Oct 14, 2026

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system . door locked at basement at boiler room

    Oct 14, 2026

    Open — Nov sent out
  • B

    Repair the broken or defective connection at wasteline at wash basin in the 1st bathroom from north located at apt 1d, 1st story, 1st apartment from west at north , section ''north''

    Oct 14, 2026 · Apt 1D

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1d, 1st story, 1st apartment from west at north , section ''north''

    Oct 14, 2026 · Apt 1D

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1d, 1st story, 1st apartment from west at north , section ''north''

    Oct 14, 2026 · Apt 1D

    Open — Nov sent out
  • A

    Repair the leaky and/or defective faucets at wash basin and at bathtub in the 2nd bathroom from north located at apt 1d, 1st story, 1st apartment from west at north , section ''north''

    Oct 14, 2026 · Apt 1D

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 2nd bathroom from north located at apt 1d, 1st story, 1st apartment from west at north , section ''north''

    Oct 14, 2026 · Apt 1D

    Open — Nov sent out
  • B

    Replace with new the missing ceramic wall tiles at east wall in the 2nd bathroom from north located at apt 1d, 1st story, 1st apartment from west at north , section ''north''

    Oct 14, 2026 · Apt 1D

    Open — Nov sent out
Show 40 more ↓
  • C

    Provide adequate supply of hot water for the fixtures , in the entire apartment located at apt 12h, 12th story, 3rd apartment from north at east , section ''a-j'', at north

    Oct 13, 2026 · Apt 12H

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1d, 1st story, 1st apartment from west at north

    Oct 13, 2026 · Apt 1D

    Open — Nov sent out
  • C

    Provide adequate supply of hot water for the fixtures throughout in the entire apartment located at apt 1d, 1st story, 1st apartment from west at north

    Oct 13, 2026 · Apt 1D

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at walls and ceilng in the bathroom located at apt 1d, 1st story, 1st apartment from west at north

    Oct 13, 2026 · Apt 1D

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic wall tiles at east wall in the bathroom located at apt 1d, 1st story, 1st apartment from west at north

    Oct 13, 2026 · Apt 1D

    Open — Nov sent out
  • C

    Provide adequate supply of cold water for the fixtures , in the entire apartment located at apt 12a, 12th story, 1st apartment from south at west , section ''a-j'', at north

    Oct 13, 2026 · Apt 12A

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 12a, 12th story, 1st apartment from south at west , section ''a-j'', at north

    Oct 13, 2026 · Apt 12A

    Open — Nov sent out
  • C

    Provide adequate supply of cold water for the fixtures , in the entire apartment located at apt 12h, 12th story, 3rd apartment from north at east , section ''a-j'', at north

    Oct 13, 2026 · Apt 12H

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1d, 1st story, 1st apartment from west at north

    Oct 13, 2026 · Apt 1D

    Open — Nov sent out
  • C

    Properly repair the source and abate the evidence of a water leak ceiling at public hall, 1st story, section at north

    Oct 13, 2026

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 12d, 12th story, 1st apartment from east at south

    Oct 13, 2026 · Apt 12D

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 12d, 12th story, 1st apartment from east at south

    Oct 13, 2026 · Apt 12D

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall

    Oct 13, 2026

    Open — Nov sent out
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall

    Oct 13, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hnges at fire door at laundry room at basement

    Oct 13, 2026

    Open — Nov sent out
  • C

    Remove device preventing door from being self-closing consisting of permanently installed kickstand at laundry room at basement

    Oct 13, 2026

    Open — Nov sent out
  • C

    Provide adequate supply of cold water for the fixtures throughout in the entire apartment located at apt 1d, 1st story, 1st apartment from west at north

    Oct 13, 2026 · Apt 1D

    Open — Nov sent out
  • C

    Provide adequate supply of hot water for the fixtures , in the entire apartment located at apt 12a, 12th story, 1st apartment from south at west , section ''a-j'', at north

    Oct 13, 2026 · Apt 12A

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling at basement at public hall

    Sep 14, 2026

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling at basement at public hall

    Sep 14, 2026

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1e, 2nd story, 2nd apartment from east at south

    Sep 1, 2026 · Apt 1E

    Open — Nov sent out
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 1e, 2nd story, 2nd apartment from east at south

    Sep 1, 2026 · Apt 1E

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the bathroom located at apt 1d, 2nd story, 1st apartment from east at south

    Aug 26, 2026 · Apt 1D

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the bathroom located at apt 3n, 3rd story, 8th apartment from north at east

    Jun 23, 2026 · Apt 3N

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1e, 1st story, 2nd apartment from west at north

    May 24, 2026 · Apt 1E

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1e, 1st story, 2nd apartment from west at north

    May 24, 2026 · Apt 1E

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective fire retardant materials at east wall at public hall, 1st story

    May 24, 2026

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at all walls at public hall, 1st story

    May 24, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective latch set at compactor closet, 12th story

    May 24, 2026

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective latch set at door at compactor closet, 12th story

    May 24, 2026

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling and east wall at public hall, 1st story

    May 24, 2026

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 7, 2026

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 7, 2026

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at west wall at public hall, 12th story, section at north

    Nov 10, 2025

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 9j, 9th story, 6th apartment from south at west

    Aug 30, 2025 · Apt 9J

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 9j, 9th story, 6th apartment from south at west

    Aug 30, 2025 · Apt 9J

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches at compactor closet, 12th story, section ''a-j'', at north

    Aug 26, 2025

    Open — Defect letter issued
  • B

    Properly repair with similar material the broken or defective fire-retardant material at west wall, south section at public hall, 12th story

    Jul 6, 2025

    Open — Not complied with
  • C

    Replace or repair the self-closing doors that is missing or defective hopper door in compactor closet at public hall, 12th story

    Jul 6, 2025

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department west wall at public hall, 12th story

    Jul 6, 2025

    Open — Not complied with

DOB building violations · 163

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2023)

    Jun 23, 2024

    Dob violation - active
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
Show 40 more ↓
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)

    Apr 22, 2023

    Dob violation - active
  • Construction other optional

    Boro commissioner has ordered work stopped for # 420909075 d ue to applicant withdrawal

    Apr 19, 2023

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9b technical report by 2/21/2023

    Feb 22, 2023

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9b technical report by 2/21/2023

    Feb 22, 2023

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2022

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 1, 2022

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2020

    Oct 10, 2021

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 16, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 6, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 12, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active

ECB violations · 78

  • Class - 1

    1. replace improper fuse. 2. replace top emergency exit cover switch . have to be manual resettable . 3. no door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 ny

    May 27, 2020 · Penalty $6,250

    Active
  • Class - 1

    No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. remedy; file application, install dlm a

    Apr 6, 2020 · Penalty $1,250

    Resolve
  • Class - 1

    No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. remedy; file application, install dlm a

    Apr 6, 2020 · Penalty $1,250

    Resolve
  • Class - 1

    No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. remedy; file application, install dlm a

    Apr 6, 2020 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply with commissioners order contained in summons/violation#38268863j issued on 03/20/19,and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01(d)(2).an acceptible certifica

    Jan 14, 2020 · Penalty $1,250

    Resolve
  • Class - 2

    56e1: (56,e,1) machine vibrating

    Jan 7, 2020 · Penalty $625

    Resolve
  • Class - 2

    67x10: (67,x,10) in car phone not working

    Jan 7, 2020 · Penalty $625

    Resolve
  • Class - 2

    67x10: (67,x,10) in car phone not working

    Jan 7, 2020 · Penalty $625

    Resolve
  • Class - 2

    In car phone not working, car door gap too big between return wall and car door,alarm bell insufficient check bell, brake maintenance tag expired 1/20/18

    Dec 24, 2019 · Penalty $310

    Resolve
  • Class - 1

    Improper fusing on the controller bypass, brake maintenance tag expired nov,12,2018.

    Dec 24, 2019 · Penalty $1,250

    Resolve
Show 40 more ↓
  • Class - 1

    Brake not picking car running through the brake extremely hot brake, brake tag expired , provide lights over the machine. must have capacity plus 125% for retest.

    Dec 24, 2019 · Penalty $1,250

    Resolve
  • Class - 1

    Door zone restrictor not working tempered with, brake tag missing, cat one tag missing.

    Dec 24, 2019 · Penalty $3,125

    Resolve
  • Class - 2

    59-bb-7, brake maintenance tag expired 1/10/18.

    Nov 27, 2019

    Resolve
  • Class - 2

    05-b-1, 41-m-7, 59-bb-7.(5,b,1) gap between car door & return wall toobig. (41,m,7) motor room door missing signage, (59,bb,7) brake maintenance tag expired.

    Nov 26, 2019 · Penalty $625

    Resolve
  • Class - 1

    Cu42n17; 59m7. 42n-remove jumper from safety circuit jump point 32-33repair and call dob for reinspection. 59m-provide c clip on machine brake pin.

    Aug 1, 2019 · Penalty $1,250

    Resolve
  • Class - 2

    14i10,41i10,57bb7,59bb7,67x10. 14i10-in car mirror damaged; 41i10-machine room door damaged; 57bb7-machine room fire extinguisher expired 59bb7-brake maintenance tag expired on 5/16/18; 67x10-in car phone not

    Mar 20, 2019 · Penalty $625

    Resolve
  • Class - 1

    3301.2failure to maintain const fence @ open excavated site.observed excavated area where old pool was removed,open holes,drains,open area s 4ft deep.area left unprotected no warning signs fence was open & w/

    Oct 3, 2018

    Resolve
  • Class - 1

    1. controller malfunction. car stops between floors during travel and levels up/down on various floors. unsafe for passengers. cease use device.…2. phone inoperative in car.…3. provide button for phone in car

    Sep 18, 2018 · Penalty $1,250

    Resolve
  • Class - 2

    1. work w/o permit. machine sheave replaced and machine ropes replaced without permit.…2. phone inoperative

    Sep 18, 2018 · Penalty $1,250

    Active
  • Class - 2

    Device being used to transport construction crew and materials without construction permit. device placed out of service by construction crew to allow them to transport materials. file application and obtain pe

    Sep 18, 2018 · Penalty $1,250

    Active
  • Class - 2

    97x10 restore to srvice so full inspection can be performed.

    Mar 30, 2018 · Penalty $625

    Resolve
  • Class - 2

    97x10 restore to service so full inspection can be done.

    Mar 30, 2018 · Penalty $625

    Resolve
  • Class - 1

    Cu7x10,97r9,2x10,41i10. 7x10-zone lock inoperative repair; entrance device running off of temp power w/o permits. remove; 2x10-outside comm inoprative repair; 41i10-motor room door camaged not self locking

    Jan 15, 2018 · Penalty $1,250

    Resolve
  • Class - 2

    97x10 restore elevator to service. make repairs.

    Jan 4, 2018 · Penalty $500

    Resolve
  • Class - 2

    50. oil tank not secured. secure tank as per flood zone.

    Oct 17, 2017 · Penalty $530

    Active
  • Class - 2

    Work without permit. noted: premises 15-story multi-dwelling frame building. removed existing swimming pool from northeast corner. demolition and back fill completed approx 70% application #421429127-01-al in p

    Sep 21, 2017 · Penalty $800

    Resolve
  • Class - 1

    05a10 restrictor is not operative (defective) this is a safety deviceto ensure elevators passengers safety.

    Aug 16, 2017 · Penalty $1,000

    Resolve
  • Class - 2

    97x17. restore to service so proper insp can be made by this bldg.

    Jul 25, 2017

    Resolve
  • Class - 2

    97x17)restore to sevice so proper inspection can be performed.

    Jul 25, 2017 · Penalty $1,250

    Resolve
  • Class - 1

    97x17 the elevator out of service.upon inspection the device is found to be out of service creating a hazardous condition as per 1rcny 11-02rem restore to service immediately & notify nyc dob the device has bee

    Jul 10, 2017 · Penalty $1,000

    Resolve
  • Class - 1

    97x17 the elevator out of service upon inspection the device is found to be out of service creating hazardous condition as per 1rcny11-02.rem restore to service immediately & notify nycdob the device has been r

    Jul 10, 2017 · Penalty $1,000

    Resolve
  • Class - 1

    05b10,05e11,39o02. 05b10-repair worn out door zone restrictor; 05e11 replace car door hanger rolelrs; 39o02-clean dirt car top; repair restrictor and contact nycdob at [email protected] and 212-393-2435 to

    Jun 20, 2017 · Penalty $1,000

    Resolve
  • Class - 2

    2x10,67b10,67m7. (2x)alarm system inoperative repair. (67b)communication insufficient repair. (67m)provide maintenance log & mcp (maintenance control program)

    Jun 1, 2017 · Penalty $500

    Resolve
  • Class - 2

    97x10. restore to service.

    Jun 1, 2017 · Penalty $250

    Resolve
  • Class - 1

    05a10,02m07,02m07,05l1. *05a10-door restrictor altered. adjust *ceaseuse item* 02m07-o alarm provide; 02m07-provide outside comm (phone in car) 05l1-door does not open in lobby when device stops. device waits

    May 8, 2017 · Penalty $1,030

    Resolve
  • Class - 1

    05m07cu, 02l10. 05m07-door restricto rmissign *cease use* 02l10-provide outside communication in device.

    May 8, 2017 · Penalty $1,030

    Resolve
  • Class - 1

    5a10,02b10,56y10,68m07 (05a10)cease use (hen)door zone retractor has been tampered with disabled and

    Mar 21, 2017 · Penalty $1,000

    Resolve
  • Class - 2

    56h10:noise coming from hoist machine;worn bearings or worn worm and gear

    Mar 8, 2017 · Penalty $530

    Resolve
  • Class - 2

    05x10,02b01,58h11,67x10. 05x10-restrictor is not operative; 02b01-in sufficiently high ringing (); 58h11-need replace worm bearnings; 67x10phone is not operative.

    Feb 6, 2017 · Penalty $500

    Resolve
  • Class - 2

    05x10,67x10. 05x10-restrictor is not operative; 67x10-phone is not operative.

    Feb 6, 2017 · Penalty $500

    Resolve
  • Class - 2

    05x10,02b01,67x16. 05x10-restrictor is not operative; 02b01-insufficiently high ringing song. 67x10-phone is not operative.

    Feb 6, 2017 · Penalty $500

    Resolve
  • Class - 2

    70o02, 56y02, 59u15, 07r09, 67l10. 07/r/09- zone lock inoperative, remove zip tie please.

    May 13, 2016 · Penalty $1,250

    Resolve
  • Class - 2

    07x10, 70o02, 59u15, 10h11, 71i10. 07/x/10- zone lock not working.

    May 13, 2016 · Penalty $1,250

    Resolve
  • Class - 2

    67l10, 10h11, 07j01, 39o02, 59u15. 07/j/01- zone lock not working.

    May 13, 2016 · Penalty $1,250

    Resolve
  • Class - 1

    02x10,67x10,05x10. 02x10-repair alarm bell; 67x10-repair emergency phone; 05x10-repair door zone lock.

    Jan 11, 2016 · Penalty $1,030

    Resolve
  • Class - 2

    01b10,02x10,70o02,14m07,99m07.(01b10)stop switch bell inoperative.(02x10)alarm bell inoperative.

    Oct 6, 2010 · Penalty $500

    Resolve
  • Class - 2

    99m07,14m07,70o02.(99m07)missing cat i test tag.

    Oct 6, 2010 · Penalty $500

    Resolve
  • Class - 2

    20b11-replace 5th floor vision glass

    Jun 15, 2009

    Resolve
  • Class - 2

    20b4. 20b11 replace 5th flr vision glass.

    Mar 23, 2009 · Penalty $250

    Resolve
  • Class - 2

    Failure to file an amended sixth round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report remedy:file an amended report following remedial repa

    Jan 9, 2009 · Penalty $4,000

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Oct 13, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Oct 13, 2026 · Apt 8S

    Open
  • Plumbing

    Water supply

    Oct 13, 2026 · Apt BLDG

    Open
  • Plumbing

    Water supply

    Oct 13, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Oct 13, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 13, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Oct 13, 2026 · Apt 1F

    Open
  • Heat/hot water

    Apartment only

    Oct 13, 2026 · Apt 1F

    Open
  • Plumbing

    Water supply

    Oct 13, 2026 · Apt 1D

    Close
  • Heat/hot water

    Entire building

    Oct 13, 2026 · Apt 1D

    Close
Show 40 more ↓
  • Plumbing

    Water supply

    Oct 13, 2026 · Apt 1N

    Close
  • Plumbing

    Water supply

    Oct 13, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Oct 13, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Oct 13, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Oct 13, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Oct 13, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 13, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Oct 13, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Oct 13, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Oct 13, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 13, 2026 · Apt 3D

    Close
  • Plumbing

    Water supply

    Oct 13, 2026 · Apt 3D

    Close
  • Plumbing

    Water supply

    Oct 13, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Oct 13, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Oct 13, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Oct 13, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 12, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 12, 2026 · Apt 1D

    Close
  • Plumbing

    Water supply

    Oct 12, 2026 · Apt 1D

    Close
  • Plumbing

    Water supply

    Oct 12, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Oct 12, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 12, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Oct 12, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 12, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 12, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Oct 12, 2026 · Apt BLDG

    Close
  • Plumbing

    Bathtub/shower

    Sep 22, 2026 · Apt 1E

    Open
  • Paint/plaster

    Ceiling

    Sep 22, 2026 · Apt 1E

    Open
  • Paint/plaster

    Ceiling

    Sep 9, 2026 · Apt 1E

    Close
  • Plumbing

    Bathtub/shower

    Sep 9, 2026 · Apt 1E

    Close
  • Unsanitary condition

    Mold

    Sep 9, 2026 · Apt 1E

    Close
  • Unsanitary condition

    Mold

    Aug 25, 2026 · Apt 1E

    Close
  • Unsanitary condition

    Mold

    Aug 23, 2026 · Apt 1D

    Close
  • Paint/plaster

    Wall

    Aug 23, 2026 · Apt 1D

    Close
  • Water leak

    Slow leak

    Aug 21, 2026 · Apt 1D1EAN

    Close
  • Unsanitary condition

    Pests

    Jul 15, 2026 · Apt 5T

    Close
  • Door/window

    Door

    Jun 19, 2026 · Apt 3N

    Close
  • Unsanitary condition

    Mold

    Jun 19, 2026 · Apt 3N

    Close
  • Heat/hot water

    Entire building

    May 23, 2026 · Apt BLDG

    Close
  • Water leak

    Heavy flow

    Mar 14, 2026 · Apt 1E

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D4)
Year built
1963
Floors
13
Residential units
458
Building area
553,520 ft²
Lot area
358,850 ft²
Zoning
R6
Community board
414
Council district
32
Block / lot
16130 / 1
Assessed value
$12,327,300
Landmark / historic district
No

HPD registration #420566, last renewed Nov 18, 2025.

Questions about 1-50 Beach 81 Street

Who owns 1-50 Beach 81 Street?

The owner of record in NYC Department of City Planning PLUTO data is Dayton Beach Park 1 Corp.

Does 1-50 Beach 81 Street have violations?

Yes. NYC HPD has recorded 257 housing violations at this property.

Is 1-50 Beach 81 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1-50 Beach 81 Street built?

City records list 1963 as the year it was built.

How many apartments are in 1-50 Beach 81 Street?

It has 458 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.